I. Mission
The Department of Public Works (DPW) Mission is to deliver excellent service to our
constituents and support the health and safety of their communities with sustainable services and
solutions.
II. Public Works at a Glance (Admin and Six Divisions)
Administration
Oversees and Manages Six Divisions with over 270 employees.
Provides Cost-Effective Administrative Support for FY 2018 Operating Budget of
$59,968,846.
Provides Cost-Effective Administrative Support for FY 2018 County of Kauai CIP
Budget of $40,748,350.
Provides General Policy Guidance to the Department’s Six Divisions.
Building Division
Code Enforcement, Maintenance and Project Management
o Issued 765 Building Permits, 1,887 Electrical Permits, 1,126 Plumbing/Gas Permits,
410 Sign code Permits, and 702 Photovoltaic/Solar Permits, for a total value of
$307,329,595 in FY 2017.
o Conducted 7,522 Building, 4,566 Electrical, 5,673 Plumbing/Gas Inspections for a
total of 17,761 total code inspections in FY 2017
Project Management of Building projects.
o Federal Highway Administration (FHWA) funding and the Department of Defense
(DOD) Innovative Readiness Training (IRT) grant were secured for the Kawaihau
Elevated Boardwalk project. Materials were secured and construction completed.
o Secured the Design/Build construction funds for the TIGER Grant project
improvements.
o In the process of implementing the IRT grant from the DOD for Phase C&D of the
Multi-Use Path.
Automotive Division
The Automotive Division filled vacancies and is working with the new employees to
meet the demands and requests of the various departments, agencies and the community
in regards to equipment supply and vehicle and equipment maintenance and repairs.
Procured new vehicles and equipment to modernize the fleet and keep the County
operating efficiently.
The current budget includes a host of equipment that will be a boost to recover from
several years of deferring vehicle and equipment replacements. A total of $2,827,000 is
submitted for approval which will come with a debt service in the way of lease payments
of $587,375 per year. These spent toward replacing vehicles and equipment for Solid
Waste, Wastewater, and Roads Division.
FY 2019 PW Budget Presentation Page 2
Engineering Division
Capital Improvement Program (CIP) Project Management (From March 2017 through
February 2018)
o Completed designs in-house for approximately $185,000 worth of construction
projects.
o Substantially completed approximately $6,400,000 worth of construction projects.
o Collector Road Federal aid program, support will be required to help advance island
wide resurfacing recovery, leveraging County funds of 20% to the Federal aid 80%,
with Engineered Plans, Specifications and Estimates as required to be approved
before work can begin.
Regulatory Review
o From March 2016 to February 2017, completed the regulatory review of 48 sets of
plans for subdivision projects and other large development projects, with an average
review time of 32 days.
Safe Routes to School (SRTS)
o Support Hawai'i Department of Transportation (HDOT) SRTS educational outreach
to non-participating Kaua'i schools to step up participation to apply for Infrastructure
Grants to improve pedestrian and bicycle facilities.
o Currently working on design of approximately $1,160,000 worth of SRTS projects
awarded in 2014 for infrastructure upgrades for 5 elementary schools on Kaua‘i.
Roads Division
Base Yard operations, Levees maintenance, Bridge and Road maintenance and
construction.
Completed execution of the present local roads Island Wide Resurfacing (IWR).
Preserved / Improved / Renovated / Resurfaced in FY 2017 and prepare and placed 2018
IWR out to bid to execute a contract before term of FY 2018.
Hanapēpē & Waimea Levee compliance
o Accomplished goal of maintaining levee compliance that permits participation on the
National Flood Insurance Program.
Wastewater Division
Operates and maintains four Wastewater Treatment Facilities, and sewer collections and
pumping systems located at Wailua, Līhu‘e, Ele`ele, and Waimea.
Ongoing capital improvements for all Wastewater Treatment Plant(s) (WWTP) and
Sewage Pump Station(s) (SPS) facility upgrades to meet State Department of Health
(DOH) Operations and Maintenance (O&M) environmental compliance.
Working towards addressing the odor issues in the Wailua/Coco Palms area.
o Installed two manhole odor control units and based on their initial performance,
which included discussions with some of the neighboring commercial properties, the
Division will install an additional four units to provide better coverage in the area.
o The Division contracted a design consultant to evaluate how the odors can be
minimized or prevented from being created within the Arzadon sewer force main.
August 2017 and February 2018 Operator License examinations had high pass rate at all
license levels, including another Grade IV operator.
Meeting National Pollutant Discharge Elimination System (NPDES) permit-required
compliance schedule for Wailua WWTP to abandon the ocean outfall.
FY 2019 PW Budget Presentation Page 3
Successfully performed a pilot test to add an influent filter at the Wailua WWTP.
Continuing discussions to better utilize the anaerobic digesters at the Līhu‘e WWTP,
particularly involving the possible capturing and use of the digester gas and reusing the
biosolids instead of disposing at the Kekaha Landfill.
Supporting Parks and Recreation in maintaining all septic systems south of Hanalei
Bridge.
Supporting Solid Waste Division in maintaining all facilities.
Contracted with consultant for design of Līhu‘e WWTP Process Improvements Ph I to
provide treatment capacity to accommodate future development.
Bid out the improvements to existing Hanamā‘ulu and Kapaia SPS projects, which will
provide upgraded facilities with increased capacity to accommodate future development.
Solid Waste Division
Operations of Kekaha Municipal Solid Waste (MSW) Landfill, Refuse Transfer Stations
(RTS) at Hanalei, Kapa‘a, Līhu‘e, and Hanapepe.
Continue to work toward addressing the Notice of Violation and Order (NOVO) for
NPDES permit violations with improvements at our four RTSs. On-going work
continues with the Department of Health (DOH) Clean Water Branch (CWB) to
complete designs to begin construction of facility upgrades by the fall of 2018.
Kekaha Landfill received 86,889 tons MSW (Municipal Solid Waste) in FY 2018.
Waste Diversion, County contracts diverted approximately 64,767 tons from the landfill
for an overall recycling rate of 44% in FY 2017.
Projected revenue for FY 2019 for residential refuse collection is $3.59 M which is
similar to last FY. In addition revenue projections for landfill tip fees is at $5 M, same as
last year.
Final preparation for the publication of the Draft Environmental Impact Statement is
coming to term for the new County Landfill.
Funds for the construction of Kekaha Landfill Cell 2 Lateral Expansion is secured and is
in the final design and permitting process before we begin construction.
Recycling Education and Awareness. The County Recycling Office continues to
promote and maintain awareness of the dozens of diversion opportunities available to
residents, visitors, and businesses. For a comprehensive list and explanations of
programs, see www.kauai.gov/recycling.
III. Challenges
Planning for future improvements while continuing to meet the day to day needs and
demands of the community.
Utilizing limited funds in the most efficient manner while maintaining satisfactory levels of
service.
The upswing of the economy has limited the recruitment of potential qualified personnel,
which makes succession planning more difficult.
Continuing to maintain a positive working relationship with our union partners.
IV. Overall Department Goals
The Department of Public Works Administration seeks to support the six Divisions within the
Department, by ensuring manpower, equipment, and materials needs are met adequately.
FY 2019 PW Budget Presentation Page 4
Implement systems that will serve to reduce complaints and ‘emergencies’ which will allow
us to focus on proactive activities.
Implement the Mayor’s Public Works Holo Holo 2020 projects.
Ensure the health, safety and welfare of the public.
Goals/Objectives Success Measurements Outcomes
Goal #1 Implement systems that will serve to reduce citizen complaints and ‘emergencies’
which will allow us to focus on proactive activities.
1. Enhance media relations by
providing information on
public works programs,
projects, services and
achievements
# of monthly updates in the
form of media releases.
# number of media releases
annually
Send communications that
affect the community as soon
as possible.
Messages which are clear and
concise.
2. Improve relations with
community groups and
other governmental and non-
governmental agencies
through periodic, scheduled
information exchange
sessions, to learn community
needs and concerns and to
educate the community
regarding department
responsibility, funding, and
projects
# of presentations provided to
community groups and other
governmental and
nongovernmental agencies
annually
Perform timely project
meetings securing community
support and buy-in, employ
Design Charrette process
when ever possible.
3. Public inquiries requiring
response.
Provide a response within 2
working days, if more detail
study is required supply an
estimated timeline.
Meet expectations.
Goal #2 Implement the Mayor’s Public Works Holo Holo 2020 projects.
1. Hanapepe Road
Resurfacing/Improvements
Retrofit
Have 100% Plans,
Specifications & Engineering
estimates (PS&E) to bid
construction phase.
May 2018
2. Kawaihau, Hauaala,
Mailihuna Road
Improvements
Have 100% Plans,
Specifications & Engineering
estimates (PS&E) to bid
construction phase.
May 2018
3. Poipu Road Improvements Have 100% Plans,
Specifications & Engineering
estimates (PS&E) to bid
May 2018
FY 2019 PW Budget Presentation Page 5
construction phase.
4. Puhi Road Improvements
Ph. I
Construction completed May 2017
5. Sheltered Bus Stop
Improvements Ph. III
6. Phase IV in process to
begin.
Construction complete February 2017
7. New Landfill Environmental Impact
Statement (EIS) Phase, Traffic
and Roadway Engineering
Feasibility Study (TRFEFS),
Wildlife Management Plan
(WLMP)
Complete end FY 2018
Goal #3. Ensure the health, safety and welfare of the public.
8. Support the needs of PW
Divisions delivery of
programs for health and
safety for our employees
Insure adherence of the
County wide safety program.
Actively participate on the
County wide safety committee
No adverse activities
Active PW participation
9. Support the needs of PW
Divisions delivery of
programs for health and
safety for the public
Insure compliance of all
regulatory agency
requirements, State and
Federal.
Insure compliance of all
County Ordinances.
No adverse activities
All regulatory needs met by
CoK
10. Anini Bridge #2 – annual
inspections reveal more
deterioration, move towards
a temporary fix now.
Complete the installation of a
temporary bridge that will
span the existing bridge to
provide more time to work
through a permanent solution.
Completed construction by
Spring 2018
11. Roads IWR 2018 funded. Bids complete March 2018 get
to contract.
IWR begin by summer 2018.
FY 2019 PW Budget Presentation Page 6
Comparative Graphs Public Works Administration
FY 2019 PW Budget Presentation Page 7
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 622,408 803,345 180,937 29.1%
Benefits 338,827 366,029 27,202 8.0%
Utilities 1,200 1,200 0 0.0%
Vehicle/Equip, Lease 0 0 0 0.0%
Operations 110,294 100,051 -10,243 -9.3%
1,072,729 1,270,625 197,896 18.4%
V. Operating Budget Discussion
The Public Works Administration budget increase overall in Salary and Wages is moving funding
previously in the Mayor’s office to fund the County’s CIP manager, Admin assistant, and finally half
year salary for County Engineer. Over all the goal was to remain flat and we have.
The total Public Works FY 2019 budget is approximately $60 million increase over last year’s 2018
budget of $53 million. The most significant you will see is the increase in the Roads Division IWR
budget of $8.6 million which includes one million of IWR and $7.6 million of a half year of GET
funds.
FY 2019 PW Budget Presentation Page 8
BUILDING DIVISION
Douglas Haigh, P.E., Chief
I. Mission
The mission of the Division of Building is responsible code enforcement and facility
development. All programs are responsible for providing the people of Kaua`i with safely
constructed public and private facilities.
II. Successes and Achievements
Building Permit System – transitioned to 100% electronic plan review.
Completion of the Lydgate Park-Kapa‘a Bike/Pedestrian Path Kawaihau Elevated
Boardwalk using FHWA funding and Department of Defense Innovative Readiness Training
Grant for the labor and equipment.
Issued the Notice to Proceed to the Design-Build Contractor and secured an additional $1.26
million for the Līhu‘e Town Core Mobility and Revitalization project
III. Challenges
Filling vacant positions in a timely fashion due to lack of qualified applicants.
Managing multiple projects with minimal staff
Managing FHWA funded projects approvals through State Historic Preservation Division.
Getting County Council to support adoption of new Building, Electrical, and Plumbing
Codes.
IV. Goals & Objectives
Ensure that the minimum construction standards contained within the Kaua`i County Codes,
and referenced building trade codes, are adhered to.
Continually update the Kaua`i County Code to meet current building industry codes, which
reflect the latest industry standards, and changing technologies.
Provide effective training and adequate staffing to increase the efficiency of services to the
public in the review, issuance, and enforcement of building, electrical, plumbing, and sign
permits.
Improve implementation of electronic building permit applications.
Ongoing development of the Ke Ala Hele Makalae bike & pedestrian path. Priority is the
Lydgate-Kapa‘a Bike & Pedestrian Path Phases C & D.
V. Operating Budget Discussion
Increase in Operations is due to:
Building Division. Salaries increased due to collective barganing.
FY 2019 PW Budget Presentation Page 9
Comparative Graphs Building Division Inspection
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 1,229,119 1,266,964 37,845 3.1%
Benefits 689,608 709,376 19,768 2.9%
Utilities 1,310,000 1,316,501 6,501 0.5%
Vehicle/Equip, Lease 0 0 0 0.0%
Operations 53,270 54,984 1,714 3.2%
3,281,997 3,347,825 65,828 2.0%
FY 2019 PW Budget Presentation Page 10
I. Operating Budget Discussion
The budget for Building Division is primarily salary and wages and benefits of which increased
3% over the prrevious year. Even with this increase the budget remains flat throughout.
FY 2019 PW Budget Presentation Page 11
AUTOMOTIVE DIVISION
Dwayne Adachi, Superintendent
I. Mission
The mission of the Automotive Division is to manage and maintain the equipment and vehicle
fleet of the Department of Public Works as well as other County of Kaua‘i agencies, enabling
the County to provide core services to all districts and communities.
II. Successes and Achievements
The Automotive Division has been moderately successful in meeting the demands and
requests of the various departments, agencies and the community in regards to equipment
supply and vehicle and equipment maintenance and repairs due to inadequate facility
conditions and staffing issues.
Procurement of new vehicles and equipment to modernize the fleet are helpful in keeping
the County operating efficiently.
New Vehicles and Equipment received in FY2018 include:
(1) 250 KW Generator - Wastewater
(1) 210GLC Excavator – Solid Waste
(1) Rear Loading Refuse Trailer – Solid Waste
(1) 621G Loader – Solid Waste
(2) Side Loading Refuse Trucks – Solid Waste
(4) 6110M Side Arm Mowers – Roads
(4) Tractor Rotary Mowers – Roads
(1) Clipper Mower – Roads
Design of a 1,500 sq. ft. second floor storage mezzanine is being completed by Building
Division. Construction of this additional storage area will allow us to utilize overhead space
and create more useable square footage at ground level for vehicle and equipment repair.
Roof leak repairs totaled 150,000.00 this FY.
III. Challenges
Meeting the demands and requests of the many different divisions, departments and agencies
we service on a daily basis as equipment and fleet ages and deteriorates.
Timely hiring of personnel to fill vacant positions has been a continuous challenge.
Operating productively within our limited space is a daily battle. The County’s vehicle and
equipment inventory has increased by 30% over the last 30+ years and continues to grow
while our resources remain constant.
FY 2019 PW Budget Presentation Page 12
IV. Goals
Provide vehicle and equipment maintenance and support for all departments and agencies,
allowing County employees to perform their duties effectively.
Modernize the County’s vehicle and equipment fleet, providing all agencies with reliable
and efficient units.
Offer support and disaster relief services to all agencies and the community in emergency
situations.
V. Objectives
Objectives Success Measurements Estimated
outcome
Analysis of manpower needs, and
addressing the need for transitioning
from retiring employees to new hires.
Create a method of succession
planning for anticipated
vacancies on going due to lack
of qualified applicants.
A smoother
transition
replacing
vacancies.
Analysis of workplace facility capacity. Determine optimum space needs
of the present fleet maintenance
requirements, will require
consultant to perform needs
assessment.
Efficient
utilization of
resources.
Facility maintenance and improvements
to address immediate term spatial needs.
Determine if the division of
space between equipment and
vehicles is adequate.
Efficient
utilization of
resources.
Repair and maintenance service interval
on time completion percentage
(currently 80%)
Improved maintenance interval
completion percentage.
Improved service
to our customers.
Average vehicle and equipment repair
turnaround time (currently four days)
Improved vehicle and equipment
repair turnaround time.
Improved service
to our customers.
Industrial accident rates (currently
averaging one per year)
Reduction of industrial accident
rates with improved training
opportunities from HR.
Reduction to zero
accidents.
FY 2019 PW Budget Presentation Page 13
Comparative Graphs Automotive Division
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 1,197,993 1,243,194 45,201 3.8%
Benefits 699,545 689,771 -9,774 -1.4%
Utilities 36,150 36,150 0 0.0%
Vehicle/Equip, Lease 92,722 37,121 -55,601 -60.0%
Operations 1,370,265 1,369,931 -334 0.0%
3,396,675 3,376,167 -20,508 -0.6%
FY 2019 PW Budget Presentation Page 14
VI. Operating Budget Discussion
Overall the entire Automotive Shop budget remains flat with a slight decrease due to
vehicle/equipment lesae debt service retirement.
.
FY 2019 PW Budget Presentation Page 15
ENGINEERING DIVISION
Michael Moule, PE, Chief of Engineering
I. Mission
The mission of the Engineering Division is the protection of the public’s health, safety, and
property, as well as the environment, through proper planning, design, development, operation,
and maintenance of the County’s infrastructure, and through administration of the sediment and
erosion control, storm water runoff system, driveway approach, land use, and complete streets
codes, resolutions, and ordinances.
II. Successes and Achievements
Worked with the Mayor’s Office, Public Works Administration, Department of Finance,
Planning Department, and The Transportation Agency to successfully pass an Ordinance
through County Council to create a ½ cent General Excise Tax Surcharge to fund
transportation needs, including road and bridge repairs and construction.
Maintained an average review time for subdivision plans, grading plans, and other
construction plans of 30 to 35 days.
Grading permits:
o Reviewed, processed, and issued: 22 permits;
o Currently open and active: 67 permits
o Inspected and closed out: 25 permits
Road permits:
o Currently open and active: 89 permits
o Inspected and closed out: 3 permits
Driveway permits:
o Reviewed, processed, and issued: 46 permits
o Inspected and closed out: 39 permits.
Substantially completed the following construction projects:
o ‘Anini Bridge #2 Repair
o Islandwide Bus Stops Phase 3
o Kapahi Bridge Replacement
o Po‘ipū/Kīpuka Crosswalk, flashing beacons, and curb ramps.
o Puhi Road Rehabilitation Phase 1
Started construction (or about to start construction) on the following projects:
o Mahea Road Sidewalk Project.
o Pua Nani Street Drainage Repairs
o Pu‘u‘ōpae Bridge replacement
o Safe Routes to School Crosswalk and Sidewalk Improvements at Kekaha Elementary
School, Kalaheo Elementary School, and Kapa‘a Middle School.
Completed in-house design for the following projects:
o Islandwide Roadway Resurfacing for 2019
o Mahea Road sidewalk project
o Pua Nani Street Drainage Repairs (completed procurement documents, not design)
Currently conducting in-house design of following projects:
o Islandwide Roadway Resurfacing for 2019 (additional streets),
o Kilauea Safe Routes to School Action Plan and Conceptual Design (design charrette)
FY 2019 PW Budget Presentation Page 16
o Moi Road Sidewalk
o Princeville Substation Fuel Tank
Currently managing consultant design for the following projects:
o Aliomanu Road Stabilization
o Hanapēpē Road Resurfacing.
o Islandwide Bus Stops Phase 4
o Kanaele Road repair and stabilization
o Kawaihau Complete Streets project
o Kīlauea Road resurfacing and Pedestrian/Bicycle access to Kīlauea Point (Managed by
FHWA Central Federal Lands, but Engineering Division is reviewing the design).
o Līhu‘e Town Core Mobility and Revitalization Project (TIGER Grant) (co-managing
this project with other departments and Divisions)
o Maluhia and Kōloa Road Improvements (Resurfacing, shoulder widening, etc.)
o ‘Ōpaeka‘a Bridge replacement
o Po‘ipū Road Multimodal project
o Puhi Road Rehabilitation, Phase II
o Safe Routes to School for King Kaumuali‘i Elementary School and Kōloa Elementary
School.
o Salt Pond Sewer Line
o Twin Reservoirs Decommissioning
III. Challenges:
Staffing:
o Engineering Division continues to struggle to fill vacant positions. Two Engineering
Division personnel retired during the past year, and one staff member left the County to
return to the mainland. We currently have three vacant positions.
o Vacancies have resulted in delay on some projects. With the General Excise Tax
Surcharge, it will be increasingly important to be fully staffed in order to complete
additional projects. We are currently going through interviews and recruitment that
should result in filling two of the three vacancies within two months. The third vacancy
will likely be filled by the end of Fiscal Year 2018 or soon thereafter.
IV. Goals & Objectives
Continue to improve in-house design capabilities
o Two staff members are actively learning AutoCAD Civil 3D and using it to design
projects that include topographic survey and three dimensional design.
o Examples of our recent success include the Mahea Road Sidewalk Project and our
current work on the Moi Road sidewalk project.
Implement Complete Streets
o The County’s new street design manual has been completed. The final step is to go
through rulemaking; this process is anticipated to start in April 2018.
o We are incorporating Complete Streets principles in our major projects, sometimes with
negligible additional cost, for example we have changed striping plans to provide paved
shoulders that allow motorists to overtake bicyclists without delay. Our goal is to ensure
that all future major projects have both system preservation and transportation
FY 2019 PW Budget Presentation Page 17
improvement (safety, complete streets, congestion management, and economic
development) purposes.
Review permit fees and propose fee adjustments if deemed appropriate
o No action this year, due to workload and staffing shortages.
Comparative Graphs Engineering Division
FY 2019 PW Budget Presentation Page 18
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 1,097,054 1,124,995 27,941 2.5%
Benefits 630,120 521,942 -108,178 -17.2%
Utilities 0 0 0 0.0%
Vehicle/Equip, Lease 0 0 0 0.0%
Operations 84,171 79,971 -4,200 -5.0%
1,811,345 1,726,908 -84,437 -4.7%
V. Operating Budget Discussion
Engineering Divisions Salary, Wages, and Benefits remain flat with no salary increases but
increase in benefits however off set by hiring new employees at a lower base rate than those
who retired.
FY 2019 PW Budget Presentation Page 19
HIGHWAYS & ROAD CONSTRUCTION DIVISION
Edmond P.K. Renaud, Chief
I. Mission
The mission of the Roads Division is to maintain County roadways in a manner that will safely
convey vehicular and pedestrian traffic, and to maintain drainage facilities and provide County-
wide support with equipment and labor.
II. Program Description
The Roads Maintenance Division performs roadway pavement, shoulder, bridge,
sidewalk/driveway/curb/gutter, levee and appurtenances maintenance and repairs; installation
and maintenance of traffic and safety devices; installation, maintenance and repair of signs and
road markings. The Roads Maintenance Division supports the Department of Parks and
Recreation and the Solid Waste Division on a regular basis and supports other agencies on an
as-needed basis. The Division also plays a key role in disaster response.
III. Successes and Achievements
Four Winds Group MPET (Management Productivity Enhancement Tool) & MMIS
(Maintenance Management Information System) Programs to assist Field Operations.
Field Operations has come to life with Field Supervisors understanding the value of the tool
in assisting with their work in every phase.
Ongoing improvements in the recording and tracking of public complaints have improved
response and accountability.
Ongoing training to improve Baseyard maintenance planning, scheduling, reporting and
supervisory management of roads projects and assignments.
Ongoing documentation of Road Division Management Procedures and Standard Operating
Procedures (SOPs).
iWorQ’s (Roads Pavement Maintenance Management Program).
Successfully implementing Island Wide Road Resurfacing preventative maintenance, crack
fill and surface seal coating.
Improvement in Roads Pavement Management Program reporting capability and planning
with GIS (Geographic Information System) pavement mapping.
Three Baseyards moving and completing each district’s concerns projects of pothole repairs,
drain line clearing, hazard tree trimming, and roads vegetation control clearing.
Special Construction Section (Traffic Sign & Markings, Roads Bridge Maintenance &
Construction, and Equipment Logistics Crews) is progressing to be a great TEAM, moving
and completing everything that is assigned.
Conducted a detailed physical inventor y assessment and evaluation of the present Island
Wide Road A.C. resurfacing and crack fill & surface seal coating budget needs to insure
road condition maintenance needs are objectively met. Council supported the need for more
funds for road pavement maintenance by increasing the G.E.T. to help catch up the road
maintenance back log. Roads is presently conducting road reconnaissance and evaluating
how Roads can accelerate the Comprehensive Road Maintenance List to put the $8 million
to most effective use.
FY 2019 PW Budget Presentation Page 20
Ongoing replacement of County road signs to meet new mandated traffic sign reflectivity
requirements.
Ongoing implementation of pavement maintenance management program. The software is a
tool to assist the program manager to determine optimum use of highway funds.
Ongoing use of iWorQ’s Systems data consisting of
o What roads/streets County owned
o Condition of the roads/streets pavement
o Traffic signs, object markers, delineators
o Traffic pavement markings
o County guardrails
o County bridges, culverts, drainage systems on the County-Right-of-Ways
o Utilities on the County Right-of Ways
The survey was conducted intersection to intersection or at points established by GIS
mapping of centerline. iWorQ’s was also the consultant that determined road signs needing
replacement to meet Federal retro-reflectivity requirements. Initial iWorQ survey was in
2012 and a resurvey of road pavement condition was conducted in 2016. Surveys planned
for every 4 years; the next survey is scheduled for 2020 with ongoing road pavement
condition monitoring conducted by Roads Division.
Vehicle/equipment safety and training is ongoing.
Island Wide Road Resurfacing (IWRR) Projects.
Island Wide Crack Filling and Seal Coating 2017-2018 has been completed.
Island Wide Crack Filling and Seal Coating 2018-2019 bids were open on March 8, 2018.
Island Wide Road Resurfacing AC 2017-2018 Local Roads has been completed.
Island Wide Road Resurfacing 2018-2019 is out to bid and opens March 29, 2018.
2016-2017 Miles Square Yards $ Cost
AC 4.15 62,520 $2,078,970.00
CFSC 2.35 30,366 $ 406,114.50
2017-2018 Miles Square Yards $ Cost
AC 3.76 35,272 $4,264,879.00
CFSC 9.71 113,900 $2,417,407.00
IV. Challenges
Meet the challenge to move IWR through procurement and contract within the current FY.
The Roads Division fields daily complaints and requests for maintenance of Roads in
Limbo, Private Roads and Paper Roads. The public is often frustrated when they learn that
the County does not own the road and therefore will not maintain it.
Meeting new mandated traffic sign reflectivity requirements.
Increasing public expectations.
V. FY19 Goals & Objectives
Goal 1.0 To keep County roads and bridges safe for public use
Objective 1.1 Employ varied and targeted pavement repair treatment methods to reduce
overall roadway life cycle costs.
FY 2019 PW Budget Presentation Page 21
I. Reconstruction: Removal of Failed Area (Full or Partial Depth)
II. Rehabilitation: Asphalt Cement Overlay
III.Preventative: Patching, Crack Fill and Surface Seal Coating
Goal 2.0 To anticipate and address road, bridge and drainage needs
Objective 2.1 Work with County Information Technology to use GIS mapping to identify
problem areas and pinpoint public safety concerns. GIS will be an integral part of
Pavement Maintenance Management Program and of the Management Productivity
Enhancement Tool / Maintenance Management Information System.
Objective 2.2 Work with the County Planning Department, County Attorney and
legislative bodies to address roads in limbo and paper roads.
Goal 3.0 To make the best and most efficient use of the Division’s resources
Objective 3.1 Reorganize personnel and equipment assignment to make operations more
efficient.
Goal 4.0 To improve internal and public communication
Objective 4.1 Provide ongoing supervisory training in planning, scheduling, report-
writing, cost analysis, purchasing system, morale-motivation training, and accountability.
Goal 5.0 To instill pride in the jobs that we perform
Objective 5.1 Create objective quality measures for work performance
Comparative Graphs Highways Division
FY 2019 PW Budget Presentation Page 22
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 4,037,941 4,456,101 418,160 10.4%
Benefits 2,336,278 2,349,134 12,856 0.6%
Utilities 545,780 545,780 0 0.0%
Vehicle/Equip, Lease 775,014 767,438 -7,576 -1.0%
Operations 6,856,692 11,436,395 4,579,703 66.8%
14,551,705 19,554,848 5,003,143 34.4%
VI. Operating Budget Discussion
The increase in Salary, Wages and Benefits is directly related to the increases of collective
bargaining across the board. In addition a new crew of 3 is proposed to be formed to support
Transportation Bus Stop maintenance for the County’s over 150 bus stops improved and to be
improved.
Equipment leases matching last year’s represents another investment of new equipment to
continue the replacement of our aging equipment fleet. The investment of last year and this year
should greatly improve equipment availability to service our community.
FY 2019 PW Budget Presentation Page 23
The Operations budget increases reflect a commitment by the Administration towards Island
Wide Resurfacing funding above the $1.2 million with an increase to $8.6 million to complete a
blend of Pavement Preservation techniques, ranging from preventive to major preservation,
rehabilitation and reconstruction of our local roads. In addition using 20% matching funds to
complete work on our Federal Aid Collector roads to leverage 80% for a goal of another $7.8
million.
FY 2019 PW Budget Presentation Page 24
WASTEWATER MANAGEMENT
Jason Kagimoto, P.E., Chief
I. Mission Statement
The mission of the Division of Wastewater Management is to protect the public’s health, safety,
and the environment by developing and operating the County’s wastewater infrastructure.
II. Successes and Achievements
Working towards addressing the odor issues in the Wailua/Coco Palms area.
o Installed two manhole odor control units and based on their initial performance, which
included discussions with some of the neighboring commercial properties, the Division
will install an additional four units to provide better coverage in the area.
o The Division contracted a design consultant to evaluate how the odors can be minimized
or prevented from being created within the Arzadon sewer force main.
August 2017 and February 2018 Operator License examinations had high pass rate at all
license levels, including another Grade IV operator.
Meeting National Pollutant Discharge Elimination System (NPDES) permit-required
compliance schedule for Wailua WWTP to abandon the ocean outfall.
Successfully performed a pilot test to add an influent filter at the Wailua Wastewater
Treatment Plant (WWTP).
Continuing discussions to better utilize the anaerobic digesters at the Līhu‘e WWTP,
particularly involving the possible capturing and use of the digester gas and reusing the
biosolids instead of disposing at the Kekaha Landfill.
Supporting Parks and Recreation in maintaining all septic systems south of Hanalei Bridge.
Supporting Solid Waste Division in maintaining all facilities.
Contracted with consultant for design of Līhu‘e WWTP Process Improvements Ph I to
provide treatment capacity to accommodate future development.
Bid out the Improvements to Existing Hanamā‘ulu and Kapaia Wastewater Pump Stations
project, which will provide upgraded facilities with increased capacity to accommodate
future development.
III. Challenges
Aging infrastructure
Admin staffing to keep up with the regulatory, planning and project needs
Increasing Regulatory Compliance complexity, particularly with the NPDES permit for
Wailua WWTP
Developing and maintaining required specialty skills and licensing for our Wastewater
Operators
Limited funding and small customer base
Anticipation of growth within wastewater service areas, and preparations to ensure capacity
and capability to maintain service levels for new residential development.
IV. FY18 Goals & Objectives
Continued regulatory compliance.
FY 2019 PW Budget Presentation Page 25
Seek funding opportunities, including grants and low cost loans to support capital
improvement project (CIP) needs.
Continually improve operations by safety and efficiency improvements, facility
maintenance, and CIP.
Finalize designs for improvements at Līhu‘e and Wailua WWTPs for continued facility
improvements needed to maintain existing facility functionality and prepare for service area
residential growth.
Consistently produce R-1 recycled water at the Waimea WWTP and distribute R-1 recycled
water for reuse.
Continually improve operation and maintenance practices and procedures, adopting a more
rigorous asset management program incorporating maintenance management software
information, standard life expectancy for assets, scheduled equipment maintenance and
replacement, adequate maintenance and repair equipment and supplies, and skilled
maintenance personnel.
Financial sustainability via sewer user fees that cover the cost of providing sewer service -
Rate Study in progress.
Operator training, including the University of Hawai‘i Wastewater Operator Training
Program and Hawai‘i Rural Water Association’s training classes.
Improve biosolids handling to develop beneficial alternative for biosolids management to
reduce costs and save landfill space. (long term goal)
Objectives Success Measurements Outcomes
Seek funding opportunities for
grants and low cost loans to
support CIP needs.
SRF funded projects
Grant funded projects
SRF funding continues to be
preferred CIP funding source.
Improve operations and
facilities
Execute CIP projects Upgrades to the facilities are
needed and this is most efficiently
performed through CIP projects.
Finalize designs for Līhu‘e and
Wailua WWTP improvements
Meet contract schedules Both projects are on schedule and
the improvements will help to
provide treatment capacity and
stability.
Consistently produce R-1
recycled water at the Waimea
WWTP and distribute for reuse
Consistently meeting
turbidity requirement for
R-1 recycled water
Hired consultant to evaluate the
treatment process and identify a
recommendation(s)
Continual progress on
operation and maintenance
practices and procedures.
Compilation of system
O&M information for
documentation and
understanding of O&M
needs and practices
Increasing use and capabilities of
the Division’s asset management
program.
Financial Sustainability Rates and charges for
system users that cover
operation, maintenance
and replacement costs
Rate study in progress, anticipate
new rate schedule to be proposed
for adoption during calendar year
2018.
Staff development and CEUs for license CEUs are current, license renewals
FY 2019 PW Budget Presentation Page 26
Training – Provide staff
training opportunities for
career advancement and to
achieve CEUs for maintaining
licenses.
renewals achieved?
Staff progressing to
higher level licenses?
achieved.
Current vacancies for Grade IV
operators are problematic. 100%
pass rate at February 2018 exam,
including 1 Grade IV Operator.
Improve biosolids handling to
develop beneficial alternative
for biosolids management to
reduce costs and save landfill
space.
Tons/year biosolids
diverted from landfill.
Working on biosolids reuse to
divert biosolids from the landfill.
Comparative Graphs Wastewater Division
FY 2019 PW Budget Presentation Page 27
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 2,468,926 2,556,998 88,072 3.6%
Benefits 1,430,499 1,356,099 -74,400 -5.2%
Utilities 1,768,000 1,768,000 0 0.0%
Vehicle/Equip, Lease 118,240 17,469 -100,771 -85.2%
Operations 4,403,896 4,545,796 141,900 3.2%
10,189,561 10,244,362 54,801 0.5%
V. Operating Budget Discussion
Salaries and wages as a category are increasing due to bargaining unit increases.
Utilities recognize the current low energy rates and are budgeted for anticipated stable
performance.
Overall operations expense remained flat with only minimal increase over last year.
FY 2019 PW Budget Presentation Page 28
SOLID WASTE DIVISION
I. Mission
The mission of the Solid Waste Division (SWD) is to maintain public health and safety by
providing reliable programs to properly manage municipal solid waste (MSW) for the island of
Kaua‘i, and to maximize waste diversion on Kaua‘i by providing cost-effective, convenient, and
reliable waste diversion opportunities to Kaua‘i residents through source reduction, reuse, and
recycling.
II. Vision
Maintain a balance of reliability, efficiency, and cost effectiveness for County solid waste
management programs.
Identify and implement appropriate integrated programs to divert solid waste from the
County landfill.
Further maximize waste diversion by promoting all existing waste diversion opportunities to
the residential and commercial sectors as appropriate. Provide technical assistance to the
commercial sector and private recyclers. Provide public education in schools and to the
community at large.
Conduct County solid waste management programs and operations in accordance with
applicable government regulations.
III. FY 2018 Successes and Achievements
Renewed Permits for the Transfer Stations. The Solid Waste Management Permits for all
four refuse transfer station(s) (RTS) were updated and approved by the Department of
Health (DOH) in December 2017. The permits are valid for 5 years. The renewal was
completed in house by the SWD.
Refuse Transfer Station Improvements. Clean Water State Revolving Fund monies have
been secured to fund the design and construction of RTS improvements at Hanalei,
Hanapēpē, Kapa‘a and Līhu‘e. SWD executed the design contract in February 2018 and is
moving forward with the design to assure improved operations and conditions at the RTSs.
Cell #2 Lateral Expansion. Clean Water State Revolving Fund monies have been secured
to fund the design and construction of the lateral expansion at the Kekaha Landfill. The
SWD has executed the design contract and is moving with the final design and completing
the permit to do the construction.
Recycling Opportunities and Education. The County Recycling Office continues to
manage a variety of recycling opportunities available to residents, visitors, and businesses.
Programs are promoted through the County website, recycling guides, print media, and radio
ads. We provide educational presentations for schools and community groups upon request.
For a comprehensive list and explanation of programs, see www.kauai.gov/recycling.
FY 2019 PW Budget Presentation Page 29
Electronic (eWaste) Recycling. Continue to contract six days per week eWaste recycling
program through Resource Recovery Solutions, LLC at the Puhi Metals Recycling Center.
In February 2018, the State DOH announced that they will grant funds to the Counties in FY
2018 and FY 2019 to expand and promote eWaste programs. The FY 18 grant is in the
process of being executed. Funding will be used to coordinating mobile collection events on
the north shore and west side, and to purchase radio and news ads in an effort to maximize
eWaste diversion.
Home Composting. The home composting program continues to be the most economical
program, diverting organic waste at a cost of approximately $5.65 per ton. Bins are
distributed at a rate of about 30 bins per month. The program includes an education
component with a short video and live demo at the time of distribution to emphasize
different aspects of bin setup and use to ensure residents are able to utilize the composting
bin efficiently. We are also continuing our cooperation with several schools on the island to
promote composting on campus.
IV. FY 2018 Challenges:
Notice of Violation and Order (NOVO). The County has continued to work with the
Clean Water Branch (CWB) and the Solid and Hazardous Waste Branch from the DOH to
address the NOVO. SWD has implemented various BMPs at all the refuse transfer stations
and continue to make improvements. Procedures for weekly BMP site inspections have
been initiated and ongoing for over a year. The design contract for transfer station
improvements has been executed and the SWD is moving forward with the design. These
improvements will address NOVO items and get all locations to meet DOH CWB
compliance requirements.
Unscheduled Closures for Green Waste Diversion operations. Unscheduled closure of
green waste diversion sites continue to be a challenge, especially at the Hanalei RTS.
Weather and site limitations at the Hanalei RTS pose significant challenges for operations to
maintain a safe drop off area for residents while ensuring timely loading and transport of
green waste so permitted site capacity is not exceeded. It is anticipated that unscheduled
closures will persist while work to develop permanent improvements is being completed.
Design is underway for a top load drop off area for greenwaste.
Equipment. Due to the nature of seven day a week operations there has been numerous
occasions with equipment being down for repairs and operations/service being affected.
Most notable is the automated refuse trucks that service the islands residential refuse
collection. These trucks run hard weekly and have frequently been in the Auto Shop for
repairs. We recently received and will be operating two new automated trucks that were
ordered with FY 17 budget funds to replace two of our older trucks. We have a request in for
FY 19 budget consideration to replace three automated trucks. In addition, we are working
closely with Auto Shop to emphasize that routine maintenance items are addressed
consistently avoiding the more severe issues.
Also worth noting as a challenge are the aging compactors at Hanapēpē, Kapa‘a, and
Hanalei RTSs. These compactors have gone down during the past year affecting transfer
FY 2019 PW Budget Presentation Page 30
station operations. Future RTS improvements and working closely with Auto Shop will
help address this issue. We received and started operating a new 85 cubic yard transfer
trailer that was ordered with FY 17 budget funds at our Hanalei RTS. Planning ahead for
future upgrades, we have also requested two replacement Tractor trucks and two new top
load aluminum trailers for Hanalei RTS in our FY19 budget.
Landfill Siting. The County continues to work on securing the commitment of the
landowner and will continue to work to mitigate vehicle traffic related issues and wildlife
hazard mitigation planning relative to Līhu‘e Airport in conjunction with the completion of
remaining tasks in the environmental impact statement process for the proposed landfill at
the Ma’alo Site.
V. FY 2019 Goals and Objectives:
Goals/Objectives Comp. by Outcomes
Provide public education in schools and to the community at
large
Ongoing Increased awareness
and recycling program
participation
Utilize State DOH Grant funding to expand and promote the
eWaste recycling program
Ongoing Increased program
participation
Complete Construction of the Cell #2 Lateral Expansion at
the Kekaha Landfill
Anticipated Cell
A and B
January 2020
Increase capacity of
the Landfill
Complete Construction of Improvements to Refuse Transfer
Station Operational Components
Anticipated
July 2020
Improve stormwater
and non-stormwater
discharge while
reducing or
eliminating
unscheduled closures
Complete EIS for proposed new landfill Anticipated
April 2018
Satisfy Statutory
disclosure requirement
to allow
commencement of
processes to secure
land entitlements
VI. Performance Measures
a. Waste Diversion Rate. The Waste Diversion Rate is the ratio of all waste
diversion/recycling tonnage and the total generation tonnage (diversion/recycling tonnage +
disposal). The waste diversion rate is an indicator of how effective existing
diversion/recycling programs are at reducing the waste stream going into the landfill.
b. Program Reliability
i. Refuse Collection Service. Refuse collection is one of the most widely used
service provided by the Solid Waste Division, with a total exceeding 19,800
FY 2019 PW Budget Presentation Page 31
customers per week. Routes not collected at least by the day after originally
scheduled will be monitored and causes will be identified and evaluated.
ii. Mixed Waste Disposal at Refuse Transfer Stations. Refuse Transfer Station
(RTS) operate approximately 352 days out of the year, providing small
businesses and residents with an option to properly dispose of solid waste.
Unscheduled closures will be monitored and causes will be identified and
evaluated.
iii. Waste Diversion Programs at Refuse Transfer Stations. Segregated Greenwaste,
Scrap Metal & White Goods, Used Motor Oil, Scrap Tires are accepted at all
RTSs and the Landfill for residents. Small businesses may also divert greenwaste
at these locations which operate approximately 352 days out of the year. Program
participation is heavily dependent on reliability of the service. Unscheduled
closures will be monitored and causes will be identified and evaluated.
iv. Certified Redemption Centers. There are six Certified Redemption Centers
throughout Kaua‘i accepting plastic, glass, aluminum and bi-metal beverage
containers marked with the HI5 symbol. These locations operate various days
and hours indicated on the County’s website at: www.kauai.gov/hi5. Businesses
and residents rely on these sites in order to redeem their deposits paid under this
State program. Unscheduled closures of the redemption centers are tracked and
reported to the State Department of Health and causes are identified and
evaluated.
v. Residential Drop-Off Program for Recyclables. The residential drop box program
has 8 sites from Hanalei RTS to the Kekaha Landfill, where recyclables (tin cans,
glass, corrugated cardboard, newspaper, mixed paper, plastic bottles & food
trays, and aluminum cans) are received. Available bin space has a direct
correlation to the likelihood that participants will recycle regularly. Occasions
where full bins are reported will be monitored and causes will be identified and
evaluated.
c. Safety. The SWD operation is becoming more mechanized where advancements in
technology can be utilized to minimize employee exposure to health and safety risks
associated with manual labor. An example of this is the County’s implementation of
automated refuse collection and modified manual collection. Where manual labor is
necessary, training and personal protective equipment will be employed to minimize
risks of injury to employees. The SWD reviews and updates standard policy and
procedures as warranted to ensure risks to employees, customers and the environment
are minimized.
VII. Vacant Position Listing
Current Vacant positions:
-EO-III Lihue RTS
-EO-III Hanapepe RTS
-Scale Attendant Clerk
-LF Working Supervisor (Currently recruiting)
Anticipated Openings:
-SW Working Supervisor
FY 2019 PW Budget Presentation Page 32
VIII. Itemized Listing of Grant Funds
Deposit Beverage Container Contract with State Department of Health Solid and
Hazardous Waste Branch, ASO Log 14-047 Mod. 5
Expense Item Budget
Salaries and benefits for 2 full time Recycling Specialists $161,971.81
Leases, rentals, utilities $14,000.00
Mileage for inspections, travel contingency $3,640.00
Contract for CRC operations, office supplies $75,250.00
Total $254,861.81
FY 2018 grant funds shown above. FY 2019 budget for Deposit Beverage Container Contract
expected to be similar.
Electronic Waste Contract with State Department of Health Solid and Hazardous Waste
Branch, Ref. No. 18-OSWM-EW-Kaua‘i
FY 2018 grant in process of being executed in the amount of $45,000
FY 2019 grant is anticipated to be $165,000
Comparative Graphs Solid Waste Division
FY 2019 PW Budget Presentation Page 33
FY 2018 FY 2019 $ + / - % + / -
Salary and Wages 4,212,314 4,434,364 222,050 5.3%
Benefits 2,494,834 2,501,204 6,370 0.3%
Utilities 38,595 37,021 -1,574 -4.1%
Vehicle/Equip, Lease 1,414,845 1,889,185 474,340 33.5%
Operations 10,409,706 11,586,337 1,176,631 11.3%
18,570,294 20,448,111 1,877,817 10.1%
XI. Operating Budget Discussion
Salaries, Wages remained flat or slightly lower and Benefits increased for a gain.
Operations cost remained flat resulted in a no change budget for second year in a row.
The investment continues at the same rate slightly higher than last year to replace aging
equipment to meet the daily demands of the fleet is greatly appreciated and will go a long way
towards effective service to our community.