Loading...
HomeMy WebLinkAboutJuly17,2017ShorelineSetbackDeterminationApplicationsPLANNING DEPARTMENT SHORELINE SETBACK APPLICATION FOR OFFICIAL USE ONLY: SSD 201 Acceptance Date: —1 20 Website Posting Date: Determination Date: Planning Commission Date: fj `' ExpirationDate: To Planner Assigned: Instructions: File all information requested under Part A for process ng the Determ nation of Applicability (§8-27.1), including signature page. Fill out Parts A and B if you know, due to proximity of the shoreline, that your parcel will require a Certified Shoreline Survey. If you are proposing a permitted structure or subdivision within the shoreline setback area fill in Part C. For applications involving a variance, complete Part D. A licant Information Applicant: Hawaiian Preservation Trust Mailing Address: Applicant's Status: 3016b Pacific Malibu, CA (Check one Coast Highway #380 Phone: 90265 Email: ✓ Owner of the Lessee of the Authorized Agent Property Property (Holder of at least 75 % of the equitable and legal title) Lessee must have an unexpired and recorded lease of five (5) years or more from the date of filing of this application. If not, Owner(s) must provide a Letter of Authorization. Attach Letter of Authorization Transmittal Date: YrojeCt Information (attach (attach additional sheets, if necessary County Zoning District: pen Tax Map Key(s): nl S Land Area: S•• Nature of Development: Renovation of exisfg. buildings; 1. Renovate roof of main res; 2.Renov./ (Description of proposed raise Garage/Fitness Room. 3.Raise Workshop/Storage building; structure or subdivision) 4. Renovate ADU; 5. Provide a new fence/gate.(See Attach. Description) NO PERMITS WILL BE ISSUED WITHOUT PLANNING COMMISSION ACCEPTANCE, EXCEPT AS PROVIDED IN §8-27.8(c)(8) Part A Shoreline Setback Determination of Applicability (§8-27.1) Check all that apply, fill in applicable information. Any box checked must be accompanied by additional information, �hotos and/or documentation. ✓ Properties Abutting the Shoreline 100' - 155' Project's approximate distance from shoreline: erties Not Abutting the Shoreline Prop Project's approximate distance from shoreline: Additional information: 100 ❑ CIosest distance of improvement(s) from Shoreline is approximately 8. ❑ Number of parcels and type of improvements (roads, buildings, structures) between Shoreline and this parcel: -1- 3/OS/15 PLANNING DEPARTMENT SHORELINE SETBACK APPLICATION FOR OFFICIAL USE ONLY: SSD 201 Acceptance Date: Website Posting Date: Determination Date: Planning Commission Date: Expiration Date: Planner Assigned: [� Topography (undulating, flat, slope, etc.) and ground elevation of subject parcel (Lowest and Highest elevations) Shoreline type (e.g. beach, dune, rocky, sandy with rocky outcropping, etc.) pw w'apF4j4PK9 Artificially armored Shoreline \ BIf checked, what type of armoring (e.g. seawall, revetm0� a'�d ) ent, bulkhead): A90IS (l%U** *' Is the armoring permitted/authorized? Date of authorization (attach copy of authorization letter): Is property in coastal floodplain (if checked, what zone)? V M I lI1 Has this property been subject to coastal hazards in the past? (If checked,ease describe) — If the proposed structure or subdivision is within the shoreline setback area then, please be aware that if the determination of a structure is approved, plicant, its successors, and permitted assigns shall defend, indemnify, and hold the County of I{aua`i harmless from and against any and all loss, liability, claim or demand arising out of damages to said structures from any coastal natural hazards and coastal erosion, pursuant to §8-27.7(b)(2). The requirements of the Subsection (b) shall run with the land and shall be set forth in a unilateral agreement recorded by the applicant with the Bureau of Conveyances or the Land Court, whichever is applicable, no later than thirty (30) days after the date of final shoreline approval of the structure under §8-27.8. A copy of the recorded unilateral agreement shall be filed with the Director and the County Engineer no later than forty-five (45) days after the date of the final shoreline determination and approval of the structure an e filing of such with the Director shall be a prerequisite to the issuance of any related building peemifi" 8-2 .7(b)(6). _ Date be Setback De�mination�rlecessary. Requirements of Ordinance No. 979 are applicable. 5� 9 I / Date 2- 3/OS/15 PLANNING DEPARTMENT SHORELINE SETBACK DETERMINATION If Part A has been deemed that a Detexrnination will be necessary, the additional information will be required fox submission of this application. Part B Exemption Determination ❑ A non-refundable processing fee of one hundred dollars ($100.00) shall accompany a request for determination. (§8-27.8(e)) ❑ Exemption 1 In cases where the proposed structure or subdivision satisfies the following four criteria: (A) In cases where the proposed structure or subdivision is located outside of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) `V' or `VE' flood zones; (B) The proposed structure or subdivision is located at an elevation which is thirty (30) feet above sea level or greater; (C) The applicant can demonstrate to the satisfaction of the Planning Director that the property is clearly adjacent to a rocky shoreline and that it will not affect or be affected by coastal erosion or hazards; and - (D) The shoreline setback shall be sixty (60) feet from the certified shoreline which has been established not more than twelve (12) months from the date of the application for the exception under this section. ❑ Exemption 2 In cases where the applicant can demonstrate to the satisfaction of the Planning Director that the applicant's proposed structure or subdivision will not affect beach processes, impact public beach access, or be affected by or contribute to coastal erosion or hazards, excluding natural disasters. Factors to be considered shall include, but not be limited to, proximity to the shoreline, topography, properties between shoreline and applicant's property, elevation, and the history of coastal hazards in the area. Co Exemption 3 1*: Those structures and uses found exempt in Table 3 (§8-27.7) (see pg. 5-6) ❑ Exemption Letter from the Department of Public Works stating that the proposed project does not constitute "Substantial Improvement," pursuant to §8-27.2 Determination (to be completed by Planning Department) Pursu to�`§8-27 " e Kauai County Code, 1987 as amended, the Planning Deparhment hereby certifies the prop sed spruc r.e(s) qr subdivision(s) as exempt from those shoreline setback determination requirements eslnblishe 3- 3iosns AVERY YOUN, ARCHITECT 4=1579 KUHIO HIGHWAY STE. 211 KAPAA, HAWAII 96746 averyyoun@gmail.com PH. (808) 246 9414 June 19, 2017 Jody Galitano Kauai Planning Department RE: HAWAIIAN PRESERVATION TRUST SSD/SMA APPLICATION 3968A and 3952 Anini Road Anini, Kauai, Hawaii Dear Ms. Galitano, Attached are amendments to the above applications, to address the existing outdoor shower and wood stump fence located within the shoreline setback. The project descriptions have been amended as well as the site plans to indicate the locations of these items. The shower has been in existence prior to adoption of the Comprehensive Zoning Ordinance and the wood stump fence has been knocked down so it's no longer a barrier. Should any additional information be required, please contact me at 639 7999. Your assistance in processing this application will be greatly appreciated. ANINI BEACH PROJECT TMK: 5-3-05: 01, Units 1 & 2 PROJECT DESCRIPTION A. Location Description: At Anini Beach fronting the shoreline, approximatey 60 feet west of Anini Beach Park. The deed originally contained a total area of 52,203 sq. ft., however, based on an estimated shoreline of August, 2015, the revised parcel area is at 41,630 sq. ft. The property is located within the Flood Zone (VE Tsunami District) with a base flood elevation of 11 feet above MSL (Mean Sea Level). The average existing ground elevation approximates 10'above MSL. The shoreline frontage is approximately 204 feet along Anini's sandy shoreline, approximately half of which contains a rock rubble wall, inland from the beach and approximately 3 feet high. The shoreline vegetation consists of mature ironwood, kamani trees and naupaka, and offshore Anini reef protects this shoreline property from severe beach erosion. The property was CPR'd (Anini Hide -A -Way) into 2 units in 2011. There are four (4) existing structures on the property; B. Site Description: The subject property is located along Anini Beach Road approximately 60 feet west of the Anini Beach Park and fronts the shoreline to the north. The property was CPR'd (Anini Hide -a -way) into 2 units in 2011. 1. Buildings: There are four (4) existing structures on the property; Unit A includes a residence, a garage/fitness studio, and a workshop/storage building, while Unit B contains an Additional Dwelling Unit (ADU). Since the Main residence and the Garage/Fitness Room were constructed in 1959 prior to the adoption of the zoning ordinance and FEMA Regulations, both are non- conforming structures in that the finish floor elevation is at 10' MSL, or one(1) foot below the flood elevation of 11' MSL. The main building is setback approximately 100 feet from the shoreline; the garage/fitness room approximately 152 feet; the workshop/storage approximately 155 feet; and the ADU approximately 130 feet. 2. Shoreline: The shoreline frontage is approximately 204 feet along Anini's sandy shoreline, approximately 60 feet of it contains a rock rubble wall approximately 3 feet high, situated inland of the sandy beach. The shoreline vegetation consists of mature ironwood and kamani trees and naupaka. The offshore Anini reef protects this shoreline property from severe beach erosion. 3. Existing Structures Within Shoreline Setback: a. Outdoor shower: An existing outdoor shower as noted on the attached site plan was already on the property at time of purchase and is believed to have been installed by the former owner. It is considered a legal non- conforming use since it has been there for many years, prior to adoption of the current Comprehensive Zoning Ordinance. b. Wood Stump Fence: In addition to the outdoor shower, some large tree trunks approximately 2-3 feet high and 2+ feet in diameter were placed standing up in the NE corner of the property, approximately 25 feet in length, these of which were installed several years ago. Because it is considered a "fence", installed without any record of a shoreline permit, the logs were knocked over so that it is no longer functions as a fence, and can now be removed. C. Existing Buildings/Proposed Renovation: The three (3) structures on Unit A are: 1. Main Residence (Constructed in 1959): An older single story wood frame building with a shallow roof pitch, containing 2,400 sq. ft., with 2 bedrooms and 2 baths, nd 357 s.f. of lanais. This is a non -conforming structure being that its in the VE Tsunami zone and the finish floor elevation is at 10'MSL, or one (1) foot below the flood elevation. The proposed renovation on this building is to raise the roof by moving the ridgeline to the north and raising the makai wall plate line from 7'-6" to 105455 to accommodate higher windows and improve the ocean view. The existing ridgeline will be extended to the north, from 11'4feet high to 13'-6" from grade to peak. No increase in floor area is proposed and therefore the building footprint remains the same. Also proposed is a reconfiguration of the existing lanais. There are three (3) lanais totaling 357 s.f., A smaller lanai fronting each door will be provided; four are proposed at 32 s.f. each, resulting in a reduced lanai area and lot coverage, from 357 s.f. to 128 s.f., or 229 s.f. less. 2. Garage/Fitness Room (Constructed in 1959): Also an older wood frame structure consisting of 1,386 sq. ft., containing a garage, fitness room with bathroom, and a screened lanai that contains a sauna. This structure is also non -conforming, with its finish floor below 11'MSL. The intent is to remove 734 sf of floor area on the ground level, which includes a portion of the garage (481 so and lanai (253 so, raise the fitness/bathroom section approximately 8-9 feet, and move the lanai to the upper level. The fitness/bathroom portion will be raised to be above the FEMA flood elevation: the lanai will also be raised and reconfigured (239 so. The raised level will contain 616 s.f. of floor area. The lower level will be an open deck with storage with a floor area of 876 s.f., and a landing /stairway of 104 sf. The building footprint/lot coverage floor area for this structure will be reduced by 510 s.f. 3. Workshop/Storage (Constructed in 1993): An existing wood frame structure consisting of 558 sq. ft. This building was permitted and constructed after effectuation of the FEMA Flood Zone requirements and would therefore be considered a conforming structure. The proposed renovation of this structure is to elevate it approximately 10 feet to allow parking below to replace the garage removed in building 2 above, and add a stairway. The existing workshop portion contains 511 s.f. and the stairway adds 72 s.f. A 4' apron is added in front by the garage doors so that a truck could fit within it, adding 96 s.f. more. Thus the overall building footprint increases from 558 s.f. to 671 s.f., or 113 s.f. more than the existing footprint. The upper level is proposed to function as a music room with a half bath and lanai and contains approx. 530 s.f. 4. Unit B (ADU) Additional Dwelling Unit: A two-story structure built in 1994, with a carport and storage room on the ground level containing 780 s.f., and a living/kitchen studio with one bath (680 so and two lanais containing 625 s.f., on the second floor. This residence is used as a vacation rental and is a conforming structure, in compliance with flood zone requirements. The proposed renovations to this structure on the lower level include re -building the existing stairway and relocate it 12 feet to the north, remove the walls within the existing storage area to create an open space, and enclose the existing garage (256 so with "breakaway walls" to be a storage area. On the upper level, the rear deck (156 so and the stairway on the makai lanai will be removed. The kitchen and bath will be remodeled. Overall, the building footprint will be reduced by 200 s.f. from the removal of the rear lanai and makai stairs, and relocation of the stairway. 5. New Fence: An existing fence and gate fronting the property along Anini Road will be replaced. D. Lot Coverage: Existing Lot Coverage New Lot Coverage 1. Main Residence: 2,400 sf 27400 sf Lanais: (357sf x 50%) 179 sf 128 sf less 51 sf 2. Gar./Fitness Studio 1,386 sf 876 sf less 510 sf 3. Workshop: 558 sf 671 sf plus 113 sf 4. ADU: 1167 sf 1,021 sf less 146 sf Liv. area (680 so (680 so Cov. Lanai (260 sf) (288 so Cov. Stairs (96 so (0 so Open lanai (156x50%) (78 sf) (0 sf) Open lanai/stairs (106x50%= 53 sf) (53 so TOTAL LOT COVERAGE 51690 sf 5,096 sf. (594 sf less) D. Construction Costs Unit A: 1. Main Residence Roof Renovation 2. Garage/Fitness Studio Renov. 3. Workshop/Storage Renovation: Unit B 4. ADU Renovation Contractor's Estimate: $102,275.00 Contractor's Estimate: $62,290.00 Contractor's Estimate: $49,550,00 Contractor's Estimate: $59,600.00 5. New Fence/Gate: Contractor's Estimate: $5,043.00 TOTAL CONSTRUCTION COST:,,,,,,,,,," ......... A..... $278,708.00 Based on the above information, the total construction is less than the $500,000.00 limit, thus qualifying for an SMA Minor Permit, Market Value of property Unit A: .............. $3,130,000.00* Unit B:..................... $178987100.00* 1. Main Residence: ............. Replacement Cost Value: $649,890.00** 2. Garage/Fitness Studio:..... Replacement Cost Value: $180,000.00** 3. Workshop/Storage:.......... Replacement Cost Value: $102,240.00** 4. Unit B ADU:............... Replacement Cost Value: $266,880.00** *County of Kauai Real Property Assessment **Appraisal (Tom Hegarty) Of the above four structures, buildings 3 and 4 are in conformance with current zoning and building codes. Buildings 1 (Main Residence) and Building 2 (Garage/Fitness studio) are non -conforming since its finish floor is below the flood elevation. Building 2 however, will be elevated and brought into conformity after renovation. cot O! — rsv — DEED BOUNDARy AT HIGH WATER MARK AS SHOWN ON FlLE PLAN AUG. 21 1953 I SAN°Y SFAS . ESTIMATED - W SHORECIN j 13 I ®� f AUG 2oi5 ROCK WALL , _ --1 ,ACRE ZONE CPR BDY 0 I VEII 10 83' SETBACK BASED ON ESTIMATED SHORELINE AUG, 2015 SETBACK BASED ` DN ESTIMATED SHORELINE ❑ 9� AUG. 2015 I ' 29Dsf x .5=145sE ` ' Ranch Hour° .4.=n2 I Fc=8.50 I (2,395sf) d OOD { _ RI GE d - , j Land (248sf) / d I 5 (est.). . d (561si) f^ GATE' (1.146sf) 1 STEPS j / td / RESIDENCE L 1 l FE6=7.13 tS 1 FFA=15.8 1 ' ® aewr. _ o r MAILBOk Me HEADWALL � "F6 NIKII S§ BEACH ROAD EXHIBIT C �di'Je ai.1G� GATE Bernard P. Carvalho, Jr. Mayor Wallace G. Rezentes9 Jr. Managing Director Avery Yours 4-1525 Kubi`o highway Kapa'a, HI 96746 17 aA2tr a�J _ DEPARTMENT OF PUBLIC WOIZ,KS County of Kauai, State of Hawaii `-' ��: 4444 Rice Street, Suite 275, L3hu`e, Hawaii 96766 TEL (808) 241-4992 FAX (8D8) 241-6604 May 22, 2017 Subject: SHORELINE SETBACK APPLICATION SUBSTANTIAL IMPROVEMENT DETERMINATION RENOVATIONS TO FOUR EXISTING BUILDINGS TMK: (4) 5-3-005:001 UNITS A AND B Dear Mr. Yours, This is in response to your letter dated January 14, 2017 which requested that substantial Improvement Determinations (SID) be performed for four buildings on the subj ect property. The SID found that the renovations that are proposed for the four buildings are not considered substantial improvements. Your letter states that the "renovation work is proposed in accordance to Sec. 8-27.7, Permitted Structures within the Shoreline Setback Area, Item (6) which allows repairs that do not constitute a `substantial improvement' of the structure." We would like to point out that although the improvements were considered to be unsubstantial, the proposed renovation work includes both alterations and repairs. The Kauai County Shoreline Setback and Coastal Protection Ordinance (Ordinance No. 979) Section 8-27.2 defines substantial improvement as "any cumulative series ofrepairs, reconstruction, improvements, or additions to a structure over a ten (10) year period, where the cumulative cost equals or exceeds fifty percent (50%) of the market value of the structure before the start of construction of the first improvement during that ten (10) year period. For the purposes of this defmifion, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure." The Department of Public Works -Engineering Division (DPW) has reviewed the proposed renovations and improvements involving four (4) separate structures on the subj ect property. The determination of substanfial improvement is done separately for each structure. An Equal OppoYtunity EmployeY Hawaiian Preservation Trust, LLC Substantial Determination for TMK 5-3-005-001 May 22, 2017 Page 2 of 4 MAIN RESIDENCE The main residence is a single story structure and the proposed construction consists of raising the roof and the makai side wall and replacing windows around the structure. DPW has determined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Value The market value used in the calculations is from the appraisal completed by Thomas Michael Hegarty. He estimated the market value of the real property to be $649,890, as of November 28, 2016, which is the date of inspection and the effective date of the appraisal. Mr. Hegarty is a professional appraiser licensed in the State of Hawaii (License # SLA — 3 86) and the market value was based on the "Cost Approach." Cost of Improvements There were no building permits approved for the main structure within the past ten years. The total cost of improvements for the proposed roof raise and renovations to the main residence is taken to be the cost estimate of $102,275 that was prepared by S.G. Builders LLC, dated November 22, 2016. Summary The cost of improvements for the Main Residence compared to the appraised value is: Cost of Improvements (past IO years): $102, 275 = 0. I574 or 15.74% Market Value (Appraisal): $ 649,890 GARAGE/FITIVESS STUDIO The existing garage/fitness studio is a single story structure and the proposed construction work consists of raising structure above the FEMA flood elevation and constructing an open deck and storage below the raised structure. DPW has determined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Value The market value used in the calculations is from the appraisal completed by Thomas Michael Hegarty. He estimated the market value of the real property to be $180,000, as of November 28, 2016, which is the date of inspection and the effective date of the appraisal. Cost of Improvements There were no building permits approved for the garage/fitness studio within the past ten years. The total cost of improvements for the proposed renovations to the existing garage/fitness studio is taken to be the cost estimate of $62,290 that was prepared by S.G. Builders LLC, dated Hawaiian Preservation Tnrst, LLC Substantial Determination for TMK 5-3-005-001 1 May 22, 2017 Page 3 of 4 November 22, 2016. The proposed improvements include raising a portion of the structure to an elevation above the base flood elevation. Summary The cost of improvements for the Garage/Fitness Studio compared to the appraised value is: Cost oflmprovements (past 10 years): $62,290 Market Value (Appraisal): $180, 000 = 0.346 or 34.6% WORKSHOP/STORAGE The existing workshop/storage is a single story structure and the proposed construction work consists of raising the structure above the base flood elevation and constructing a new garage area below the raised structure. DPW has determined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Value The market value used in the calculations is from the appraisal completed by Thomas Michael Hegarty. He estimated the market value of the structure to be $102,240, as of November 28, 2016, which is the date of inspection and the effective date of the appraisal. Cost of Improvements There were no building permits approved for the workshop/storage within the past ten years. The total cost of improvements for the proposed raising and renovations to the workshop/storage is taken to be the cost estimate of $49,550 that was prepared by S.G. Builders LLC and submitted with a contractor's affidavit on May 1, 2017 to the Engineering Division. Summary The cost of improvements for the Workshop/Storage compared to the appra se d value is: Cost oflmprovements (past 10 years): $49, 550 Market Value (Appraisal): $102, 240 — 0.485 or 48.5% ADDITIONAL DWELLING UNIT (ADU) The existing ADU is a 2-story structure and the proposed construction work consists of enclosing the lower level, removing the walls within the existing storage area and renovating the stairs and upper level living area. DPW has determined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Value There was one building permit approved for the structure within the past ten years. The first building permit, BP 09-0061, was approved in 2010. Therefore, the market value used in the calculations is the 2010 Replacement Cost New Less Depreciation (RCNLD) value for the Hawaiian Preservation Trust, LLC Substantial Determination for TMK 5-3-005-001 NI ay 22, 2017 Page a of 4 structure. The market value used in the calculations is from the 2010 appraisal completed by Thomas Michael Hegarty. He estimated the market value of the structure to be $193,725, as of January 1, 2010 and the effective date of the appraisal. Cost of Impfovements The cost of improvements for the past building permit is taken to be the valuation shown in DPW Building Division records. The cost of improvements for the proposed renovations to the existing ADU is the cost estimate of $59,600 that was prepared by S.G. Builders LLC, dated November 22, 2016 and submitted with a contractor affidavit on May 9.2017 via email to the Engineering Division. The total cost is sira marized as follows for the past 10 years: BP 09-0061I i ----------------- CURRENT BP ! ,600 $59,600 ----------------------------- ------------------ TOTAL $86,200 ! ---------------------------------------- The cost of improvements for the ADU compared to the market value is summarized as follows: Cost oflmprovements (past 10 years): $86,200 — 0.4449 or 44.5% Market Value (Real Property): $193, 725 Since the total cost of each structure does not exceed 50% of the market value, the unprovements is not considered to be substantial. Based on our records there were no other permits for these structures within the past ten years. However, if any unpermitted work has been one, or if there are modifications to this application, our determination shall be considered void and the structure must be re-evaluated. If you have any quesfions or need additional information, contact Stanford Iwamoto at (808) 241-4896 or siwamoto(c�kauai.gov. Sincerely, MICHAEL MOULE, P.E. Chief, Engineering Division BV/SI Copy to: Design and Permitting Planning 0 o� o z 0 O m D A (p 10 � O O (n• O O Q Q- CD C F •, e1 I PLANNING DEPARTMENT FOR OFFICIAL USE ONLY; SSD 201 W - Acceptance Date: website Posting Date: .—( Detemilnation Date: Planning Commission Date: Expiration Date:^0-1 Plainer Assi ed: Instructions: File all information requested under at A for processing the Determination of Applicability (§ 8-27.1), including signature page. Fill out Parts A and B if you know, due to proximity of the shoreline, that your parcel will require a Certified Shoreline Survey. If you are proposing a permitted structure or subdivision within the shoreline setback area fill in Part C. For applications involving a variance, complete Partp. ' A 'licant Information Applicant: GCT PROPERTIES, LLC Mailing Address: 1717 Akahi St. Floor 2 Phone: 808 245 3975 Honolulu, HI 96813 Email: Applicant's Status: (Check one) Owner of the Property ❑ Lessee of the Property ❑✓ Authorized Agent (Holder of at least 75 % of the equitable and legal title) Lessee must have an unexpired and recorded lease of five (5) years or more from the date of filing of this application. If not, Owner(s) must provide a Letter of Authorization. Attach Letter of Authorization Transmittal Date: April 10, 2017 Project Information (attach additional sheets, if necessary) County Zoning District: Resort Residential RR-20 Tax Map Key(s): 4-3-07:011 Land Area: 4.002 Ac. Nature of Development: (Description ofpropesed-- structure or subdivision) Interior repairs and renovation of 72 units in four existing buildings, to Ind, bath, -renovation; include-3 ADA-baths;-replace -flooring/fixtures,-repair railings;- etc. -(3EE ATTACHED PROJECT DESCRIPTION AND PLANS) NO PERMITS WILL BE ISSUED WITHOUT PLANNING COMMISSION ACCEPTANCE, EXCEPT AS PROVIDED IN so-41 kc)ko) Part A Shoreline Setback Determination of Applicability (§8.27.1) Check all that apply, fill in applicable information. Any box checked must be accompanied by additional information, �hotos and/or documentation. ✓ Properties Abutting the Shoreline Project's approximate distance from shoreline: approx. 20'to 160' ❑ ❑ Properties Not Abutting the Shoreline Project's approximate distance from shoreline: ® Additional Information: . ❑ 'Closest distance of improvement(s) from Shoreline is approximately 20 ft. ❑ Number of parcels and Type of improvements (roads, buildings, structures) between Shoreline and this parcel: -1- s/as/ss PLANNING DEPARTMENT FOR OFFICIAL USE ONLY: SSD 201 Acceptance Date: Website Posting Date: Determination Date: Planning Commission Date: Expiration Date: Planner Assi ed: ® Topography (undulating, flat, slope, etc.) and ground elevation of subject parcel (Lowest and Highest elevations) ❑ Shoreline type (e.g. beach, dune, rocky, sandy with rocky outcropping, etc.) shelf, intermittent sand, with existing conc. revetment Arti£ciallyarmoredShoreline ❑ If checked, what type of armoring (e.g. seawall, revetment, bulkhead): revetment ❑ Is the armoring permitted/authorized? Yes ®❑ Date of authorization (attach copy of authorization letter): ✓ Is property in coastal floodplain (if checked, what zone)? sHoae,vrreLoGs. zoNax Has this EroacAy been subject to coastal hazards in th�.past? (If checkedlease describ, Furricane damage in restaurant portion, 1992 If the proposed stmeture or subdivision is within the shoreline setback area then, please be aware that if the determination of a structure is approved, the Applicant shall agree in writing that the Applicant, its successors, and permitted assigns shall defend, indemnify, and hold the County of Kauai harmless from and against any and all loss, liability, claim or demand arising out of damages to said structures from any coastal natural hazards and coastal erosion, pursuant to § 8 -27.7(b)(2). The requirements of the Subsection (b) shall run with the land and shall be set forth in a unilateral agreement recorded,by the _.. __ -.___applicabtwith-theBureanofGonveyances-or the-hand-Court;-whisheverisapplicahle,-no-later than#Irirty-(30}days-after the- -- -- date of final shoreline approval of the structure under §8-27.8. A copy of the recorded unilateral agreement shall be filed with the Director and the County Engineer no later than forty-five (45) days after the date of the final shoreline determination and approval of the structure and the filing of such with the Director shall be a prerequisite to the issuance of any related building permit. §8-27.7(b)(6). PLANNING DEPARTMENT U If Part A has been deemed that a Determination will be necessary, the additional information will be required for submission of this application. Part 13 Exemption Determination ® A non-refundable processing fee of one hundred dollars shall accompany a request for determination. (§8-27.8(e)) ❑ Exemption 1 In cases where the proposed structure or subdivision satisfies the following four criteria: (A) In cases where the proposed structure or subdivision is located outside of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) `V' or `VE' flood zones; (B) The proposed structure or subdivision is located at an elevation which is thirty (30) feet above sea level or greater; (C) The applicant can demonstrate to the satisfaction of the Planning Director that the property is clearly adjacent to a rocky shoreline and that it will not affect or be affected by coastal erosion or hazards; and (D) The shoreline setback shall be sixty (60) feet from the certified shoreline which has been established not more than twelve (12) months from the date of the application for the exception under this section. ® Exemption 2 In cases where the applicant can demonstrate to the satisfaction of the Planning Director that the applicant's proposed structure or subdivision will not affect beach processes, impact public beach access, or be affected by or contribute to coastal erosion or hazards, excluding natural disasters. Factors to be considered shall include, but not be limited to, proximity to the shoreline, topography, properties between shoreline and applicant's property, elevation, and the history of coastal hazards in the area. QExemption 3 Those structures and uses found exempt in Table 3 (§8-27.7) (see pg. 5-6) ' FVJ Letter from the Department of Public Works stating that the proposed project does not constitute "Substantial Improvement," pursuant to §8-27.2 §8-27.3 the Kauai County Code, 1987 as amended, the Planning Department hereby certifies the •uchrre(pj@r subdivisions) as exempt from those shoreline setback determination requirements under 6 2 .8. 3- s/as/ss MOKIHANA OF KAUAI RENOVATIONS PROJECT DESCRIPTION I.0 BACKGROUND/SITE DESCRIPTION: L. Site Location: This project is on oceanfront property situated on the north end of the Coconut Plantation Resort, and contains 80 units. To the north also is the Uhelekawawa Stream, also known as the Waipouli Drainage Canal, and the Waipouli Resort beyond that, and to the south is a vacant resort zoned parcel that contains a coconut grove planted in 1896, that is protected by the Exceptional Tree Ordinance. The eastern boundary is the ocean with a concrete revetment, the shoreline beyond it being a coral shelf with intermittent sand pockets on the southern end. The site is flat, with a ground elevation of approximately ( feet MSL. The five existing buildings are clustered around an open courtyard that contains a swimming pool with a large deck, shuffleboards and open lawn, with the ocean bordering it on the east side. The restaurant is situated on the northeast corner of the property alongside the canal and the ocean. 1,2 Buildings: Originally constructed in the 1960's, this project was the first timeshare condominium on the island. Consisting of a cluster of five (5) buildings, the first being a two story building (Bldg. L) with the reception lobby, office and restaurant with kitchen on the first level, with 7 studio apartments on the second level and a one bedroom manager's unit. This building will be left intact and no renovations are proposed within it. Buildings A, B, C and D are three (3) stories each and similar in design, with six (6) units on each level for a total of eighteen (18) units per building or 72 units in all, these of which are proposed to be repaired and renovated. All units within these buildings to be renovated are existing studios with a kitchenette (bar sink), and with a single bathroom. The buildings were constructed with masonry bearing walls and concrete floors, with a steep pitched wood frame roof. 1.3 Concrete Revetment: The site is protected by a concrete revetment that was built in the seventies to protect the property from shoreline erosion. Contrary to today's condition, when the project was originally constructed, there was a sandy each fronting the property at least 50 feet wide. Shoreline erosion occurred when the State extended the groin at the outlet of the canal, which is believed to be the cause of the erosion, triggering the need for a protective revetment in front of the property. The revetment, built 1.4 Flood Zone: A portion of the site between the two most seaward buildings are in the VE zone, elevation 11' MSL. At the shoreline boundary, the VE line extends up to the building line at Bldg. D, and at the northeast corner, it overlaps into the restaurant portion of Bldg. L. It should be noted that no improvements or development is proposed within the restaurant building, and that all renovation work will occur within the residential apartment Buildings AB, C and D, all of which are not in the flood zone and are designated in Zone X. 2.0 PROJECT DESCRIPTION Since this facility is over 50 years old, its age and exposure to the eastern shoreline weather conditions has contributed to its deterioration whereby its now in need of maintenance, upgrading and improved renovations. The work proposed is focused on interior improvements and replacement of old and/or outdated fixtures, wall coverings, doors, windows, and mechanical, plumbing and electrical upgrades. 2.1 Proposed Improvements: Proposed work is for the re -furbishing and upgrade of the individual studio apartments interior in Buildings A, B, C and D. The unit floor plans for Buildings A, C and D are close to identical with all bathrooms having a tub/shower; Building B is slightly different with each bathroom having a shower instead, but all unit layouts in the building being identical. 2.1.1 Electrical & Mechanical: Electrical work involves replacement of light switches, receptacles, smoke detectors, fixtures, exposed conduits and electric panel. Plumbing work involves installing all new bathroom fixtures and showers, with a unit shut off valve, and disconnecting the kitchenette sink. 2.1.2 F.F & E: Involves the installation new doors, windows, vanities, closet and hardware. 2.1.3 Misc: This category involves painting, preparation and clean-up. It also includes miscellaneous repair work, such as patching deck surfaces, stair repair, chipped areas and concrete spawling. 3.0 Construction Estimate/Appraisal: Attached as Exhibit is the Contractors Cost estimate at $2,619,900,00. Also attached is the Market Value Appraisal estimated at $80550,000.00. 4.0 PROJECT JUSTIFICATION An inspection of the property and a walk through atypical unit and as confirmed by the age of the structures, will instantaneously give one the impression that the resort needs to be upgraded. Not only because it needs improved maintenance, but also to keep abreast with conditions, styles and amenities provided by other resorts. More importantly, remodeling of these facilities can improve the overall visitor experience to the island at least by providing better accommodations that are not outdated and reasonably priced, hopefully enhancing the impression of Kauai from a visitor's standpoint. GUT Properties LLC 1717 Akahi Street Honolulu, HI 96819 3/31/?_017 COUNTY OF KAUAI Building Department 4444 Rice Street, Suite 175 Lihue, Kauai, HI 96766 RE: Mokihana Resort / GCT Properties LLC TMK: (4) 4-3-007-011-0000 Permit # 14-01 18: Mokihana Bldg. C (Z-509-14) Permit # 14-0162: Mokihana Bldg. L Permit # 14-0855: Mokihana Bldg, A Permit # 14-0856: Mokihana Bldg, B Permit # 14-0857: Mokihana Bldg, D Dear Mr. Doug Haigh, This letter is to request withdrawal of the above building (and zoning) permits previously issued for the above renovation project. New permit applications will be submitted shortly. This letter further grants authorization forAvery Youn, Architect, to apply for any and aII Shoreline Setback, Special Management Area, Zoning and Building Permits required for the Mokihana Resort Renovation project- going forward from this date. Thank you, Gary la �� Managing Member EXHIBIT A LETTER OF AUTHORIZATION Bernard P. Carvalho, Jr. Mayor Wallace G. Rezentes, Jr. Managing Director DEPARTMENT OF PUBLIC WORKS County of Kauai, State of I-Iawal`t 4444 Rice Street, Suite 275, L1hu`e, Hawaii 96766 TEL (808) 2414992 FAX (808) 241-6604 June 19, 2017 GCT Properties, LLC 1717 Akahi St. Floor 2 Honolulu, HI 96813 Subject: SHORELINE SETBACK APPLICATION SUBSTANTIAL IMPROVEMENT DETERMINATION MOKIHANA OF KAUA'I — INTERIOR RENOVATIONS OF 72 UNITS TMK: (4) 4-3-007-011 To whom it may concern, The Kauai County Shoreline Setback and Coastal Protection Ordinance (Ordinance No. 979) Section 8-27.2 defines substantial improvement as "any cumulative series of repairs, reconstruction, improvements, or additions to a structure over a ten (10) year period, where the cumulative cost equals or exceeds fifty percent (50%) of the market value of the structure before the start of construction of the first improvement during that ten (10) year period. For the purposes of this definition, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure." The Department of Public Works (DPW) Engineering Division has reviewed the proposed interior renovations for 72 units in four connected buildings. DPW has determined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Yalue Mokihana of Kauai is a multi -story structure, connecting four buildings and a restaurant. There were three (3) building permits approved for the structure within the past ten years. The first building permit, BP 10-1497 was approved in 2010. The market value used in the calculations is from the appraisal completed by Robert C. Hastings of Colliers International. He estimated the market value of the real property to be $5,910,000, as of January 2007, which is the effective date of the appraisal. Mr. Hastings is a professional appraiser licensed in the State of Hawaii (License # CGA-632) and the market value was based on the "Cost Approach." An Egual Opportunity Employer Mokihana of Kauai Shoreline, Setback Application — Substantial Improvement Determination _ June 19, 2017 Cost of Improvements The cost of past building permits is talcen to be the valuation shown in DPW. Building Division records. The total cost of improvements for the proposed interior renovations for the 72 units is taken to be the cost estimate of $2,587,900 that was prepared by Shioi Construction, Inc. and submitted with a contractor's affidavit on June 16, 2017. The total cost is summarized as follows for the past 10 years: - ------------ - BP 10-1497 $1261750 - ------------------------- BP 12-1660 $112' 000 - — —-------- BP 14-0834 $84,101 ---------------------------------- --- CURRENT BP $2' 587 900 ------------------------ r-------------- ---- --- TOTAL P $2 910 751 Summary The cost of improvements compared to the market value is: Cost of Improvements (past 10 years): $2,91 Q 751 = 5 Market Value (Real Property): $5, 910, 000 0.492or 49:3% Since the total cost does not exceed 50% of the market value, the improvement is not considered to.be substantial. Based on our records there were no other permits for the structure within the past ten years. However, if any unpermitted work has been done, or if there are modifications to this application, our determination shall be considered void and the structure must be re- evaluated. If you have any questions or need additional information, contact Stanford Iwamoto at (808) 241-4896 or siwamotonakaum.gov. Sincerely, AMIC?IL MOULE, P.E. Chief Engineering Division Copy: Design and Permitting Planning Avery Youn, 4-1529 Kubi6 Hwy Suite 211, Kapa`a AVERY YOUM ARCHITECT 4-1525 KUHIO HIGHWAY KAPAA,HI96746 April 11, 2017 T0: Dept. of Public Works Engineering Division 4444 Rice St. Lihue, Hawaii ATT: Mr. Stanford Iwamoto RE: REQUEST FOR NON -SUBSTANTIAL IMPROVEMENT LETTER: MOKIHANA OF KAUAI RENOVATION Waipouli, Kauai,Hawaii TMK: 4-3-07:11 Dear Mr. Iwamoto, The subject project is for the renovation and upgrade of the Mokihana of Kauai Resort at Waipouli. Originally constructed in the 1960's, the project consisted of five (5) buildings, the first being a two story building (Bldg. L) with the reception lobby, office and restaurant with kitchen on the first level, with 7 studio apartments on the second level and a one bedroom manager's unit. This building will be left intact and no renovations are proposed within it. Buildings A, B, C and D are three (3) stories each and similar in design, with six (6) units on each level for a total of eighteen (18) units per building or 72 units in all, these of which are proposed to be repaired and renovated. All units within these buildings to be renovated are existing studios with a kitchenette (bar sink), and with a single bathroom. The existing building is non -conforming since its finished floor elevation is below the flood elevation. A portion of the property is located within the VE Flood Zone with a flood elevation of 11 feet above MSL. It should be noted that the proposed improvements will only occur in theresidential apartment buildings, which are outside of the VE zone, designated as Zone X. An appraisal is attached that determines the market value of the replacement cost of the project: Replacement cost ofbuilding:.........................................................................................$8,550,000.00 X SO% = $4,275,000,00 A contractor's cost estimate attached places the renovation cost ast::...............2,619,900,00,00.00 The above figures indicate that the renovation/reconstruction costs is wayless than 50% of the market value replacement cost. Relative to the Shoreline Setback Ordinance, a non -conforming structure can be repaired or renovated provided the cumulative cost of repairs, improvements, etc., will not exceed 50% of the market value of the existing structure.... The above estimates confirm that the proposed improvements are at approximately 31% of the appraised replacement cost. Therefore, a conclusion that the projects proposed renovation/repair cost is less than 50% of the market value of the replacement cost, and that the project not be considered "Substantial Construction" would be deeply appreciated. Should any additional information be required, I can be reached at (808) 639 7999. Aq t AV f .i h i :.._ I }III Ij J. j toI rn — / ,. .11 ....�.. iVI an / s L, i. VIA i�1 ,, IVA, I,. ;�91Z: IIp u,.. IL 4:. .. .. I/Ii �Fh ,v r Ac _ 4 I.P ., ....14 S�rIIAVV A.� I, AVAV AIL' IF a I - LL ,� �o, - ALI �I _ _I Air ; ;u y v li 4 i A, kL �, - i� ;_ - <.... .;.. AAe _ .=- Fti... �, may' r + NO PLANNING DEPARTMENT SHORELINE SETBACK APPLICATION FOR OFFICIALUSE ONLY: _ `' SSD 201 � - a Acce tanceDate: • WebsitePostin Date: y- DeteiminationDate: 1 Plannin Commission Date: - Gj-1'1 iradon Date: �. < —t Planner Assigned: U Inshvetions: File all information requested under Pant A for processhtg the Determination of Applicability (§ & 27.1), including signature page. Fill out Parts A and B if you lniow that your parcel will require a Certified Shoreline Sutvey, due to the proximity to the shoreline, If you are proposhig a petlnitted structure or subdivision within the shoreluie setback area fill in Part C. For applications involving a variance, complete Patt D. ` A licant Information Applicant: Kauai Coconut Beach, LLC Mailing Address: 650 Aleka Loop Phone: 675-349-0909 ' Kapaa, Hawaii 96746 Email: pmiller@davidsonhotels.com Applicant's Status: (Check one} ® Owner of the Property ❑ Lessee of the Property ❑ Authorized Agent (Holder of at least 75% of the equitable and legal title) Lessee must have an unexpired and recorded lease of five (5) years or more from the date of filing of this applicafiou. If not, Owners) must provide a Letter of Authorizaflon, Attach Letter of Authorization Transmittal Date: County Zouhrg Dishict: Nature of Development: (Description of proposed or RR-20 Tax Map I{ey(s): (4) 4-3-007: 028 Lalld Area: 10377 Acres covering the entire tennis courts. Plans are attached. NO PERMITS WILL BE ISSUED WITHOUT PLANNING COMMISSION ACCEPTANCE, EXCEPT AS PROVIDED IN §8-27.8(c)(8) Part A Shoreline Setback Determination of Applicability (§8-27.1) Check all that apply, fill in applicable information. Any box checked must be accompanied by additional information, photos and/or documentation. 1. Property is Abutting the Shoreline ❑ Proposed project's approximate distance from shoreline (based on aerial map): ft. 2. Property is Not Abutting the Shoreline Q Proposedproject's approximate distauce from shoreline (based on aerial map): 28o ft. 3. AdditionalInfotvration: ❑ Shoreline Change (Erosion/Accretion) Rate: ft./year (Iufor7nation available here: wwmvsoest:hawaii.edu/coasts/kauaicounty/KCounty.hi�nl) ❑ Number and description of parcels (including roads, buildings, sttucriues) between Shoreline and this parcel: -1- L e■ PLANNING DEPARTMENT SHORELINE ,SETBACK APPLICATION Topography is relatively flat in the vicinity of Ground elevation is approximately 8-10 feet. 0 Artificially armored Shoreline ❑ If checked, at type of armoring (e.g. seawall, revetment, bulkhead): ❑ Is the armoring permitted/authorized? ❑ Date of authorization (attach copy of authorization letter): Is property in coastal floodplain (if checked, what zone)? Has this orouertv been subiect to coastal hazards (i.e. flooding_ emsinn. is PL);ASC NOT);: Any misrepresentation of information in this shoreline setback application will result in revocation of this determination and may result in fines and criminal prosecution. Signature S•3/-/ Date - � ApPticability(tobe corn pleted'by PlaiuiingDepartmeiit)''" "- Setback Determination necessary. Requirements of Ordinance No. 979 are applicable. ❑ Setback Determinajfiour is NO"ecessary. Requirements of Ordinance No. 979 are not applicable. z- 5/2!ll s D�T4, OF.h.9r. r, PLANNING DEPARTMENT SHORELINE SETBACK DETERMINATION of aP If Part A has been deemed that a Determination will be necessary, the additional information will be required for submission of this application. Part B ❑ A non-refundable processing fee of one hundred dollars (a100.00) shall accompany a request for determination. (§8-27.8(e)) ❑ An aerial maplimage (ex. Google Maps or Google Earth) with a line drawn from the shoreline/vegetation line (approximate shoreline) to the proposed project and the calculated distance in feet. ❑ A detailed Plot Plan to scale with all existing and proposed structures including driveways, visible lot coverage, setbacks and measurement details, fences, gates, and walls, etc. ❑ Building Permit Number (If building plans submitted) Exemption Determination ❑ Exemption 1 In cases where the proposed structure or subdivision satisfies the following four criteria: (A) In cases where the proposed structure or subdivision is located outside of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) `V' or `VE' flood zones; (B) The proposed structure or subdivision is located at an elevation which is thirty (30) feet above sea level or greater; (C) The applicant can demonstrate to the satisfaction of the Planning Director that the property is clearly adj acent to a rocky shoreline and that it will not affect or be affected by coastal erosion or hazards; and (D) The shoreline setback shall be sixty (60) feet from the certified shoreline which has been established not more than twelve (12) months from the date of the application for the exception under this section. Exemption 2 In cases where the applicant can demonstrate to the satisfaction of the Planning Director that the applicant's proposed structure or subdivision will not affect beach processes, impact public beach access, or be affected by or contribute to coastal erosion or hazards, excluding natural disasters. Factors to be considered shall include, but not be limited to, proximity to the shoreline, topography, properties between shoreline and applicant's property, elevation, and the history of coastal hazards in the area. ❑ Exemption 3 Those structures and uses found exempt in Table 3 (§8-27.7) including repairs and renovations that DO NOT enlarge or expand a nonconfornning structure. (see pg. 7) ❑ Letter fiom the Department of Public Works stating that the proposed project does not constitute "Substantial Improvement," pursuant to §8-27.2 (If applicable, will require valuation of project) Pursuant to §8-27.3 the I{aua`i County Code, 1987 as amended, tUe Plamring Department hereUy certifies the proposed shucture(s) or subdivisions) as exempt from those shoreline setback determination requirements established ruder §8-27.8. ❑ Pursue t to §8-2is) h Kaua`i County Code, 1987 as amended, the proposed structure(s) is permitted within the shoreline setb ck }ea. Wlx nipt from those shoreline setback detemrirtation requirements established under §8-27.8, the pr use structu suhjel f%—ths conditions of §8-27.7(b). (See pg. 8) n I -3- 5/1/17 File too large a On file with department upon request. PLANNING DEPARTMENT SHORELINE SETBACK APPLICATION FOR OFFICIAL USE ONLY: SSD 201__?/ - Acceptance Date: — j - WebsitePostingDate: —jy Determination Date: �l —( Planning Commission Date: Expiration Date: — G Planner Assigned: cJ (o Instructions: F le all information requested under Part A for processing the Determination of Applicability (§8-27.1), including signature page. Fill out Parts A and B if you know, due to proximity of the shoreline, that your parcel will require a Certified Shoreline Survey. If you are proposing a permitted structure or subdivision within the shoreline setback area fill in Part C. For applications involving a variance, complete Part D. A licant Information Applicant: J. Michale Will, P.E./ Construction Operation Engineer FHWA Mailing Address: 12300 W. Dakota Avenue suite 380 Phone: 1-720-963-3647 Lakewood CO 80228 Email: Michael.Will@dot.gov A licant's Status: (Check one) Owner of the Property Lessee of the Property �-�1 L+J Authorized Agent Holder of at least 75% of the equitable and legal title) - Lessee must have an unexpired and recorded lease of five (5) years or more from the date of filing of this application. If not, Owner(s) must provide a Letter of Authorization. Attach Letter of Authorization Transmittal Date: April 7, 2016 PYOieCt Information (attach additional sheets, if necessary) County Zoning District: KawanauDlshnct Tax MapKey(s): TM [414a414024, 031par. 03par. 090par CS2poa,ln,.-, Land Area: Nature of Development: The stare of Hawaii Department erTransportation (HooT), proposes Improvements to (,) the intersection or Kumn Highway and Mairnpna /Desert tlOn Of r0 OSed Roatl and (2) the Kapaa Stream Bridge on the island ar Kauai. This project woultl reconfgure the intersection by constructing a rountlabout. i1 It Ir The existing lwo-span bridge would be roplacetl wltha slightly longer antl witlersingle-span bridge alongthe same alignment. structure or subdivision) NO PERMITS WILL BE ISSUED WITHOUT PLANNING COMMISSION ACCEPTANCE, EXCEPT AS PROVIDED IN §8-27.8(c)(8) Part A Shoreline Setback Determination of Applicability (§8-27.1) _ `7 Check all that apply, fill in applicable information. Any box checked must be accompanied by additional information, photos and/or documentation. Properties Abutting the Shoreline Project's approximate distance from shoreline: > Q Pro cities Not Abutting the Shoreline Project's approximate distance from shoreline: 126'ml 58' 0✓ Additional Information: 126' J� Closest distance of improvement(s) from Shoreline is approximately ft. ❑ Number of parcels and type of improvements (roads, buildings, structures) between Shoreline and this parcel: 1- e/os/ss PLANNING DEPARTMENT SHORELINE SETBACK APPLICATION FOR OFFICIAL USE ONLY: SSD 201 Acceptance Date: Website Posting Date: Determination Date: Pluming Commission Date: E - cation Date: Planner Assigned: ✓❑ Topography (undulating, flat, slope, etc.) and ground elevation of subject parcel (Lowest and Highest elevations) The existing highway is positioned above the shoreline at an approximate 21 feet above sea level. d❑ Shoreline type (e.g. beach, dune, rocky, sandy with rocky outcropping, etc.) The shoreline is beach and rocky outcropping Artificially armored Shoreline If checked, what type of armoring (e.g. seawall, revetment, bulkhead): Is the armoring permitted/authorized? Date of authorization (attachcopyof authorization letter): QIs property in coastal floodplain (if checked, what zone)? Ae Has this property been subject to coastal hazards in the past? (If checked, please describe)_— �fhe project is located in a tsunami evacuation zone and floodplain, and is subject to coastal hazards. If the proposed structure or subdivision is within the shoreline setback area then, please be aware that if the determination of a structure is approved, the Applicant shall agree in wrng that the Applicant, its successors, and permitted assigns shall defend, ndemnify, and hold the County ofI{aua`i harmless from and against any and all loss, liability, claim or demand arising out of damages to said structures from any coastal natural hazards and coastal erosion, pursuant to §8-27.7(b)(2). The requirements of the Subsection (b) shall run with the land and shall be set forth in a unilateral agreement recorded by the applicant with the Bureau of Conveyances or the Land Court, whichever is applicable, no later than thirty (30) days after the date of final shoreline approval of the structure under §8-27.8. A copy of the recorded unilateral agreement shall be filed with the Director and the County Engineer no later than forty-five (45) days after the date of the final shoreline determination and approval of the structure and the filing of such with the Director shall be a prerequisite to the issuance of any related building permit. §8-27.7(b)(6). Applicant's Signature ilfA necessary. Requirements of Ordinance No. 979 are applicable. -2- 3/OS/15 PLANNING DEPARTMENT SHORELINE SETBACK DETERMINATION If Part A has been deemed that a Determination will be necessary, the additional information will be required for submission of this application. Part B Exemption Determination ❑✓ A non-refundable processing fee of one hundred dollars ($100.00) shall accompany a request for determination. (§8-27.8(e)) ❑ Exemption 1 In cases where the proposed structure or subdivision satisfies the following four criteria: (A) In cases where the proposed structure or subdivision is located outside of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) `V' or `VE' flood zones; (B) The proposed structure or subdivision is located at an elevation which is thirty (30) feet above sea level or greater; (C) The applicant can demonstrate to the satisfaction of the Planning Director that the property is clearly adjacent to a rocky shoreline and that it will not affect or be affected by coastal erosion or hazards; and (D) The shoreline setback shall be sixty (60) feet from the certified shoreline which has been established not more than twelve (12) months from the date of the application for the exception under this section. Exemption 2 In cases where the applicant can demonstrate to the satisfaotion of the Planning Direotor that the applicant's proposed stmcture or subdivision will not affect beach processes, impact public beach access, or be affected by or contribute to coastal erosion or hazards, excluding natural disasters. Factors to be considered shall include, but not be limited to, proximity to the shoreline, topography, properties between shoreline and applicant's property, elevation, and the history of coastal hazards in the area. ❑ Exemption 3 Those structures and uses found exempt in Table 3 (§8-27.7) (see pg. 5-6) ❑ Letter from the Department of Public Works stating that the proposed project does not constitute "Substantial Improvement," pursuant to§8-27.2 Exem fion Determination (to be completed by Planning Department) Pursuant to §8-27.3 the Kauai County Code, 1987 as amended, the Planning Department hereby certifies the proposed structufe . c r subdivision(s) as exempt from those shoreline setback determination requirements es lisedun$ r§8.7.8. /05/15 PLANNING DEPARTMENT SHORELINE SETBACK VARIANCE Part D Shoreline Setback Variance (§8-27.9) This part is the request for a shoreline setback variance. In addition to the documentation and information requested in Parts A, B, and C, the Applicant applying for a variance is required to submit all required information, per §8-27.9 listed in the checklist below. ❑ Anon -refundable administrative fee ofthree hundred dollars (`fi30ti.it0}. Certification from the owner or lessee of the lot which authorizes the application for variance; ❑ An environmental assessment and or EIS, if required, prepared in accordance with HRS Chapter 343, and the environmental impact statement rules and applicable guidelines of the State of Hawaii; The names, addresses, and the tax map key identification of owners of real property situated adj acent to and abutting the boundaries of the land on which the proposed structure or subdivision and/or landscaping is to be located; or operation is to occur (attach information); ❑ �e plan of the shoreline setbaok area, drawn to scale, showing: Existing natural and man-made features and conditions within; Existing natural and man-made features and conditions along properties immediately adjacent to the shoreline setback area and proposed improvements; ❑ The certified shoreline and the shoreline setback line (submitted under Part B); Contours at a minimum interval of two (2) feet unless waived by the Director; and ❑ Proposed development and improvements showing new conditions with a typical section (if a structure). ❑ A copy of the certified shoreline survey map of the property (submitted under Part B); Detailed justification of the proposed project, which addresses the purpose and intent of these rules and the criteria for approval of a variance (attach written statement); Analysis and report of coastal erosion rates and coastal. processes; and 01 Director Any structure approved within the shoreline setback area by variance shall not be eligible for protection by shoreline hardening during the life of the structure, and this limitation and the fact that the structure does not meet setback requirements under § 8-27.3 and could be subject to coastal erosion and high wave action shall be written into a unilateral agreement that is recorded by the Bureau of Conveyances of Land Court, as the case may be. A copy of the unilateral agreement shall be submitted to the Planning Department prior to the issuance of the required zoning and/or shoreline setback variance. Failure of the grantor to record these deed restrictions shall constitute a violation and the grantor shall be subject to the penalties set forth in this Article 3. For any structure approved within the shoreline setback area by variance, the Applicant shall agree in writing that the Applicant, its successors and permitted assigns shall defend, indemnify and hold the County ofICaua`i harmless from and against any and all loss, liability claim, or demand arising out of damages to said structure and this indemnification shall be included in the unilateral agreement required above. 5- 3/OS/15 File too large to scan. On file with department upon request. F'0R OFFICIAL USE ONLY: 201 19 SSD Acceptance Date: Website Posting Date: - DetermiaationDate: Planning Commission Date: p, Y t Expiration Date: Planner Assigned: Instructioxrs: File all information requested under Part A for processing the Determination of Applicability (§8-27.1), including signature page. Fill out Parts A and B if you know that your parcel will require a Certified Shoreline Survey, due to the proximity to the shoreline. If you are proposing a permitted structure or subdivision within the shoreline setback area fill in Part C. For applications involving a variance, complete Part D. A' licant Iuformation Applicant: Adam Brown for Bret Cook Mailing Address: 5784 Abalcea St Phone: 808 652 9440 Kapaa, Hawaii 96746 Email: bwaybrown gmail.core A plicant's Status: (Check one) Owner of the Property ❑ Lessee of the Property ® Authorized A ent I (holder of at least 75% of the equitable and legal title) Lessee must have an unexpired and recorded lease of five (5) years or more from the date of filing ofthis application. If not, Owner(s) must provide a Letter of Authorization. I Attach Letter of Authorization Transmittal Date:: Pro'eet Information (attach additional sheets, ifneeessary) County Zoning District: Residential Talc Map Key(s): (4) 2-08-019:004 0035 Land Area: 1.91 acres / 83,210 sf Nature of Development: (Description of proposed structure or subdivision Existing structure, Interior remodel of kitchen and master bath Replace existing window and doors as shown on plans. No increase to exterior footprint. NO PERMITS WILL BE ISSUED WITHOUT PLANNING COMMISSION ACCEPTANCE, EXCEPT AS PR®VIDED27.8(c)(8) art A Shoreline Setback Determination of Applicability (§8.27.1) Check all that apply, fill in applicable information. Any box checked must be accompanied by additional information, photos and/or documentation. 1. Property is Abutting the Shoreline 9 Proposed projeces approximate distance from shoreline (based on aerial map): 50 it.El 2. Property is Not Abutting the Shoreline Proposed project's approximate distance from shoreline (based on aerial map): 3. Additionat Information: ❑ Shoreline Change (Erosion/Accretion) Rate: ft./year (Information available here: wwwsoest.hawaii.edWcoasts/kauaicountv/KCounm.htmp ❑ Number and description of parcels (including roads, buildings, structures) between Shoreline and this parcel: -1- PLANNING DEPARTMENT • OW i.'0. :.':. ® Topography {undulating, flat, slope, etc.) and ground elevation � Shoreline type (e.g, beach, dune, rocky, sandy with ❑ Artificially armored Shoreline ❑ If checked, what type of armoring (e.g, seawall, revetment, bulkhead): ❑ Is the armoring permittedlauthorized? ❑ Date of authorization (attach copy of authorization letter): ® Is property in coastal floodplain (if checked, what zone)? See FHAT and LOAM attached ❑ Has this property been subject to coastal hazards (i.e. flooding erosion, tsunami, etc.) in tl: PLEASE NOTE: Any misrepresentation of information in this shoreline setback application will result in revocation of this determination and may result in fines and criminal prosecution, Appincant's Signature Signature V "'__ Date Aonlicahility ago ;e ceinole2ed La P;=znnlme , Setback Determination necessary. Requirements of Ordinance No. 979 aze applicable. ❑ Setback er ination is NOT necessary. Requirements of Ordinance No. 979 are not applicable, Date -2- srm PLANNING DEPARTMENT XJi i SHORELINE SETBACK DETERMINAnm If Part A has been deemed that a Determination will be necessary, the additional information will berequired for submission of this application Part B A non-refundable processing fee of one hundred dollars (S100.00) shall accompany a request for determination. (§8-27.8(e)) ® An aerial map/image (ex. Google Maps or Google Furth) with a line dmwn from the shorelinelvegetation line (approximate shoreline) to the proposed project and the calculated distance in feet ® A detailed Plot Plan to scale with all existing and proposed structures including driveways, visible lot coverage, setbacks andmeasurement details, fences, gates, and walls, etc. Building Permit Number (If building plans submitted) Eaemp6on Determination ® Exemption 1 In cases where the proposed structure or subdivision satisfies the following four criteria: (A) In cases where the proposed structure or subdivision is located outside of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) `V' or WE' flood zones; (B) The proposed structure or subdivision is located at anelevation which is thirty (30) feet above sea level or greater, (C) The applicant can demonstrate to the satisfaction of the Planning Director that the property is clearly adjacent to a rocky shoreline and that it will not affect or be affected by coastal erosion or hazards; and (D) The shoreline setback shall be sixty (60) feet from the certified shoreline which has been established not more than twelve (12) months from the date ofthe application for the exception under this section. ❑ Exemption 2 In cases where the applicant can demonstrate to the satisfaction ofdae Planning Director that the applicant's proposed structure or subdivision will not affect beach processes, impact publicbeach access, or be affected by or contribute to coastal erosion or hazards, excluding natural disasters. Factors to be considered shall include, but not be limited to, proximity to the shoreline, topography, properties between shoreline and applicant's property, elevation, and thehistory of coastal hazards in the area. Exemption3 Those structures and uses found exempt in Table 3 (§8-27.7) including repairs and renovations that DO NOT enlarge or Wanda nonconforming structure. (see pg. 7) ® Letter from the Department of Public Works statingthatthe proposed project does not constitute "Substantial Improvement," pursuamto §8-27.2 (If applicable, will requirevahnnion of project) ❑ Pursuant t0 §8-27.3 theKaua`i County Code, 1987 as amended, the Plamdng Department hereby certifies the proposed structuee(s) or subdivisions) as exempt from those shoreline setback determinationrequirem®ts established under §8-27.8. Pur tto §8 27.7 the KauaS County Code, t987 as amended, the proposed strucbre(s) is pennittedwithin the shoreline se ark While ex those shoreline setback detormination requirements estab@shed under§8-27.8, the pos stnrcune(s)i s j to the°�n`of§8-27.7(b). (Sea pg. 8) -3- vznr `` =»'h' ��®od �az�rd t�ssessrne�4 Rep®r# / Tn� � `. www.hawaimflP.org Property information (Votes: county: KAUAI TMK NO: (4) 2-M 9:004 WATERSHED. WAIKOMD PARCELADORE55: 1775 PEE RD KOLOA, In 96756 Flood Hazard informat's®n FIRM INOIX DATE NUVEMBER26, 2010 LETTER OF MAP CHANGE(S): 13-03-2553A FEMA FIRM PANEL: 150DO20352F PANEL EFFECTIVE DATE: NOVEMBER26,2010 THIS PROPERTY IS WDMN ATSUNAMI EVACUTION ZDNE: YE5 FOR MORE INFO, VISIT: tM1tp://www.scd.M1mvaii.gov/ THIS FOR MORE INFO,r VISI T- http://dlnreng.hawarvgo /dam/ 0 100 200ft o I Y `t% 1 1 dP 1 e( /f e po. n TVp,qJr I ru tj y u rt tic d ,t eel. lR rEicer.. or' nl �t:'_ C _ �,1nt moY Y : au f .Yon. (tn;s nos dem:Geatne: vs 'P`;E.IraW.'+3y o' ease nrao thnf it b; in0 yrmtld=C ra :'nrcntion pu;;!esas I au -Y fla^dpioin aruyet�oh Poc.._unsdererminv ticn. fa by asnr=ot cunlGiiaJ[e with;urel/loodgluin ma u0e�meri renu;nito% m I ,1 SPECIAL FLOOD FVVZARD AREAS (MHAS) SUBJECT TO INUNDATION By THE 1% ANNUAL CHANCE FLOOD - The 1% annual Chance Rood (100- yMr), also know Be the base food, Is the flood that has a 1% chance of being equaled or exceeded in any gluen year. SFHAs include Zone A, Ads AH, AO, V, and VE. The Base Flood Elevation (ME) is the water surface elevation of the 1% annual cbanee flood. Mandatory good insurance purchase appliesln these zones: Zane A: No ME determined. !•A Zone AE: RFE determined. Zane AH: Flood depths of Ito 3feet(usuatlyareet of ponding); az BEE determined. Zone AD: Flood depths of 1 to 3 feet (usually sheet flow on sloping cartoon); average depths determined. Zane v: Coastal flood zone with velocity hazard (wave action); —77 MBFEdetermined. Zone w-- Coastal flood with velocity hazard (wave anion); BFEdetermined. Zaret AEF Roadway aIn Zone AE. The floodway is the channel of stream Plusadjacent00oAplain areas that most be kept free of encroent so that the 1% annual chance Food can be carried wain ,gthe are. NON -SPECIAL FLOOD HAZARD ARAn area in a low-toanoderate risk Rood zone. No mandatary IIaoJ insurance urchas menu apply, It caverasetzavailabla in pathacommunide.r� ;h��s Zone its (K shaded).-Areasf D.2%annual chance floods areas of 1% annual chance flooh average depths of less than I footr with drainage aress than 1 square mile; and areasprotected by leveerbaa nual chance Rood.zoneX:Areasdetermo he outside thea.2%annual chancefloodplain.THERFLOOOARG SZane . - o: Unsaraled a.vhere Rood hazaNs are vndeter mined, but floodIng's possthie. No mandatory Rood insurance purchase apply, but coverage it avalWble in participating commu- ufes Page d of 2 Date: September 12, 2013 Case No.: 13-09-2553A LOMR-VZ Federal Emergency Management Agency Washington, D.C. 20472 1gND SEG LETTER OF MAP REVISION - COASTAL HIGH HAZARD AREA DETERMINATION DOCUMENT (REMOVAL) COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION Buildings A, B. and C, Poipu Shores, as described in the Restated Declaration of Condominium Property Regime recorded as Document No. Kauai County, Hawaii 96-108795, in the Office of the Bureau of Conveyances, Kauai County, Areas) Hawaii COMMUNITY(Unincorporated COMMUNITY NO: 150002 NUMBER: 1500020352F AFFECTED MAP PANEL DATE: 11/26/2010 APPROXIMATE LATITUDE & LONGITUDE OF PROPERTY: 21A71, 459.448 FLOODING SOURCE: PACIFIC OCEAN SOURCE OF LAT 9. LONG: GOOGLE EARTH PRO DATUM: MAD 83 DETERMINATION OUTCOME 1% ANNUAL LOWEST LOWEST LOT BLOCKI SUBDIVISION WHAT IS STREET REMOVED FLOOD CHANCE ZONE FLOOD ADJACENT GRADE LOT ELEVATION SECTION FROM THE ELEVATION ELEVATION (LTD) SFHA (LTD) (LTD) 1775 Pee Road Structure X (shaded) 24.0 fleet 26.4 feet — (Building A) Special Flood Hazard Area (SFHA)—The SERA is an area that would be inundated by the flood having a 1-percent chance of being equated or exceeded in any given year (base flood). ADDITIONAL CONSIDERATIONS (Please refer to the appropriate section on Attachment 1 for the additional considerations listed below) ZONE PORTIONS REMAIN IN SFHA DETERMINATION DOCUMENT TABLE CONTINUED This document provides the Federal Emergency Management Agencys detenninalion regarding a request for a Letter of Map Revision for the property described above. Using the information submitted and the effective National Flood Insurance Program (NEIP) map, we deterritmed that the structures]ayn the propertyIs/are not located in a Coastal Wish Hazard Area or the SFHA, an area inundated by the flood having a 1-percent chance of being equaletlexceeded in any given year (base flood). This document revises the effective NFIP map to remove the subject property from the Coastal High Hazard and the SFHA located on the effective NFIP map, therefore, the federal mandatory flood insurance requirement does notapply. However, the lender h the option to continue the flood insurance requirement to protect its financial risk on the loan. A Preferred Risk Policy (PRP) is available for buildings located outside the SFHA. Information about the.PRP and how one can apply is enclosed. This deternimaBon is based on the flood data presently available. The enclosed documents provide additional information regarding this determinatlon- If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-077338-2627 (FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 223044605. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration Page 2 of 2 .Date: September 12, 2013 Case No.: 1&DS-2553A LOMR-VZ j Federal Emergency Management Agency a Washington, D-C. 20472 rrdNo sE'oJ LETTER OF MAP REVISION - COASTAL HIGH HAZARD AREA DETERMINATION DOCUMENT (REMOVAL) ATTACHMENT I (ADDITIONAL CONSIDERATIONS) OUTCOME t%ANNUAL LOWEST LOWEST BLOCK! WHATleFLOOD CHANCE ADJACENT LOT LOT SECTION SUBDIVISION STREET REMOVED ZONE FLOOD GRADE ELEVATION FROM THE ELEVATION ELEVATION (LTD) SFHA (LTD) (LTD) Potpu Shores 1775 Pee Road Structure X (shaded) 24.0 feet 28.5 feet — Buildin B Poipu Shores 1775 Pee Road Structure X (shaded) 24.0 feet 44.2 feet — (Building C ZONE V (This Additional Consideration applies to the preceding property(ies)) A portion of this property, but not the subject of the Detennination/Comment Document, is located within a Coastal High Hazard Area (Zone V, VE or V I-30). Therefore, any future construction or substantial improvement on the property remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. No construction using fill for structural support or that may increase flood damage to other property may take place in these areas. PORTIONS OF THE PROPERTY REMAIN IN THE SFHA Per of this property, but not the subject of the Determination/Comment document, may remain in the Special Flood Hazard Area. Therefore, any future construction or substantial improvement oathe property remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. This attachment provides additional information regarding this request If you have any questions aboutthis attachment, please contact the FEMA Map Information eXchange toll free at 1-877�336-2627 (FEMA MAP) or byletter addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605, r J Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration TREEEISH LLC ADAM BROWN ARCHITECT 5784 Ahakea St., Kapa'a, Kauai, Hawal`i 96746 Phone: (808) 6S2-9440 = Email: Bwaybrown@gmalLcom Bret Cook I 1775 Pe'e Rd. Poipu Shores 101C Koloa, Hi. 96756 ' March 20, 2017 Department of Planning & Building Division County of Kauai - 4444 Rice Street Uhue, Hi 96766 BUBJEC7: Agent Authorization TMK (4) 2-8-019:004 1775 Pe'e rd. Koloa, Hi. 96756 7o whom it may concern: Authorized representative pertaining to the property at the above TMK is: Adam Brown TreeFish He 5784 Ahakea St, Kapea, HI 96746 voice: 652-9440 email: bwaybrown@gmail.com _._--- Property Owner ARCHITECTURAL SERVICES •PLANS • CONSULTLN6 Bernard P. Carvalho, Jr. Mayor Wallace G. Rczentes, Jr. Managing Director DEPARTMENT OF PUBLIC WORKS County of Kauai, State of Hawaii 4444 Rice Street, Suite 275, LShu' e, I-IawaN 96766 TEL (808) 241.4992 FAX (808) 2rn-6604 Tune 23 2017 Adam Brown 5784 Ahalcea St Kapa`a, HI 96746 Lyle Tabata Acting County Engineer Subject: SHORELINE SETBACK APPLICATION SUBSTANTIAL IMPROVEMENT DETERMINATION BRET COOK —INTERIOR RENOVATIONS TO UNIT #101 (BUILDING C) TMK4.(4) 24-019:004-0035 Dear Mr. Brown; The Kauai County Shoreline Setback and Coastal Protection Ordinance (Ordinance No. 979) Section 8-27.2 defines substantial improvement as "any cumulative series of repairs, reconstruction, improvements, or additions to a structure over a ten (10) year period, where the cumulative cost equals or exceeds fifty percent (50%) of the market value of the structure before the start of construction of the first improvement during that ten (10) year period. For the purposes of this definition, substantial improvement is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure." The Departrrrent of Public Works (DPW) Engineering Division has reviewed the proposed interior renovations to the existing structure. DPW has detemrined that the proposed improvements do not constitute a substantial improvement. A summary of the calculations follows. Market Yulue There were three building permits approved for the structure within the past ten years. The first building permit, BP 07-2261 was approved in 2007. Therefore, the market value used in.the calculations is the year 2007 Replacement Cost New Less Depreciation (RCNLD) value for the structure as determined by the County's Real Property Assessment Division. The 2007 RCNLD was determined to be $5,366,500 for Building C. If the owner chooses to dispute this value, then an appraisal of the structure must be provided at the owner's expense. The appraisal shall be prepared by a professional appraiser licensed in the State of Hawaii and the market value shall be based on the "Cost Approach" (or Replacement Cost New Less Depreciation). An Egaial OpporCunity Employer Bret Cook (Po`ipu Shores) Shoreline Setback Application — Substantial Improvement Determination. 1Lille 2, 2017 Cost oflmprovements The cost of past building permits is taken to be the valuation shown in DPW Building Division records. Building Division estimated the current construction cost for the interior renovations to be $120,000. The total cost is summarized as follows for the past 10 years BP 08-0428 $15,000 -------------------------------- j BP 1&0923 $54,139 --------------------------- j BP 17-1152 (CURRENT) $120,000 j ----------------------------, j TOTAL $191,539 ------------------------------------------------- Summary The cost of improvements compared to the market value is: Cost of Improvements (past 10 years): $191, 539 Market Value (Real Property): $5,366,500 — 0,03569 or 3.57% Since the total cost does not exceed 50% of the market value, the improvement is not considered to be substantial. Based on our records there were no other permits for the structure within the past ten years. However, if any unpermitted work has been done, or if there are modifications to this application, our determination shall be considered void and the structure must be re- evaluated. If you have any questions or need additional information, contact Stanford Iwamoto at (808) 241-4896 or siwamoto(a�kauai.gov. Sincerely, MICHAEL MOULE, P.E. Chief, Engineering Division sysv Copy: Association of Apartment Owners — Po'ipn Shores Design and Permitting Planning