HomeMy WebLinkAboutFY 2020 Budget Presentation (Department of Public Works)1.
DEP AR TM ENT OF PUBLIC WORKS
THE C OU NT Y OF K AU A ' I
LYL E TABATA
DE P UTY COUNTY ENGINEER
DEREK S. K. KAWAKAMI, MAY OR
MICHA EL A. D A HILIG, MANAGING DI RECTOR
ADMINISTRATION DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 $+I -% +I-
Salary and Wages 575,264 597,852 22,588 3 .9%
Benefits 240 ,908 340, 188 99,280 41.2%
Utilities 0 0 0 0.0%
Vehicle/Equip , Lease 0 0 0 0 .0%
Operations 91 ,048 91,049 1 0.0%
907 ,220 1,029 ,089 121 ,869 13.4%
FY 2019 Operating Budget FY 2020 Operating Budget
500,000
400,000
300,000
200,000
100,000
0
•Salary and
Wages
• Benefits
•Utilities
0% 0% •Salary and
Wages
• Benefits
•Utilities
FY 2019 and FY 2020 Comparison
Salary and
Wages
Benefits Utilities
www.k au ai.gov
Vehicle/Equip , Operations
Lease
4444 Ri ce Street Suite 275 • Llhu'e, H awai'i 96766 • (808) 241-4992 (b) • (808) 241-6604 (f )
An Equ al Opportunity Employer
FY 2020
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
The Public Works administration budget has seen no major variances in its
operating budget.
The budgets which follow that do show major changes are in Roads Division with
the GET surcharge funds to perform road resurfacing and bridge repairs , there is
a half years funding which was included in 2019 and a full years funding planned
for 2020 FY. Further increases to Solid Waste Management and to Wastewater
Management are significant toward meeting our regulatory needs of these
Divisions while we keep pace of the aging infrastructure.
3. OPERATIONAL CHALLENGES
The administration continues to support the six Divisions of Public Works through
the means of servant leadership for the planning, coordination and delivery of the
Health and Safety needs of our Community infrastructure and services.
4. TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
1. Completion of the Final Environmental Impact Statement (FEIS) for the New
Landfill at Maalo.
2. Recovery efforts from the April 2018 record rainfall event has required a large
portion of the department's efforts of the Divisions of Roads, Engineering and
Solid Waste in order to meet the needs of our community and to recover
maximum of 75% of our reimbursable costs from FEMA.
3. Rehabilitation of Pua Nani street storm drain which has been a problem for
over 8 years.
2
1.
FISCAL DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 $+I -% +I-
Salary and Wages 217 ,254 231,396 14, 142 6 .5%
Benefits 113 ,568 134,436 20 ,868 18.4%
Utilities 1,200 1,200 0 0.0%
Vehicle/Equip , Lease 0 0 0 0 .0%
Operations 9 ,003 10,004 1,001 11 .1%
341 ,025 377,036 36,011 10.6%
FY 2019 Operating Budget FY 2020 Operating Budget
0% 3%
0% •Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip,
Lease
•Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip
, Lease
FY 2019 and FY 2020 Comparison
150,000
100,000
50,000
0
Salary and
Wages
Benefits Utilities
3
Vehicle/Equip , Operations
Lease
FY 2019
FY 2020
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
Increased Budget for supplies due to costs increase and demand increase.
3. OPERATIONAL CHALLENGES
4. HIGHLIGHTS FROM FY19
4
1.
BUILDING DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 $+I -% +I-
Salary and Wages 1,250,434 1,260,642 10,208 0 .8%
Benefits 676 ,615 798,485 121,870 18 .0%
Ut ilities 1,316,501 1,321 ,751 5,250 0.4%
Vehicle/Equip , Lease 0 0 0 0 .0%
Operations 54,984 54,984 Q 0 .0%
3 ,298,534 3,435 ,862 137,328 4.2%
FY 2019 Operating Budget FY 2020 Operating Budget
•Salary and
Wages
•Benefits
•Utilities
•Salary and
Wages
•Benefits
•Utilities
•Vehicle/Equip,
Lease
•Vehicle/Equip
, Lease
1,000,000
800,000
600,000
400,000
200,000
0
FY 2019 and FY 2020 Comparison
Salary and
Wages
Benefits
5
Utilities Vehicle/Equip , Operations
Lease
FY 2019
FY 2020
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
None.
3. OPERATIONAL CHALLENGES
Part of the responsibility for Building Division is permitting and code enforcement.
In order to provide accurate and efficient service we need to have fully staffed,
well-trained personnel. Our intent for FY2020 was to move two positions
(Building Permit Clerk and Supervising Plans Examiner) from the Revolving Fund
to the General Fund. Since this request was denied it limits our capability of
increasing staff to address the growing number of building, plumbing, electrical,
and sign violation complaints our office receives weekly. As codes change and
are updated to reflect new technology, methods and materials our plans
examiners and field inspectors need training in order to effectively apply new
codes. Budget constraints limit our training opportunities.
4. TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
1. Started construction of the Lihue Town Core Mobility & Revitalization Project
(TIGER).
2. Successfully adopted the 2015 International Energy Conservation Code.
3. Will complete the construction of the Adolescent Treatment and Healing
Center.
6
ENGINEERING DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
1. FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019
Salary and Wages 1,115,191
Benefits 516,066
Utilities 0
Vehicle/Equip, Lease 0
Operations 79,971
1,711,228
FY 2020 Operating Budget
0% 6% •Salary and
Wages
• Benefits
•Utilities
FY 2020 ~+I -0/o +I -
1,128,388 13,197 1.2%
641,722 125,656 24.3%
0 0 0.0%
0 0 0.0%
109,971 30,000 37.5%
1,880,081 168,853 9.9%
FY 2019 Operating Budget
•Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip,
Lease
•Vehicle/Equip
, Lease
1,000,000
800,000
600,000
400,000
200,000
0
FY 2019 and FY 2020 Comparison
Salary and
Wages
Benefits
7
Utilities Vehicle/Equip, Operations
Lease
FY 2019
FY 2020
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
The proposed budget for Engineering Division includes an increase from $43,500
to $63,500 for the Other Services budget line item. This change is to increase the
"Surveying Cost" portion of this account from $30 ,000 to $50,000. The County of
Kaua'i has not been able to find a qualified County Surveyor since 2015, when
the former County Surveyor retired. In January 2018, the County executed a
contract with Esaki Surveying and Mapping, Inc . to provide land surveying
services on a contract basis. This contract is being successfully used to provide
surveying services for various Divisions of Public Works as well as other
departments. There is currently a backlog of project assignments for the contract
surveyor, in part due to limitations on funding available each fiscal year.
Engineering Division is requesting additional funding for FY2020, so that we can
better ensure that all necessary project assignments can be funded and
completed.
The proposed budget for Engineering Division includes an increase from $3 ,500
to $13,500 for the Other Services budget line item. This increase is proposed to
fund the purchase a new large format scanner/plotter for Engineering Division ,
with an estimated cost of $10,000. The current plotter is a Hewlett Packard
DesignJet T1120PS that was acquired on July 2 , 2009. The existing plotter and
scanner has increasing needs for repairs, resulting in loss of productivity.
Because the plotter and scanner is 10 years old, it is increasingly difficult to find
parts for the plotter and drivers for newer computers with new technology .
Engineering Division consulted with the Information Technology Division, who
recommended that the plotter be replaced; IT also provided the estimated cost.
Engineering Division uses the large format scanner on at least a weekly basis, in
order to archive old maps electronically . Engineering Division uses the large
format plotter to print drawings for County projects. Other departments and
divisions also request scans or plots on approximately a monthly basis.
3. OPERATIONAL CHALLENGES
Engineering Division has chronic staffing challenges for Civil Engineer positions.
For several years, the Division has had difficulty recruiting adequate candidates
to Kaua'i . In 2018, all Civil Engineer positions were briefly filled. However, the
Division is also having difficulty retaining staff. Within the past year, two of the
Division 's most promising young engineers left the County to join local
contracting companies. Both engineers cited their low County salaries as the
primary or sole factor in their decisions to leave.
4. TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
8
AUTOMOTIVE DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
1. FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 i +I -% +I-
Salary and Wages 1,068,194 1,103,886 35 ,692 3.3%
Benefits 562 ,471 645,492 83,021 14.8%
Utilities 36 , 150 36 ,150 0 0.0%
Vehicle/Equip , Lease 37 , 121 84 ,698 47,577 128.2%
Operations 1,069,825 1,092,523 22,698 2 .1%
2,773,761 2 ,962 ,749 188,988 6 .8%
FY 2019 Operating Budget FY 2020 Operating Budget
•Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip,
Lease
FY 2019 and FY 2020 Comparison
•Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip ,
Lease
1,200,000 -r--------------------------,
1,000,000
800,000
600,000
400,000
200,000
0
Salary and
Wages
Benefits Utilities Vehicle/Equip, Operations
Lease
9
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
None.
3. OPERATIONAL CHALLENGES
The Automotive Division continues the ongoing battle with spatial issues due to an
increasing fleet and lack of operational area for repairs.
The story remains the same -not enough space to perform repairs on equipment
and lack of space to use as staging areas for vehicles and equipment waiting to be
repaired.
4. HIGHLIGHTS FROM FY19
The Automotive Division continues to update and improve the ever aging County of
vehicle and equipment fleet.
10
1.
ROADS DIVISION
FY 2020 BUDGET ANP OPERATIONS SYNOPSIS
FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 ~+I -% +I-
Salary and Wages 5,265 ,592 5 ,368 ,348 102,756 2 .0%
Benefits 2,759 ,608 3 , 135, 128 375,520 13.6%
Utilities 581,930 583,430 1,500 0.3%
Vehicle/Equip , Lease 769,559 1,446,275 676 ,716 87.9%
Operations 4,370,588 3,544,175 -826,413 -18 .9%
13,747,277 14,077,356 330,079 2.4%
FY 2019 Operating Budget
•Salary and
Wages
•Benefits
•Utilities
•Vehicle/Equip,
Lease
FY 2020 Operating Budget
•Salary and
Wages
•Benefits
•Utilities
• Vehicle/Equi
p, Lease
FY 2019 and FY 2020 Comparison
6,000,000 ~----------------------~
5,000,000
4,000,000
3,000,000
2,000,000
1,000,000
0
Salary and
Wages
Benefits Utilities Vehicle/Equip, Operations
Lease
11
-FY 2019
FY 2020
2 . MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
None.
3. OPERATIONAL CHALLENGES
• Overgrown vegetation including trees from private property
o DPW Roads -needs a mechanism to back charge private land owners
if they do not take care of their vegetation encroach ing in the County
road right -of-way.
• Potholes and utility excavations on road pavement
o All contractors cutting/trenching County road pavement need to have
road permits and have County Engineering sign-off approval of the
pavement repair .
o All County utility agencies cutting/trenching County road pavement in
the course of their operations shall send an e-mail notifying the County
Engineer and the Chief of Roads where the pavement cuts were made
so the pavement repair can be checked for satisfactory completion.
o County roads crew will undergo retraining in the proper procedure for
pothole repair.
o Roads division is crafting an open-end contract for asphalt pavement
repairs at various locations in order that the division can expeditiously
respond to emergency asphalt pavement repair.
4 . T OP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
• Response to Disaster Flooding
o Kumu Road
• Re-establish access to road, remove landslide debris and
vegetat ion
• Assist Community with the grave yard head stones
o Kepuhi Point-Temporary Dump Site
• Assist Solid Waste with removal of metals, appliances,
construction debris, and household trash
• The challenge with this was working around limited
access an weight restrictions
• Purchase of Thermoplastic Striping Equipment
o Roads Division is now able to effectively stripe roads with end
product being longer lasting than conventional paint.
• We are currently in the process of properly training our
work force on the utilization of this new equipment
• County Right of Way Maintenance Ordinance has been reviewed by the
County Attorney and Mayor. Sending to County Council has been put on hold .
This ordinance would solve the problem of vegetation from private property
encroaching and creating problems/liabilities on County Road right of way .
12
WATEWATER MANAGEMENT DIVISION
FY 2020 BUDGET AND OPERATIONS SYNOPSIS
1. FY 2019 to FY 2020 BUDGET COMPARSION
FY 2019 FY 2020 $+I -0/o + / -
Salary and Wages 2,569,954 2,630,513 60,559 2.4%
Benefits 1,361,685 1,537,322 175,637 12.9%
Utilities 1,768,000 1,838,000 70,000 4.0%
Vehicle/Equip, Lease 17,469 574,180 556,711 3186.9%
Operations 4,545.796 5.114,222 568,426 12.5%
10,262,904 11,694,237 1,431,333 13.9%
FY 2019 Operating Budget FY 2020 Operating Budget
0%
•Salary and
Wages
• Benefits
•Utilities
•Vehicle/Equip,
Lease
5%
FY 2019 and FY 2020 Comparison
•Salary and
Wages
•Benefits
•Utilities
•Vehicle/Equip ,
Lease
6,000,000 -...--------------------~
5,000,000 -!-------------------~~
4,000,000 +-----------------·J~
3,000,000 +-----------------11
2,000,000
1,000,000
0
Salary and
Wages
Benefits Utilities Vehicle/Equip, Operations
Lease
13
.FY 2019
FY 2020
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
The biggest increase in our operating budget is the result of a change in
direction to lease vehicles/equipment instead of purchasing them in full . This
approach will allow the Wastewater Management Division (Division) to purchase
more equipment and spread out the payments to better align with the revenue from
our sewer customers.
As identified in previous County Council meetings, the Division has a lot of
equipment that is either at or past its useful life and a significant investment is
required to upgrade our utility so that we can reliably treat raw wastewater to
protect the health and safety of the public and the environment.
This new approach is a big step in the right direction in order to overhaul our aging
facilities with new equipment.
3. OPERATIONAL CHALLENGES
State and Federal Regulations
Maintaining compliance with State and Federal regulations , which require
improvements to our facilities, while continually receiving and treating raw
wastewater. This requires our design consultants and contractors to develop
creative strategies and construction phasing in order to keep our facilities
operational at all times. This also requires our operators to be flexible and have a
good understanding of the treatment process .
The key regulatory-based upgrade is the abandonment of the ocean outfall at the
Wailua Wastewater Treatment Plant (WWTP). This is a result of the new
requirements provided in the National Pollutant Discharge Elimination System
(NPDES) Permit issued by the State of Hawai'i , Department of Health (DOH), Clean
Water Branch (CWB) on October 1, 2013 . The permit included effluent limitations for
Ammonia Nitrogen which would be very expensive in order to implement without
a long us to reliably meet the limits it at all . As a result , the Division has decided to
abandon the ocean outfall , promote greater use of R-2 recycled water at the Wa ilua
Golf Course and construct a new soil aquifer treatment (SAT) basin as the backup
disposal method to R-2 recycled water reuse. Overall, it is a better direction for the
County because recycled water reuse helps to offset potable water usage . However,
it is a considerable investment for the County and our sewer customers and the
progress of these upgrades needs to follow the compliance schedule identified in the
permit. Failure to do so would result in fines for the County.
14
Reusing Recycled Water in Waimea
Historically, the Waimea WWTP has provided R-2 recycled water to Kikiaola
Land Company (Kikiaola) for irrigation purposes. The Division provided this water
by pumping it to the lower of two reservoirs owned and operated by Kikiaola.
Approximately a year ago, Kikiaola informed the Division that they would be
decommissioning the two reservoirs since there were no customers using the
water and they did not want the liability of having earthen reservoirs above a
residential neighborhood and a hospital. As a result, the Division, which
previously permitted the two underground injection control (UIC) wells as backup
disposal method in the event Kikiaola was unable to accept R-2 recycled water,
was required to permit the two UIC wells as the primary and backup disposal
method. In the last year alone, the capacity of the wells degraded rapidly and we
are currently operating the wells above the permitted pressure limit. This is very
concerning and a big priority for the Division to address.
Currently , we are working with a consultant to provide bid and construction
services so that we can clean the wells and lower the operating pressure of the
wells within our permitted limits. Additionally, the Division is working with Kikiaola
to convey the two reservoirs to the County. This will require the parcel containing
the reservoirs to be subdivided since they are part of a larger parcel. If the
reservoirs are conveyed to the County , the Division will have the ability to relieve
the use of the injection wells and work with the agriculture community about
using R-2 recycled water.
The future goal of the Division is to produce R-1 recycled water as this is the
highest quality of recycled water and would allow for the most flexible use of this
valuable resource. The Waimea Athletic Field and Waimea Canyon Middle
School has been identified as the initial users of the R-1 recycled water. There
are ongoing process evaluations being performed at the Waimea WWTP in order
for to continually and reliably produce R-1 recycled water. When this is
accomplished , the lower reservoir will still be a valuable backup in order to
provide R-1 recycled water to agriculture customers since the initial customers
(County of Kaua'i, Department of Parks and Recreations and State of Hawai 'i,
Department of Education) will only use all of the recycled water during the peak
demand summer months. During the other months , there will be excess water
that should be reused for beneficial purposes instead of being disposed of in the
UIC wells.
Staffing
The Division is severely understaffed and continually stretched thin in order to be
able to reliably protect the health and environment by operating a utility that has
been neglected for years . The main areas where improvement could be made is
by adding a project manager and an electrician .
15
The Division has four people in the office , which is tasked with performing all of
the administrative duties of the Division. This includes regulatory reporting,
managing design and construction contracts , sewer billing, customer and
contractor inquiries, reviewing building permits, procuring equipment and
supporting other Divisions .
The Division has one electrician in order to support four WWTPs and 20 sewage
pump stations. This is an impossible task and as a result of the other Division
members, such as mobilizing temporary bypass pumps, we have been able to
avoid a severe raw wastewater spill due to an electrical-related issue. This is
unsustainable. Raw wastewater flows are 24/7/365 and when you consider the
vacation, sick and holidays that County employees have, we have an electrician
for approximately 56% of the year (based on calendar days) or 19% of the year
(based on hours since the electrician is not a standby employee). From a safety
aspect , there should be two electricians so that we don't have an employee going
to a pump station (which is not permanently staffed with any employees) by
himself. If anything were to happen to the electrician it could be a while before
others become aware of the issue.
The current administration has helped the Division take a big step forward by
investing in the operating and CIP budget for FY20. This is a great sign that the
administration hears and understands our needs . We will continue to have
ongoing discussions in the coming years with the administration and hopefully
one or both of the positions are provided to the Division.
Operating a Small Utility
The Division is a small utility , serving approximately 20% of the customers as
compared with the Kaua'i Department of Water (KDOW). As a result , there are
different and sometimes greater challenges when trying to efficiently and
successfully maintain and improve our facilities and our services for our
customers. The main issue with a small utility is having a small customer base.
As a result , there is a bigger impact to each customer when the Division needs to
invest in improving the utility . It is difficult for our sewer customers because it
affects our sewer rates but these investments are needed to be able to maintain
an aging utility. In addition to this, there are improvements that should be made in
order to transform the Division into a more technologically advanced utility and a
larger utility that services a greater portion of the island. By expanding the utility ,
we would reduce the number of cesspools on the island and help individual home
owners so that they aren't solely responsible for the expenses to abandon their
cesspool (all existing cesspools will be banned in 2050).
16
4. TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
The Division remains on track to meet all of the compliance milestones identified
in the Wailua WWTP NPDES permit which will ultimately result in abandonment
of the existing ocean outfall and constructing a new SAT basin for backup
disposal along with promoting additional R-2 recycled water reuse at the Wailua
Golf Course. This project, when finished , will be a major accomplishment for the
County and a big step towards promoting recycled water use.
The Division worked hard to complete a number of CIP projects. As a result ,
there will be a lot of construction projects starting in FY20 which will cost over
$24 million dollars. This includes the following projects:
• Improvements to Existing Hanama'ulu and Kapaia WWPSs
• Lihu'e WWTP Process Improvement Project
• Wailua Alternative Effluent Disposal System
• Wailua SPS 1 Renovation
• Wailua SPS 3 Rehabilitation
• 'Ele 'ele Subdivision Collection System Rehabilitation
• Hanama'ulu Sewer Collection System Rehabilitation
• Emergency Repair of Wailua Sewer Manholes
The Division continues to be able to maintain its workforce. In the last 6 years
only 2 employees have left for other opportunities. This is particularly impressive
since we are a wastewater utility and generally speaking, working for a
wastewater utility is not a field that is highly sought after. However , once our
employees understand the expertise that is needed to properly operate our
facilities and the role that they play in protecting the public and the environment ,
they gain an appreciation for the work and take a lot of pride in their job. This
also shows in the support the Division provides for other Departments/Divisions
such as the Department of Parks and Recreation and Solid Waste Division. The
Division helps to maintain the County's septic systems and supports other
pumping needs. The Division understands that by helping the other County
services , we are ultimately supporting the public and that is our primary purpose.
17
SOLIDWASTE MANAGEMENT DIVISION
FY 2020 BUDGET ANP OPERATIONS SYNOPSIS
1. FY 2019 to FY 2020 BUDGET COMPARSION
Salary and Wages
Benefits
Utilities
Vehicle/Equip, Lease
Operations
FY 2019
4,434,364
2,451,911
37,021
1,889,185
11,369,336
20,181,817
FY 2020
4,546,841
2,772,094
38,821
2,126,705
12,688,521
22,172,982
$+I -
112,477
320,183
1,800
237,520
1,319,185
1,991,165
% +/-
2.5%
13.1%
4.9%
12.6%
11.6%
9.9%
FY 2019 Operating Budget FY 2020 Operating Budget
4,000,000
2,000,000
0
•Sa lary and Wages
•Benefits
•Utilities
•Vehicle/Equip,
Lease
• Operat ions
FY 2019 and FY 2020 Comparison
.Salary and Wages Benefits Utilities
18
Ve h icle/Equi p,
Le ase
Ope ra tions
•Salary and Wages
•Benefits
•Utilities
•Veh i cle/Equip,
Lease
• Operations
FY 2019
1i1 FY2020
2. MAJOR CHANGES ANO/OR VARIANCES IN OPERATIONS BUDGET
In the past, a Procurement Specialist of Public Works Department (PWD)
provided procurement expertise and contracts management support to the Solid
Waste Division (SWD). After retirement of the former Procurement Specialist, the
PWD eliminated that position. As a result, various staff members in SWD are
managing more than 25 contracts by applying varying degrees of consistency.
Properly procuring, managing and tracking contracts by a contracts management
professional will minimize risks of negative audit findings and reduce risks of
erroneous payments. This position will be able track contracts and report
performance by developing and updating a database.
In 2019, SWD will start planning and design of Ma'alo Municipal Solid Waste
Landfill with an estimated cost of $85 million and eight years of the project
duration. Construction of a new landfill is politically high profile and willencounter
numerous risks. Successful completion of this project will require strategic
planning, timely coordination, effective communication, and seamless
orchestration of project stakeholders. In order to effectively manage the largest
project in the County of Kauai, it is important to hire a Principle Project Manager.
The primary purpose of this position is to develop, coordinate, and control the
scope, schedule, budget, and procurement. This position will be responsible for
managing project risks, coordinate communications, and ensure stakeholder
engagement. This position will be responsible for monitoring and controlling
design and construction management consultants, contractors, and other project
team members.
An additional $90K is requested for wellhead extensions at Kekaha Landfill to
continue to collect landfill gas from the final lift of the landfill. Collection and
management of landfill gas is a regulatory requirement.
An additional $200K is requested to repair electrical system and to
maintain/upgrade the blower at the Halehaka Closed Landfill gas collection
system. In 2018, the county received a construction bid which was $200K higher
than the 2019 approved funding.
The 2019 approved budget for Kekaha Landfill Scale upgrade was reduced by
$200K. The budget reduction is due to Public Works Department's decision to
repair one scale instead of replacing two old scales.
Five hundred thousand dollars is requested to transport contaminated soil from
Puhi Metals Recycling to Kekaha Landfill. This soil will be used for base material
for Kekaha Landfill Lateral Expansion project in 2019-20.
19
An additional $11 OK is requested for Greenwaste process ing . In 2019 , a new
contract will be awarded and is anticipated that the cost will be higher because of
the lack of competition from vendors and increased quantities .
An additional $112K is requested for commercial recycling. This increase is due
to the changes in global recycling market conditions.
3 . OPERATIONAL CHALLENGES
The SWD is responsible for planning , designing , constructing , managing and
operating four Recycling and Transfer Stations (RTS), Kekaha Landfill , Halehaka
Closed Landfill, Ma'alo Municipal Solid Waste Landfill (MSWLF), and collection of
waste from the ent ire island of Kauai. Solid waste management and MSWLF are
highly regulated industry and requires careful plann ing , designing , permitting ,
monitoring , reporting, and operating . The County of Kauai rel ies mostly on the
consultants for most of the required work .
As the owner and operator of these solid waste management facilities , it is
important for the county to ensure the design , construction , operation , permitting,
and monitoring and reporting are in compliance with all applicable rules ,
regulations, and laws. In order to perform technical review , quality control,
regulatory compliance oversight , and project management , the SWD needs to be
adequately staffed. At present , SWD has one Project Assistant Position and a
Vacant Engineer -VI Position . Due to staffing shortage , projects are falling
behind schedule , consultant produced products are not adequately reviewed ,
contracts are not properly tracked , and facilities are not in compliance with t he
regu latory requi rements. Hiring eng ineers , with solid waste management
background is very difficult due to limited availabilities and the current salaries in
the market are higher than the county 's pay scale . As a result the recruitment for
Engineer-VI is taking much longer than anticipated.
In order to systematically manage the SWD work program , a comprehensive
Work Plan for 2019-20 is developed . Based on the workload ident ified in the
Work Plan , additional staffing are needed . Accordingly , requests for two new
positions for 2020 budget were submitted for consideration.
4 . TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2019
20