Loading...
HomeMy WebLinkAboutNR080817BridgeworkroadclosuretotakeplaceonAniniRoadfromAug28toAug31 CO U NT Y O F KAU A‘I BERNARD P. CARVALHO JR. Mayor WALLACE G. REZENTES JR. Managing Director DEPARTMENT OF PUBLIC WORKS News Release For Immediate Release: August 8, 2017 LYLE TABATA, ACTING COUNTY ENGINEER Tel (808) 241-4996 Fax (808) 241-6604 Bridgework, road closure to take place on ‘Anini Road from Aug. 28 to 31 ‘Anini – The Department of Public Works is announcing that Kaikor Construction Company will be installing a temporary bridge structure over the existing ‘Anini Bridge No. 2 on ‘Anini Road from Aug. 28 through Aug. 31, which will result in road closures during working hours. Dates and hours of the ‘Anini Road closures are as follows:  7 p.m. Monday, Aug. 28 - 7 a.m. Tuesday, Aug. 29  7 p.m. Tuesday, Aug. 29 - 7 a.m. Wednesday, Aug. 30  7 p.m. Wednesday, Aug. 30 - 7 p.m. Thursday, Aug. 31 Due to space and safety purposes, Kaua‘i Island Utility Cooperative may be asked to shut down power in the area at certain times during the road closure periods. Residents are encouraged to plan accordingly for their perishables and power needs during these periods. If a power outage is required, KIUC will post an announcement on its Facebook page with as much notice as possible. Anyone with questions may contact Donald Fujimoto at 241-4882 or email at dfujimoto@kauai.gov. ###