Loading...
HomeMy WebLinkAboutNR101018DPWBERNARD P. CARVALHO JR. Mayor COUNTY OF KAUA`I DEPARTMENT OF PUBLIC WORKS News Release For Immediate Release: October 10, 2018 WALLACE G. REZENTES JR. Managing Director LYLE TABATA, ACTING COUNTY ENGINEER Tel (808) 241-4996 Fax (808) 241-6604 Pu`uopae Bridge to be temporarily closed for construction from Oct. 15 to 19; full closure estimated to last from Oct. 22 through June 2019 The public is advised that Pu`uopae Bridge in Wailua Homesteads will be temporarily closed starting Oct. 15 through Oct. 19 in preparation for construction of the new Pu`uopae Bridge. A full closure of the bridge will begin Oct. 22 and is estimated to last through June, 2019. Located by the intersection of Kipapa Road and Pu`uopae Road, the bridge will be temporarily closed to allow a safe working environment as crews will install temporary waterline supports and additional supports on the bridge in preparation for demolition. Full closure of the bridge will allow crews to remove the existing bridge deck, relocate the Department of Water waterline, and construct the new Pu`uopae Bridge — which is expected to be in service sometime around June 2019. An alternative route is shown in a map below. Motorists should drive with caution, expect delays, and adjust their travel times as needed. For more information, you may call Drayko Construction, Inc. at 808-256-4591. !i■ � � 0/ C)N�Nq Rb 'tPitaa kn !' - � Project Location r j! Puuopoe Brid e ■ _ _ I 40, ■ ---- / tea' � � •: �P - i 1p ma