HomeMy WebLinkAboutFY 2022 Budget Presentation (Department of Public Works)DEPARTMENT OF PUBLIC WORKS
FY 2022 BUDGET AND OPERATIONS SYNOPSIS
Troy Tanigawa
Acting County Engineer
1. FY 2021 to FY 2022 BUDGET COMPARSION
Fund(s): GENERAL FUNDS
Department: PUBLIC WORKS
FY 2021
FY 2022
$ + f -
0/0 + / -
Salary and Wages
3,1321,888
3,2137,768
185,88D
6.2%
Benefits
1,756,283
1,782,756
26,473
1.5%
Utilities
1,321,751
1,24D,824
-8D,927
-6.1%
Vehicle/Equip, Lease
D
D
D
D.D%
Operations
212,656
199,787
-12,869
-6.1%
6,312,578
6,431,135
118,557
1.9%
FY 2020 Operating Budget
■ Salary and Wages
■ Benefits
All ■ Utilities
■ Vehicle/Equip,
Lease
■ Operations
FY 2021 Operating Budget
ss�
0% ■Salary and Wages
■ Benefits
■ Utilities
■ VehirlefEquip,
Lease
■ Operations
FY 2019 and FY 2020 Comparison
3,500,000
3,DDD,C00
2,500, C00
z,aaa,oao
■ FY 2021
1,500, 000 ■ FY 2022
1,000, 000
500,000
a
Salary and Wages Benefits Utilities Vehicle/Equip, Operations
Lease
1
Fund(s): SOLID WASTE FUND
Department: PUBLIC WORKS
FY 2021 FY 2022 $ + f - 010 + / -
5alary and Wages 4,717,273 4,682,879-34,394 -4.7%
Benefits 2,916,624 2,945,318 28,694 1.D%
Utilities 38,821 92,731 53,91a 138.9%
Vehicle/Equip, Lease 2,669,445 2,447,641-221,804 -8.3%
_ Operations 11,540,238 11,967,868 427,630 3.7%
21,882,401 22,135,437 254,036 1.2%
FY 2020 Operating Budget FY 2021 Operating Budget
■ Salary and Wages ■ Salary and Wages
■ Benefits ■ Benefits
AUtilities Utilities
■ Vehicle/Equip, ■ Vehicle/Equip,
pyr, Lease1y6 Lease
■ Operations ■ Operations
FY 2019 and FY 2020 Comparison
i4,uuu,uuu
12,000,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000, 000
0
Salary and Wages Benefits Utilities Vehicle/Equip, Operations
Lease
■ FY 2021
■ FY 2022
2
Fund(s): SEINER FUND
Department: PUBLIC WORKS
FY 2021
FY 2022 $ + f -
ofo + f -
Salary and Wages
2,757,121
2,799,618 42,497
1.5%
Benefits
1,658,854
1,726,591 67,737
4.1%
Utilities
1,838,000
1,712,DDD-126,DDD
-6.9%
Vehicle/Equip, Lease
569,181
569,181 D
D.D%
Operations
5,461,664
5,61D,DDD 128,336
2.3%
12,3D4,82D
12,417,39D 112,57D
D,9%
FY 2020 Operating
Budget
FY 2021 Operating Budget
■ Salary and Wages
■Salary and Wages
bvb6
■ Benefits
■ Benefits
4596
■ Utilities
45%
i
■ Utilities
■ Vehicle/Equip,
hv�'
■ Vehicle{Equip,
Lease
Lease
5%
■ Operations
5%
■ Operations
FY 2019 and FY 2020 Comparison
�,QQQ,QaQ
�,QQQ,QQQ
a,QQQ,QQQ
3 QQQ QQQ
■ F'f 2Q21
■ F'f 2Q22
2,QQQ,CQQ
1,QQQ,QQQ
0
Salary and Wages
Benefits Utilities VehiclejEquip, Operations
Lease
Fund: HIGHWAY FUND
Dwaltment: PUBLIC WORKS
FY 2021
FY 2022
$+J-
0/0+1 -
Salary and Wages
5,475,968
5,018,242
-457,726
-8.4%
Benefits
3,247,963
3,067,754
-180,209
-5.5%
Utilities
584,63D
584,63D
D
D.D%
Vehicle/Equip, Lease
1,332,136
1,3D6,444
-23,692
-1.8%
Operations
5,DD2,978
3,755,976
-1,247,DD2
-24.9%
15,643,675
13,735,D46
-1,908,629
-12.2%
FY 2021 Operating Budget
■ Salary and Wages
■ Benefits
3296
Utilities
■ Vehicle f Equip,
21% Lease
4? ■ Operations
6,000, 000
5,000, 000
4,000, 000
3,000, 000
1,000, 000
FY 2022 Operating Budget
■ Salary and Wages
4■ Benefits
- Utilities
■ Vehicle/Equip,
Lease
4%
■ Operations
FY 2021 and FY 2022 Comparison
d
Salary and Wages Benefits
Utilities Vehicle/Equip, Operations
Lease
■ FY 2021
■ FY 2022
4
Fund: G.E. Tax FUND
Department: PUBLIC WORKS
FY 2021
FY 2022 $ + 1 -
010 + f -
Salary and Wages
189,535
129,841-59,694
-31.5%
Benefits
96,612
77,317-19,295
-20.0%
Utilities
0
0 0
0.0%
Vehicle/Equip, Lease
1
1 0
0.0%
Operations
13,137,880
17,096,007 3,958,127
30.1%
13,424,028
17,303,165 3,879,138
28.9%
FY 2021 Operating
Budget:
FY 2022 Operating Budget
■ Salary and Wages
MM'u
■ Salary and Wages
■ BenefitsAN*U6
■ Benefits
■ Utilities
— Utilities
■ Vehicle)Equip,
■ Vehicle/Equip,
Lease
99%
Lease
■ Operations
■ operations
FY 2021 and FY 2022 Comparison
1a,000,000
i6,000,000
14,OB0,000
12,0a0,000
10,000,000
8,000, 000
6,000, 000
4,000, 000
2,000,000
0
Salary and Wages
Benefits Utilities Vehicle/Equip, Operations
Lease
2. MAJOR CHANGES AND/OR VARIANCES IN OPERATIONS BUDGET
General Fund
The current budget reflects a significant variance in salary, wages, and benefits. This variance is a
result of a reorganization —the transfer of three positions from other Departments and Divisions.
This restructuring will provide a framework for greater capability on a Division -level to manage
existing inventory of County assets (i.e. roads, easements, etc.), identify necessary maintenance
projects and corresponding methods, and prioritization of available funding to systematically
implement those projects. Leadership will also focus on measures to improve the way business is
conducted and accountability including but not limited to: 1) Develop/update legislation such as
those to improve management of right of way issues, and 2) Implementation of policies and
protocols for project inspection to promote consistent specification enforcement and a level
playing field for outsourced services and construction projects.
Caviar Fnnri
The current budget reflects a decrease in electricity of $100,000 and an increase of—$369,000
Contractual Repairs for replacing hardware and software for Division's Supervisory Control and
Data Acquisition (SCADA) system. The SCADA system allows for automation of facilities and
remote monitoring and controlling.
Solid Waste
An additional $847,300 is requested for the closure of Kekaha Landfill Phase II. This fund assures
that we will have ample funds to properly close Kekaha Landfill Phase II when it reaches capacity,
projected in June of 2027. At the end of life, Kekaha Phase II is required to be closed according to
EPA requirements within 30 days. Adequate funds must be available to develop the final cover
design and install the final cover system per EPA and State requirements.
An additional $645,455 is requested in line item Loans: 208-2031-641.44-00. The increase is
requested for repayment of State Revolving Fund (SRF) loan obligations. We anticipate an
additional $100,000 will be needed for our upcoming loan repayment for the Refuse Transfer
Station (RTS) Upgrades for a total of $775,242.
The increase of $120,000 in Recycling / Other Services: 208-2033-641.30-00 reflects the new AV
Residential Vehicle Pickup Program. This program was identified as part of the Mayor's
Abandoned Vehicle Task force as a means for addressing part of the abandoned vehicle problem
on Kauai.
Halehaka GCCS Repairs: This current FY 2021 Budget line item of $520,000 will not need to be
funded in FY 2022 as this project will be encumbered in this fiscal year.
The current FY2021 budget item of $500,000 for Haul Soil from Puhi Metals Recycling Center will
not need funding in FY2022 as this phase of the work is complete.
Highway Fund
The current budget reflects a decrease in salary, wages, and benefits as a result of the
reorganization noted in the "General Fund" item above.
N.
G.E.T. Fund
The current budget reflects a decrease in salary, wages, and benefits as a result of the
reorganization noted in the "General Fund" item above.
3. OPERATIONAL CHALLENGES
General Fund
The retirement of several upper level engineers in management positions coupled with continuing
difficulties in filling vacancies for engineering positions has left large voids for the Department to
fill. The solution to provide shortage differential pay is helpful, but has not been enough to
eliminate the hiring challenges.
Sewer Fund
An increasing number of regulatory requirements coupled with aging facilities places a strain on
the limited staff.
cnlirl \A/acto
Much like other divisions, we have experienced challenges in filling engineering positions. The
vacancies have resulted in administrative overtime and have limited the Division's capacity to be
proactive with operational and regulatory items.
G.E.T. Fund
Vacancies due to retirement/resignation and challenges in recruiting continue to place a strain on
operations.
Highway Fund
Implementing operations for clearing overgrown vegetation and trees from private property is a
strain to our budget. A mechanism to charge private landowners should be considered.
4. TOP 3 OPERATIONAL HIGHLIGHTS FROM FY 2021
r,anarnl Fiinrl
• We have been able to maintain customer service in spite the impacts of Covid-19.
• Substantially completed the Lihue Town Core Mobility & Revitalization Project.
r%P%A/ar Flinn
• We were able to perform a lot of proactive sewer line cleaning due to the less traffic on
the highways.
• We are nearing the completion of improvements to the Hanamalu and Kapaia
Wastewater Pump Stations. This project upgraded the two pup stations to address older
equipment and allow for higher flows.
Cnlirl \A/acts
• This was the first full year that the County managed the landfill without a contract with
Waste Management. Although challenges due exist, morale is high.
• All solid waste collection, transfer, disposal, and recycling services remained active thru
the height of the Covid-19 pandemic.
• Completed Kekaha Landfill Expansion of Cell #2.
G.E.T. Fund
• Completion/Near completion of Opaekaa Bridge, and Maluhia/Koloa Road projects.
• Completion/Near completion of 139 lane miles of the GET Road Maintenance and
Preservation program.
Highway Fund
• Repaired the Hanapepe Swinging Bridge that was damaged during flooding of December
2019.
• Successfully responded to flooding event of March 2020.
E: