HomeMy WebLinkAboutNR080118DPW2BERNARD P. CARVALHO JR.
Mayor
COUNTY OF KAUA`I
DEPARTMENT OF PUBLIC WORKS
News Release
For Immediate Release: August 1, 2018
WALLACE G. REZENTES JR.
Managing Director
LYLE TABATA, ACTING COUNTY ENGINEER
Tel (808) 241-4996
Fax (808) 241-6604
Pu`uopae Bridge to be temporarily closed for construction starting Aug. 8
The public is advised that Pu`uopae Bridge in Kapa`a will be temporarily closed starting
Aug. 8 in preparation for construction of the new Pu`uopae Bridge.
Located by the intersection of Kipapa Road and Pu`uopae Road, the bridge will be
closed on weekdays, from 8 a.m. to 3:30 p.m.
An alternative route is shown in a map below. Motorists should drive with caution, expect
delays, and adjust their travel times as needed.
The bridge will be fully closed when construction begins and an announcement will be
made once that date is determined.
For more information, you may call Drayko Construction, Inc. at 808-256-4591.
!i■ � � 0/ C)N�Nq Rb
'tPitaa kn !' -
�
Project Location r
j! Puuopoe Brid e ■ _
_ I
40,
■
---- / tea' � � •: �P -
i 1p
ma