Loading...
HomeMy WebLinkAbout15A2118 FACILITIES IMPROVEMENT MANAGER 20181114DEPARTMENT OF HUMAN RESOURCES COUNTY OF KAUA' I FACILITIES IMPROVEMENT MANAGER 15A2118 EM -05 Duties Summary: Plans, directs, and coordinates the management and improvement of County's facilities and equipment, identifying facility assets, and providing a schedule for replacement and options for financing the plan; and performs other related duties as required. Distinguishing Characteristics: This class is distinguished by its responsibility for the overall management and improvement of the public building construction and replacement activities for County facilities and equipment. This single position in this class exercises considerable independent judgment in managing of facility improvement and development and construction projects for the County. Examples of Duties: (The following are examples of duties and are not necessarily descriptive of any one position in this class The omission of specific duties statements does not preclude management from assigning such duties if such duties are a logical assignment for the position.) • Plans, directs, and coordinates the management and improvement of County's facilities and equipment, to include identifying the facilities assets; • Participates in determining long -range objectives for the department and directs the execution of approved projects relating to County facilities; • Prepares plans, specifications, and designs for minor capital improvement projects; • Participates in the review and approval of awards, inspections, and final payments of construction and service contracts; • Checks designs, plans and specifications of structures in relation to the maintenance requirements of such structures; • Investigates problems associated with various types of building construction and improvement; • Prepares bid documents and project management of CIP projects county -wide; Facilities Improvement 2 15A2118 Manager • Meets with architects and contractors, and advises them on the requirements of codes and their application; Conducts studies to relating to equipment, maintenance approach, operational alternatives and costs; • Develops and implements operating policies and procedures and long -range goals and objectives. Minimum Qualification Requirements for the Class: Training and Experience: A combination of education and experience substantially equivalent to graduation from an accredited college of university with a baccalaureate degree in engineering, architecture, business, public administration or a related field and six (6) years of professional experience analyzing and making recommendation for the solutions of problems of organization, procedures, program, budget, or personnel, including or supplemented by one (1) of supervisory of administrative responsibility for operations and facilities management. License Requirement: Possession of a valid motor vehicle operator's license. Knowledge of: principles and practices of administration; theories and practices of civil engineering and architecture; principles and practices of asset management; principles and practices of building construction and maintenance; legal requirements of building, plumbing, and electrical codes; methods and practices used in the preparation of specifications, estimates, and contracts; governmental budgeting and procurement procedures; report writing. AbilLto: formulate long -range objectives; make sound evaluations and recommendations; prepares plans, specifications and proposals; conduct feasibility, engineering and cost studies; prepare clear and concise reports; identify problems and develop alternative solutions; deal effectively with other governmental agencies and the public. Health and Physical Condition: Persons seeking appointment to positions in this class must meet the health and physical condition standards deemed necessary and proper for performance of the duties. Facilities Improvement 3 15A2118 Manager This is an amendment to the specification for the class FACILITIES IMPROVEMENT MANAGER approved on July 20, 2016, effective July 1, 2016 and is to be substituted for that specification. APPROVED: November 14. 2018 A41 On fA (Date) JANINE M.Z. RA ' P 0 Director of Hum Resou es