HomeMy WebLinkAboutFY 2022 (CIP Projects)County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Construct new seawall and The design contract was amended to include the new erosion Aliomanu Road associated roadway improvements. W18012 Engineering Bond-BAB $ 101,431 $ 66,425 $ 35,006 Donald F. area due to additional storm activity. Additional revetment $ 35,006 work will be done to protect the single traffic lane remaining. 800 MHz Radio System Upgrade 1st responder radios X14001 KEMA Bond LThu`e $ 27,256 $ 27,256 David M. Project is complete. Balance of funds is being transferred to $ (27,256) $ - Upgrade Phase II new FY2021 CIP project, BMPs at RTS Islandwide. Adolescent Treatment & Development of a treatment and healing land donated by M18001 Building Bond-BAB LThu`e 26,599 Doug H. Project is complete. Balance of funds is being transferred to $ Healing Center center on $ - $ new FY2021 CIP project, BMPs at RTS Islandwide. (26,599) $ - Grove Farm in Kapahi. Project complete. Remaining funds will be used to support the Project to support County's purchase of diesel emission capturing equipment that is Alternate Energy Projects alternate energy initiatives. D10106 OED Bond-BAB Lihu`e $ 45,415 $ 45,415 Ben mounted on the fire trucks. The initial purchase will be for the $ (45,415) $ - truck located at the Kalakea station north of Kapaa. This is a safety initiative to protect the health of the firefighters. Anini Bridge Replacement Project to replace dilapidated one- Temporary bridge is in place. STIP funds are limited and (County Match) lane bridge on Anini Road near the W14001 Engineering Bond-BAB Hanalei $ 1,354 $ 1,354 Troy T. prioritized to other projects. This project will be undertaken $ 1,354 park. STIP project once STIP funding becomes available. Project involves installation of a Auto Shop Improvements mezzanine floor for storage of tools W13005 Building/Auto Bond-BAB L7hu`e $ 345,668 $ 330,672 $ 14,996 Doug H. Project is complete. Close out is in progress. $ 14,996 and equipment. Project to perform bridge The County is required to inspect all FHWA bridges. This fund Biennial Bridge Inspections inspections at all County bridges W96388 Engineering Bond Islandwide $ 27,912 $ 20,000 $ 7,912 Donald F. request is for the consultant services to perform the bridge $ 7,912 (County Match) over 20 ft. in length every two inspections and perform certain repairs. Contract amendment years. was executed and inspections in process. Project is to incorporate the newly acquired parcels (Hodges, Black Pot Improvements To further design and obtain and Canoe Hale Areas) into existing Master Plan for Park. (design & permitting) permits for Master Plan. R18007 Parks Bond-BAB Hanalei $ - $ - $ - William T. Master Plan in public input phase until 3/18/2021. Final $ - revisions incorporated by end of June 2021, followed by delivery to Council. Project is to develop an RFP for the acquisition and implementation of a project management program to be used by project managers in several departments in order to Purchase and implementation of a develop consistent management and reporting practices in the program for project management to management of CIP projects. The committee met in CIP Management System be used by PMs in several W10051 Public Works Bond-BAB LThu`e $ 7,623 $ 7,623 Wade L. September and expressed a preference for a product called $ (7,623) $ - departments Procore. They discussed the priority needs and instructed the PM to develop the RFP. This project has been incorporated into the County -wide IT review evaluation project. The funds will be transferred to the new SW CIP project BMPs at RTS Islandwide Due to timing issues related to design, environmental, funding priorities, etc., the project was repackaged into two projects, Collector Roads Collector Roads Improvements W18002 Engineering Bond Islandwide $ 192,432 $ 192,432 MM/Troy Olohena Phase 1 and Olohena, Kukui, Ulu Streets. Funding $ 192,432 Improvements will be used in FY21-22 on Olohena Phase 1 and Kawaihau Roads. GET funds will be an additional funding source for these projects, which are primarily repair and resurfacing. This project is the 2nd phase of the Olohena Road project, named Kukui Street and Olohena Road (RTE 581) Collector Roads Improvements. The construction costs are estimated at a Improvements Collector Roads Improvements W18006 Engineering Bond Islandwide $ 5,618 $ 5,618 MM/Troy $3.5M. This project will require time to be permitted and $ 5,618 funded. The project is scheduled for federal FY2023 and federal FY2024 using ADVCON funds from GET. The County will seek STIP funding as a reimbursement. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Complete Streets Safety Implement complete street Improvements concepts on County roads where W14009 Engineering Bond-BAB Islandwide $ 19,134 $ 19,134 Michael M Funding used as opportunities arise. $ 19,134 applicable. This project is in the planning stage. Once the Section 7 is The `E subdivision collection completed, the project can move into the design phase. The system has had numerous sewer has funding for the design and construction is estimated at $3.35M line breaks. The Department of and will be secured via a CWSRF loan. The funds from this Health, Wastewater Branch (DOH project are being combined with funds from other projects. Ele'ele WWTP WWB) directed the County to W21A05 Waste Water General Ele'ele $ 27,281 $ 2,059 $ 25,222 Jason The new project is noted below and listed at the end of the $ 25,222 Improvements address the sewer line issues. A Bond Section. The consultant estimates work to be complete section 7 clearance with FWL is between 3-6 months (April -July 2021). The final letter report needed to amend the consultant's should be submitted to USFWS by March 30. Once consultant contract to include this specification completes work, WW will be able to go out to bid on the into the SOW. project. Roads Division staff completed rock installation in the parking lot. The chairs ordered arrived. An alternate plan for Fire Station(s) Improvements CIP projects to correct deficient W12012 Fire Bond Uhu`e & Kalalea $ 200,000 $ 65,926 $ 134,074 Mike C. completing the driveway that may save funds. Will be working $ 134,074 pavement areas. on implementation of the plan which includes a concrete apron for the approach to Fire's bay and changing the scope of work for the driveway. Fuel Management System Furnish and install of AIM modules W13007 Auto Bond-BAB Lihu`e $ 33,965 $ 21,895 $ 12,070 Mike T. $ 12,070 in County Vehicles. Removal of existing tank (4000 gal) This project is on hold pending a county -wide analysis of and fuel dispenser pumps and compliance with SPCC regulations and determination Fuel Tanks Hanapepe replacing with new tank (15,000 gal) W17004 Auto Bond-1 R Waimea $ 50,000 $ 50,000 Dwayne A. regarding physical location of the tanks on the site. As a $ (50,000) $ and pumps at Hanapepe Baseyard result, the funds are being transferred to new FY2021 CIP project, BMPs at RTS Islandwide. Federal aid project. $1,290,000 is obligated in the STIP for Hanapepe Bridge Address bridge repair work and Hanapepe Bridge Repairs. This funding is for design work. Reconstruction (County installation of new pedestrian W09007 Engineering Bond-05 Waimea $ 98,905 $ 921 $ 97,984 Donald F. The scoping of the design work is in process. Future funding $ 97,984 Match) walkway. for construction phase will be made through GE Tax transportation fund. The procurement will go out in June 2021. Project involves incorporating On STIP for FY 20-21. Contract amendment for PE2 with Hanapepe Road Resurfacing complete street concepts along with W 12067 Engineering BOND Waimea $ 47,000 $ 47,000 Troy T. AECOM was executed. Funding for construction phase will be $ 47,000 (County Match) the road resurfacing. made through GE Tax transportation fund. Design deadline is February 2022. Hanapepe Stadium Includes new comfort station, food Design contractor is working on permitting. Improvements booth and ticket booth. R17001 Parks Bond-05 Waimea $ 18,422 $ 11,700 $ 6,722 William T. Received State grant. Requires County match. Due to funding $ 6,722 constraints, no additional funding available in FY21-FY22 The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project is the design and and angles are adequate. The team is working on cost Helicopter Hangar construction of a helicopter hangar W 18018 Building, Fire Bond-BAB Lihu'e $ 1,485,000 $ 1,485,000 Doug H. estimates to enhance security measures to protect the $ (685,732) $ 799,268 to house the KFD helicopter. helicopter, and develop infrastructure (concrete pad, utilities, approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $73,000 for BMPS at RTS Islandwide, $330,960 Wailua Manhole Improvements, $235,200 Vertical Landfill Expansion, and $46,572 KWMCH improvements. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Islandwide Road Safety Project focusing on Islandwide Program roadway safety improvements W 18003 Engineering BOND Islandwide $ 32,481 $ 32,481 Various Used for various road safety projects around the island. $ 32,481 including guardrail and striping Infrastructure improvements completed for Sungard IT Infrastructure ERP/Financial system, fiber Improvements (Multi -phase) network connectivity, disaster X10006 IT Bond Islandwide $ 359,799 $ 359,799 $ - Del S. Project complete. $ - recovery capability, and virtual server environment with expanded storage. Kalaheo Neighborhood Gym Construction funds to repair gym to harden facility R18009 Parks Building Bond-BAB Koloa $ 95,719 $ 41,211 $ 54,508 Doug H. Project completed. In close-out phase. Any remaining funds $ $ (Roof Reconstruction) roof and partially - will be reallocated to other projects. (54,508) - as a hurricane shelter Due to erosion from storms the The preliminary plans currently under internal staff review. Kanaele Road Slope slope along Kanaele Road needs to W09005 Engineering Bond-05 Kawaihau $ 50,300 $ 50,300 Joel B. Project Manager is working on Right Of Way acquisitions. $ 50,300 Stabilization be stabilized. Once review is completed, development of the final design will proceed. Project develops a substation on The design consultant is preparing concept drawings for Kapa`a Police Substation grounds of Mahelona hospital. W18013 Building, Police Bond-2018 Kawaihau $ 265,000 $ 265,000 Doug H. presentation purposes for Administration, Council, Legislators, $ 265,000 HHSC Board, HHSC consultant, and community stakeholders. Kapa`a Pool Restroom Kapaa Pool Filter & Pump System R14002 Parks Bond-BAB Kawaihau $ 80,000 $ 200 $ 79,800 William T. Applying to Planning for a permit exemption. Plans and specs $ 79,800 Reconstruction ready to publish by June 2021. Kapa`a Stadium Consultant to assist in planning and designing R18002 Parks BOND Kawaihau $ 67,135 $ 67,135 Nancy M. Project completed. In close-out phase. Any remaining funds $ 67,135 Improvements next phase of will be reallocated to other projects. improvements. Kawaihau, Hauaala, Improvements include complete Funding County Match with GET funds. Concurrence of Mailihuna Complete Street & street and safe routes to school W10045 Engineering Bond-BAB Kawaihau $ 66,672 $ 4,676 $ 61,996 Joel B. Award from HDOT in process. ROA to contractor and NTP $ 61,996 Safety Improvements concepts. letter pending The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project involves design and and angles are adequate. The team is working on cost KFD Helicopter Hanger Pad construction of a hangar pad to F14001 Building, Fire Bond-BAB LThu`e $ 234,267 $ 234,267 Doug estimates to enhance security measures to protect the $ (234,267) $ - house the KFD Helicopter. KFD is helicopter, and develop infrastructure (concrete pad, utilities, supplying the hanger structure. approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $184,585 a new project for KFD Clean Emissions, $35,000 for a new project KPD Vehicle Lift, and $14,682 for a new project BMPs at RTS Islandwide. Resurfacing and safety Engineering is working on limits of project related to Kilauea Road/Kolo Road improvements on Kolo Road and relationship to adjacent properties. The Planner is working with resurfacing and safety Kilauea Road -to be combined with W19001 Engineering Bond Hanalei $ 200,000 $ 200,000 Lee the FHWA Central Federal Lands manager and STIP to $ 200,000 improvements Federal Lands Access Project resolve a funding issue related to the FLAP funds and their (FLAP) use as County match monies. Koloa Road Safety This project involves assessing Project is complete except for Easement for KIUC with DOW. Improvements (County Koloa Road and installing safety W12065 Engineering Bond-BAB Koloa $ 5,840 $ 5,412 $ 428 Donald F. Anticipate four years in Land Court process. Balance of funds $ (428) $ 0 Match) improvements such guardrails at will be transferred to new project for KWMCH improvements. various locations. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST .. . -•103 Mot Construct multi -purpose facility The preliminary needs assessment study was reviewed by KPD Training Building adjacent to KEMA to facilitate PM, KPD leadership, and Consultant. The consultant is (KPAL) training, lab work, temporary W19005 Building, Police Bond Uhu`e $ 104,000 $ 104,000 Doug H. developing a phasing plan and budget based on likely funding $ (104,000) $ - housing, etc. parameters. Balance of funds being reallocated to new project, KPD Vehicle Lift. Planning Dept. is working with the IT Division and the LIMS consultant to fully digitize the Planning Department's various Land Information Land Information Management application processes, including but not limited to zoning Management System System (LIMS) X18001 Planning Bond-BAB $ 1,876,806 $ 1,382,988 $ 493,818 Ka'aina H permits, use permits, special permits, special management $ 493,818 area (SMA) permits, as well as the shoreline setback determination and the additional dwelling unit (ADU) and additional rental unit (ARU) clearance form processes. Phase I infrastructure commenced in November of 2020. Lima Ola Onsite Phase I Project to develop affordable Work is ongoing and more or less on schedule save for rain Infrastructure housing in Kalaheo. H18001 Housing Bond-BAB Kalaheo $ 5,819,203 $ 3,118,853 $ 2,700,350 Del delays connected to island wide flooding in April of 2021. The $ 2,700,350 site -work completion is estimated to be January 2022 due to rain delays. - Maluhia Road - final striping and guardrail work to be Collector Roads Project addressing portions of completed in March 2021 Improvements - Koloa, Maluhia Roads. $13M W19021 Engineering Bond Koloa $ 1,950,000 $ 1,885,583 $ 64,417 MM/Joel - Koloa Road work ongoing $ 64,417 Maluhia/Koloa(County Match) project - $2.6M county match - Roundabout work ongoing - Change order for weather delays — pending review Material Recovery Facility Development of a material recovery W13001 Solid Waste Bond Lihu`e $ 5,995 $ 5,995 Allison F. Project is complete. Balance of funds is being transferred to $ (5,995) $ - facility. new FY2021 CIP project, BMPs at RTS Islandwide. New Landfill & Resource Recovery Park Development of a new landfill and W10037 Solid Waste Bond-BAB Lihu`e $ 1,916 $ 1,916 Allison F. Project is complete. Balance of funds is being transferred to $ (1,916) $ - Dev./Acquisition recovery park. new FY2021 CIP project, BMPs at RTS Islandwide. (Plans/Design) Bridge inspection report indicated Niumalu Bridge Replacement bridge in poor condition. Weight W15104 Engineering Bond-BAB Uhu`e $ 50,000 $ 50,000 Christy B. Finalize negotiations and draft contract documents. $ 50,000 limit down graded and steel plate placed over bridge. Niumalu One way culvert bridge Niumalu Bridge Replacement temp repairs - design and replace - W18014 Engineering Bond-2018 Uhu`e $ 275,709 $ 275,709 Christy B. Finalize negotiations and draft contract documents. $ 275,709 100% COK Project involves design and This project is being transferred to a new CIP project, BMPs NPDES Compliance construction of NPDES compliance W13010 Solid Waste Bond-BAB Islandwide $ 208,392 $ 208,392 Allison F. at RTS Islandwide. This funding will move over to that project. $ (209,392) $ (1,000) items at various transfer stations. SW will seek a CWSRF loan for most of the cost. Budget is to develop the design to 60% complete. Current Project involves design and status is at 10%. Project will require additional funding to NPDES Compliance construction of NPDES compliance W13A10 Solid Waste Bond-BAB Islandwide $ 72,029 $ 72,029 Allison F. complete design work, plans, and construction. This project $ 72,029 items at various transfer stations. will address all four transfer stations. The target is commence with the 1st construction project in the 2Q 2020. Olohena Road Project addressing Olohena Improvements (County Road(RTE 581) W19002 Engineering Bond Kawaihau $ 400,000 $ 400,000 $ - MM Proceeding in FY 2020-2021 using GE Tax funds $ - Match) 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Bridge inspection reports identified Project is in progress. The temporary utilities are being Opaekaa Bridge (County this bridge to be in poor condition. W18015 Engineering Bond-2018 Kawaihau $ 652,449 $ 652,449 $ - MM installed. Construction of the new structure will begin once the $ - Match) Project involves design and temporary utility lines are installed. This is a FHWA project. construction of new bridge. Bridge inspection reports identified Project is in progress. The temporary utilities are being Opaekaa Bridge this bridge to be in poor condition. W10002 Engineering Bond-05 Kawaihau $ 40,011 $ 2 $ 40,009 MM installed. Construction of the new structure will begin once the $ 40,009 Replacement (County Match) Project involves design and temporary utility lines are installed. This is a FHWA project. construction of new bridge. Project involves multiple automation initiatives to enhance Payroll/Personnel existing systems/operations X10001 IT, Finance Bond-05 Islandwide $ 202,089 $ 196,079 $ 6,010 Del S. Several phases of project completed. Balance of funding $ 6,010 including: Employee Self Service, being absorbed into new HMRS project described below. On Boarding, Performance Evaluation, and Time/Attendance. STIP funded project. Total project costs currently estimated Puhi Road Ph II (County Planning, design and construction W16A04 Engineering Bond-1R Uhu`e $ 20,000 $ 996 $ 19,004 Donald F. at $5.6M. Working on DCAB submittal, and utility $ 19,004 Match) from Kaneka to Haleukana agreements. Engineering reviewing plans prior to finalizing 90% PS&E STIP funded project. Total project costs currently estimated Puhi Road PH II (County Federal Aid Project. STIP funding. W18016 Engineering Bond-BAB Puhi $ 27,693 $ 27,693 Donald F. at $5.6M. Working on DCAB submittal, and utility $ 27,693 match) agreements. Engineering reviewing plans prior to finalizing 90% PS&E Rice Street Crossing Street being assessed to Improvements incorporate complete street W10032 Engineering Bond-BAB Lihu'e $ 146,094 $ 146,094 $ - Michael M Project complete. $ - elements. Salt Pond Beach Park Super Parks project which includes The funding for this project will be reallocated to the new Facility Improvements comfort stations and pavilions R12002 Parks Bond-05 Waimea $ 73,000 $ 73,000 William T. KWMCH improvements project. $ (73,000) $ - repairs and upgrades. Salt Pond Beach Park Super Parks project which includes Part of the super -parks program. Poi'pu park completed. Facility Improvements comfort stations and pavilions R16001 Parks Bond-BAB Waimea $ 50,000 $ 50,000 William T. Development of scope to begin and align with timing of waste $ 50,000 repairs and upgrades. water improvements to the park. Salt Pond Wastewater Project will identify and construct improvements to the W14005 Engineering, Bond-BAB Waimea $ 120,005 $ 120,005 $ Donald F. Project completed. The Remaining funds ($97,589) were $ Improvements waste water Parks - reallocated to the HMRS project via a money bill. _ system as Salt Pond. TIGER Grant Project TIGER Grant project components (County Match) include: Conversion of Eiwa Street W17TGR Engineering Bond 1 R UThu'e $ 149,515 $ 149,515 $ - Doug H. Project completed. In close-out. $ to a transit hub; streetscape The County's involvement are due to two roadways on top of a levee Work on confirming decommission through Leonard Kaui and earthen dam of which are the Property Twin Reservoirs foundations of these roadways. W10046 Engineering Bond-BAB Kawaihau $ 2,264 $ 2,264 $ - Donald F. Work on Mail out information for affected land owners after $ _ Decommissioning being discussed FEMA finalizes CLOMR final map with private land owners, state and USACE Veterans Cemetery Project improvements include for the R10013 Parks Bond-BAB Waimea $ 87,492 $ 87,492 Wally R. Construction of the six -acre expansion of the cemetery is set $ 87,492 Improvements repairs and upgrades to commence April 2021. Communal Hall Facility Project is to address drainage Project has been on hold pending Grove Farm's completion of Wa'a Road Drainage Study issues along Waa Road during rain W14006 Engineering Bond-BAB Uhu`e $ 100,000 $ 100,000 Stanford its design plans. The funds will be reallocated to a new CIP $ (100,000) $ - events. project of the Vertical Landfill Expansion. Wailua Golf Course Replace Project replacing existing main R13009 Parks Bond-05 Lihu`e $ 20,000 $ 20,000 $ - Wally R. Project complete. $ - Existing Water Lines potable lines on the golf course. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R13A09 Parks Bond 05 Lihu'e $ 14,455 $ 4,493 $ 9,962 Wally R. for R2 discharge increase relating to WW project to abandon $ 9,962 ocean outflow at Wailua WWTP. Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R13B09 Parks Bond 1 R Lihu'e $ 9,072 $ 9,072 Wally R. for R2 discharge increase relating to WW project to abandon $ 9,072 ocean outflow at Wailua WWTP. Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R13C09 Parks Bond IT LThu`e $ 36,473 $ 36,473 Wally R. for R2 discharge increase relating to WW project to abandon $ 36,473 ocean outflow at Wailua WWTP. Wailua NPDES Effluent Project is to develop a replacement system to handle outflow so the W18011 Waste Water Bond-2018 LThu'e $ 1,339 $ 1,339 $ - Jason Amended contract completed. $ - Modifications (Design) ocean outflow can be abandoned. Rehabilitate Wailua SIPS 1 and Seeking SRF funds in order to commence construction in Wailua SIPS 1 Rehabilitation change to a submersible pump W19006 Waste Water Bond Kawaihau $ 1,104 $ 1,104 $ - Jason FY2021. $ _ station. Rehabilitate Wailua SIPS 3 and Seeking SRF funds in order to commence construction in Wailua SIPS 3 Rehabilitation change to a submersible pump W19007 Waste Water Bond Kawaihau $ 2,676 $ 2,676 $ - Jason FY2021. $ _ station. Wailua WWTP Project involves improvements and Amendment completed. The project is on hold pending Improvements/Renovation renovation work at the Wailua W10014 Waste Water Bond-1R Kawaihau $ 165,104 $ 165,104 $ - Jason securing additional funding for next phase. $ _ WWTP. Wailua WWTP Project involves improvements and W10A14 Waste Water Bond Kawaihau $ 130,000 130,000 Jason Amendment completed. The project is on hold pending Improvements/Renovation renovation work at the Wailua $ $ - securing additional funding for next phase. $ _ WWTP. Project is out to bid on 2/24/2021, closes 3/24/2021.Working Waimea R-1 Water Project involves developing a R-1 with County Attorney to get the CM and Construction contracts Distribution System water distribution system. W14078 Waste Water Bond-05 Waimea $ 30,993 $ - $ 30,993 Jason reviewed in order to meet deadlines with DOH. NTP projected $ 30,993 Improvements in Mid -April. The contract period is 9 months. Completion by FY 22 1 Q. Project is for irrigation upgrades, rehabilitation of the force main line, Project is out to bid on 2/24/2021, closes 3/24/2021.Working Waimea WWTP R-1 and design and construction of a with County Attorney to get the CM and Construction contracts Distribution (design) storage tank for the R-1 grade W18017 Waste Water Bond-2018 Waimea $ 55,003 $ - $ 55,003 Jason reviewed in order to meet deadlines with DOH. NTP projected $ 55,003 water. Construction funding of the in Mid -April. The contract period is 9 months. Completion by tank will be secured through an FY 22 1Q. SRF loan. Continuation of community West Kaua'i Development development plans in accordance Z18002 Planning Bond West Kauai 946 $ 38,,, $ 6722 $ 32224 Ka'aina H Project complete. Balance of funds will be reallocated to other $ (32,224) $ Plan with the General Plan Update for projects. each district Islandwide. The fund is used to fund change Funding was used to keep projects moving forward with CIP Contingency Fund orders and cost overruns on CIP W20000 CIP Bond Islandwide $ 186,899 $ 186,899 $ - Wade L. minimal delays. The remaining balance of $100,000 was $ - projects. transferred via a money bill into the HMRS project. Emergency Generator This project involves replacing the Design/Installation emergency generator that services W20001 IT Bond LThu`e $ 150,000 $ 150,000 $ - Wade L. Project is complete. $ the IT department. Project to replace HVAC system Project to put IT servers on separate HVAC system to protect servicing the IT center to protect it servers against over heating, unplanned shutdowns and IT HVAC Replacement from potential damages as a result W20002 IT Bond Lihu'e $ 300,751 $ 300,751 $ - Del S. accidental reprogramming. Secondly, the system will be $ of power failures and overheating. moved out of the IT space where employees are working. The project is in progress. Installation is underway. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Data collection is almost complete and they will be moving into Project to determine future resource phase II of the project, which is an evaluation of the current KFD Utilization and needs to align service facilities with F20000 Fire Bond North Shore $ 130,834 $ 121,519 $ 9,315 Derek T. condition of the department. There are 5 phases to the $ (g 315) $ - Operational Study population areas and future project. Phase III is System Demand Projections, Phase IV is demographic shifts. Proposed Strategies / Recommendations and Phase V is Delivery and Presentation. Project is to upgrade obsolete facilities along the sewer line in Upgrades to the collection system Kapaa, Waipouli, etc. Replace aging lift pumps with new Sewer Collection System in east Kauai. Includes lift stations, W20010 Waste Water Bond Kawaihau $ 125199 ,,. $ 125199 Donn K. technology that is based on submersible pumps, rather than $ (125,199) $ - Upgrades pumps, sewer lines, electronics, pumps and separate elevators. Funds from this project will be etc. reallocated to the Waimea R-1 Environmental Requirements project below. Construct R-1 recycled water storage and distribution system to This is a priority project to address DOH violation of poor wet - Waimea R-1 Environmental address DOH violation of wet well W21000 Waste Water Bond Waimea $ 125,199 $ 113,902 $ 11,297 Jason K. well performance. This is designated as a life/safety priority $ (11,297) $ - Requirements functionality and offset the need to project. Balance of funds from this project will be reallocated use potable water for irrigation to Wailua Emergency Manhole Upgrades project (W20030). purposes. Upgrades to the collection system Project is to upgrade obsolete facilities along the sewer line in Sewer Collection System in east Kauai. Includes lift stations, W20A10 Waste Water Bond Kawaihau $ 32,681 $ 32,681 Donn K. Kapaa, Waipouli, etc. Replace aging lift pumps with new $ 32,681 Upgrades pumps, sewer lines, electronics, technology that is based on submersible pumps, rather than etc. pumps and separate elevators. Long -Range Planner is working with consultant for community engagement phase of the project. Surveys of Waimea and Acquire 419 acre parcel located Kekaha residents were completed. Virtual engagement Waimea Land Acquisition between Waimea baseball park and W20015 Housing Bond Waimea $ 100,000 $ 100,000 $ - Ka'aina meetings were held on March 18, 2021 and March 20, 2021 to $ - Kekaha Road connect with community and solicit feedback of potential uses of the property. This process will continue for the next few months. Waimea Wastewater Determine the feasibility and W20015 Waste Water Bond Waimea $ 151,602 $ 151,602 Donn K. The funds were reallocated via a money bill to a new priority $ (151,602) $ - Environmental Requirements condition of the two reservoirs. project (Waimea R2 Reuse). Waimea Wastewater Determine the feasibility and W20A15 Waste Water Bond Waimea $ 48,398 $ 48,398 Donn K. The funds were reallocated via a money bill to a new priority $ (48,398) $ - Environmental Requirements condition of the two reservoirs. project (Waimea R2 Reuse). Development of a R-2 recycled This project will resolve the DOH violations of the high Waimea R2 Reuse water reuse project to resolve UIC W20015 Waste Water Bond Waimea Donn K. pressures in the UIC wells and return the UIC wells to its $ 151,602 $ 151,602 performance violations and return intended purpose as a back up system. Funds from the the UIC wells to backup disposal. above noted project are being reallocated to fund this project. Development of a R-2 recycled This project will resolve the DOH violations of the high Waimea R2 Reuse water reuse project to resolve UIC W20A15 Waste Water Bond Waimea Donn K. pressures in the UIC wells and return the UIC wells to its $ 48,398 $ 48,398 performance violations and return intended purpose as a back up system. Funds from the the UIC wells to backup disposal. above noted project are being reallocated to fund this project. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST -•id .. • IM Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. Wastewater Facility Plan Assess County wastewater system W20005 Waste Water Bond Islandwide $ 233,095 $ 233,095 $ - Jason PO was issued in February. Sampling to commence in March- $ - April. Eleele-the consultant will be submitting a draft report on 5/31/2021. Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. PO was issued in February. Sampling to commence in March - Wastewater Facility Plan Assess County wastewater system W20A05 Waste Water Bond Islandwide $ 189,922 $ 184,622 $ 5,300 Jason April. Eleele-the $ (5,300) $ - consultant will be submitting a draft report on 5/31/2021. Remaining balance of funds will be reallocated to the Wailua Emergency Manhole Upgrades project (W20030). Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. Wastewater Facility Plan Assess County wastewater system W20B05 Waste Water Bond Islandwide $ 193,921 $ 193,921 $ - Jason PO was issued in February. Sampling to commence in March- $ - April. Eleele-the consultant will be submitting a draft report on 5/31/2021. 1) Construct sidewalk on the mauka side and bike lanes on Ho`olako Street along the existing soccer fields; (2) Extend Ho`olako Street from the soccer fields to Ahukini Hoolako/Kaana Parcel Road, with two lanes in each W21010 Engineering Bond LThu`e $ 3,100,000 $ 3,100,000 $ - MM Funds were reallocated to other priority projects. $ Improvements direction, lanes, on -street parking, and sidewalks; (3) connect the two ends of existing Kaana Street with two lanes in each direction, lanes, on -street parking, and sidewalks. Rehabilitate the existing sewer lines in the 'Ele'ele Subdivision, where we The amendment to the contract was executed and the have experienced failures and required U.S. Fish and Wildlife Survey will begin. The Ele'ele WWTP spills. We will also construct new R21005/ consultant hired will take between 3-6 months to complete the Improvements sewer lines in order to provide relief R21A05 Waste Water Bond Ele'ele $ - Jason K. work and when done, they will be able to go out to bid on the $ 27,281 $ 27,281 to the capacity of sewer lines which W21005 project. become overwhelmed in storm The consultant coordinated with their sub consultant and the events and result in raw wastewater final letter report should be submitted to USFWS (March 30). spills. Rehabilitate the existing sewer lines The amendment to the contract was executed and the in the 'Ele'ele Subdivision, where we required U.S. Fish and Wildlife Survey will begin. The have experienced failures and consultant hired will take between 3-6 months to complete the Ele'ele WWTP spills. We will also construct new work and when done, they will be able to go out to bid on the sewer lines in order to provide relief W21005 Waste Water General Ele'ele $ 13,747 $ 13,747 Jason K. project. $ Improvements to the capacity of sewer lines which The consultant coordinated with their sub consultant and the become overwhelmed in storm final letter report should be submitted to USFWS (March 30). events and result in raw wastewater The funding for the design and construction is estimated at spills. $3.35M and will be secured via a CWSRF loan. Koloa/Po'ipu Intersection Development Fund monies to be towards intersection W16009 Engineering Development Koloa $ 40,250 $ 40,250 Michael M Intersection improvements for a roundabout at Koloa Road $ 40,250 Improvements used and Kalanikaumauka Drive. improvements Koloa/Po'ipu Intersection Development Fund monies to be Z15105 Engineering Development Koloa $ 6,500 $ 6,500 Michael M Intersection improvements for a roundabout at Koloa Road $ 6,500 Improvements used towards intersection and Kalanikaumauka Drive. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Project Contingency Contingency fund for Development W08002 Engineering Development Islandwide $ 35,568 $ 35,568 Michael M Contingency funds available for various Development projects. $ 35,568 projects This project account is used for the design and installation of Development Fund monies to be bus stops Islandwide. Phase IV was completed and future Islandwide Bus Stops used towards the design and T19000 Transportation Development Islandwide $ 27,600 $ 27,600 Leonard P. funding requests will be made in accordance with growth in $ 27,600 installation of bus stop various districts resulting in increased ridership, and increases improvements. due to reconfiguration of traffic patterns and road improvements. Development Fund monies from Wailua Bus Stop PDU-2015-7. Development Fund T16100 Transportation Development Kawaihau $ 6,579 $ 6,579 Leonard P. Funds from this development will be utilized for bus stop $ 6,579 monies to be used towards Wailua improvements in the area. area bus stop improvements. Project is to expand the administrative office and capabilities Expansion of Bus Facility Expansion of administrative offices W20040 Transportation GET Lihu'e $ 225,000 $ 113,754 $ 111,246 Leonard P. at the transit facility. The building has arrived and a permit $ 111,246 at bus transit facility Transportation application with the building department has been submitted. Anticipate to in placed in service in 3Q 2021. Adolescent Treatment & Development of a treatment and Building is complete. Remaining funds the funds are being Healing Center healing center on land donated by W10017 Building General LThu'e $ 27,278 $ 7,283 $ 19,995 Doug H. transferred to new FY2021 CIP project, BMPs at RTS $ (19,995) $ - Grove Farm in Kapahi. Islandwide. CFD-Po'ipu Road Multimodal This project involves Poiipu Road Stakeholder meetings were held. Public meetings being held. Improvements Improvements and implementation W13014 Engineering General Koloa $ 217,313 $ 472 $ 216,841 MM Funds transferred from CFD Funds $ 216,841 of complete streets. The scope of this project includes (1) a sidewalk on Ho'onani Road from Lawai Road to a the Waikomo Stream Bridge, (2) a marked pedestrian lane on the makai side of Ho'onani Road between the CFD-Ho'onani Road / Waikomo Stream Bridge and Kapili W21011 Engineering General K61oa $ 350,000 $ 350,000 MM $ 350,000 $ 700,000 Sidewalk Pedestrian Lane Road, and (3) a sidewalk on the mauka side of Ho'onani Road between the Kiahuna Plantation Resort beach parking lot and the Ho'onani Road cul-de-sac. Filling sidewalk gaps and crossing improvements on Lawai Road between the Poi'pu Roundabout and CFD-Lawai Road / Complete Kukuiula Harbor; the gaps to be Sidewalk filled are as follows: (1) from Ho'ona W21012 Engineering General K61oa $ 300,000 $ 300,000 MM $ 300,000 $ 600,000 Road to Prince Kuhio Condominiums, and (2) from Amio Road to past Alania Road. Energy sustainability project to heat the hot water system via a CFD-Pa'anau Phase I Solar hot water heating system for solar panel system. IFB was published resulting in the cost Energy Sustainability development. W21013 Housing General K61oa $ 636,000 $ 636,000 TBD estimate. Housing will work with OED Energy Sustainability $ 636,000 $ 1,272,000 Upgrades staff person to refine the project to create maximum efficiencies. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST 1 1 1 1 Pedestrian and bicycle facilities on roads that access to Poi'pu Beach park, (1) a shared use path or wide sidewalk on the west side of Ho`owili Road between Poi'pu Road Cipu Beach and Ho`one Road, (2) a marked W21014 Engineering General Koloa $ 1,693,707 $ 1,693,707 MM $ 1,693,707 $ 3,387,414 Pedesttrianrian / Bicycle Access pedestrian lane on Ho`one Road between Waiohai Beach and Nalo Road, and (3) filling sidewalk gaps at several locations on Pe`e Road. Habitat Conservation Plan Endangered Species habitat W08012 County Attorney- General Islandwide $ 40,474 $ 40,474 Pat P. Annual funding. $ 40,474 conservation Plan Parks Host Community Benefits - $4.76/ton x 91,804 = FY 2019 W09012 Misc. General Kekaha $ 609,389 $ 220,282 $ 389,107 83,407 tons in 2016. 83,407 tons X $2.38/tn= $198,508.66. $ 218,494 $ 607,601 Kekaha Tonnage Host Community Benefits - Interest through 6/30/2019 W09012 Misc. General Kekaha $ 6,967 $ 6,967 $ - Interest $ 7,701 $ 7,701 Kekaha Project is the design and Construction bids came in much higher than anticipated. A Helicopter Hangar construction of a helicopter hangar W 18018 Building, Fire General Lihu`e $ 120,000 $ 120,000 Doug H. design/bid contract is being utilized with the low bidder. The $ 120,000 to house the KFD helicopter. contractor, PM, and KFD are working together to value engineer the project to meet budgetary constraints. Project to put IT servers on separate HVAC system to protect IT Infrastructure servers against over heating, unplanned shutdowns and Improvements (Multi -phase) X10006 IT General Islandwide $ 286,315 $ 286,315 $ - Doug H. accidental reprogramming. Secondly, the system will be $ - moved out of the IT space where employees are working. The project is in progress. Installation is underway. Kapule Counters Renovation Project is in progress. Counters and floor covering has been (RPA/Planning) Renovate RPA area. W19105 Parks General LThu`e $ 150,000 $ 135,163 $ 14,837 Kathleen S. replaced. Door and hardware is on order and will be installed $ 14,837 upon delivery. Project completion is targeted for April. -Resolve possible right-of-way inconsistency Resurfacing and safety - Reach out to property owners for donation of land, if Kilauea Road/Kolo Road improvements on Kolo Road and necessary resurfacing and safety Kilauea Road -to be combined with W19001 Engineering General Hanalei $ 50,000 $ 50,000 Lee S. - FHWA-CFL negotiating a final design contract with their $ 50,000 improvements Federal Lands Access Project consultant (FLAP) - Receive final draft agreement from FHWA-CFL - Finalize agreement with FHWA-CFL Construct multi -purpose facility PM, KPD leadership and consultant working to finalize the use KPD Training Building adjacent to KEMA to facilitate and space programming. Preliminary budget and utilization W19005 Building, Police General Uhu`e $ 230,000 $ 126,000 $ 104,000 Doug H. needs reviewed. Consultant working on phasing plan based $ (104,000) $ - (KPAL) training, lab work, temporary on likely 1st phase budget parameters. Remaining funds will housing, etc. be reallocated to new CIP project, KPD Vehicle Evidence Lift. Park Improvement: Waimea W96073 Parks General Waimea $ 6,466 $ 6,466 William T. Park improvements for this district. $ 6,466 District Waimea/Kekaha ADA ADA Improvements of two parks in Received draft plan from design consultant. Staff is R18015 Parks General Waimea $ 561,932 $ 250,000 $ 311,932 William T. reviewing. $250,000 of this budget was transferred via a $ 311,932 Improvements West Kauai. money bill for repairs to the Kapaa Neighborhood Center Pool. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST M .• . -• M, � VA1;1WP_ West Kaua'i Development Z18004 Planning General Waimea 217 $ 2,, $ 2184 $ 33 Ka'aina H Project Complete. Balance of funding will be reallocated to $ (33) $ - Plan other projects. Historic County Building Improvements to the Historic Project Complete. Balance of funding to be reallocated as Security & Grounds R20000 Parks General LThu`e $ 295,265 $ 1,498 $ 293,767 Brian E. follows; $41,324 to BMPs at RTS Islandwide, and $252,443 to $ (293,767) $ - Improvements County Building facility and grounds Wailua Emergency Manhole Upgrades (W20030). Software program for managing Funds added via a money bill to increase the budget for this HRMS, Payroll & Personnel HR, payroll, scheduling, OT, J20000 IT-HR General Lihu`e $ 1,684,927 $ 1,341,011 $ 3,025,938 Del S. $ 3,025,938 benefits, etc. project. Inclusive Playground Development of a playground R20020 Parks General Islandwide $ 400,000 $ 400,000 William T. RFP In Purchasing for approval and publication. Estimated $ 400,000 Development designed for special needs youth. completion date 6/30/2021. The project is to formulate a re- Design on going. Parks plans on getting design work Islandwide Playcourt surfacing program for the play R20010 Parks General Islandwide $ 250,000 $ 153,000 $ 97,000 William T. completed and project shovel ready in the event funding $ 97,000 Resurfacing courts (tennis, basketball) at County became available. Funding may be made available in CIP parks. budget. Estimated completion of design work is 3/2021. Phase I will replace ADA approved Islandwide Playground equipment at Waimea, Kekaha, R20005 Parks General Islandwide $ 91,679 $ 6,331 $ 85,348 William T. All FY20 repairs completed. No additional funding available at $ 85,348 Equipment Kapahi, Wailua Houselots, Eleele this time. Nani & Peter Rayno parks. Project to evaluate all of the IT Systems County -wide County IT needs (current & future) The selected consultant is evaluating the current practices and evaluation, design and to ensure that County systems X20001 IT -Planning -etc. General Lihu`e $ 1,000,000 $ 1,000,000 $ - Del S. systems in order to prepare its recommendations. The $ - implementation develop with the organizational preliminary recommendations are expected in 2Q 2021. needs in mind_ This project is to develop locations Brian J. Baptiste park project complete (adding lighting). Skateboard Parks (Design & so skateboarders can have a safe R20015 Parks General Islandwide $ 400,000 $ 400,000 William T. Cares Act funding was utilized for a grant to an NGO to make $ 400,000 Development) environment. improvements which were completed before the end of 2020. Hanapepe: Quick build items on order Upgrade the two transition To pay for the repairs, the Administration proposes to manholes to provide an upgrade to reallocate $252,443 from the Historic County Building Security Wailua Emergency Manhole the Division's sewer collection project which is complete, $330,960 from the Helicopter Upgrades system. This will allow for public W20030 Waste Water General LThu`e $ 84,750 $ 84,750 Jason Hangar project which will be done at a lesser expense, $5,300 $ 600,000 $ 684,750 safety and proper conveyance of in savings from the Waste Water Fac Plan update, and raw wastewater to the Wailua $11,297 from the Waimea Environmental R1 project. WWTP. This project will design the expanded reuse infrastructure at the Working on EA. DOH had comments on scope of work on Wailua WWTP Wailua Golf Course and the W20025 Waste Water General Kawaihau $ 110,963 $ 110,963 $ - Jason 2/25/2021. Comments passed along to consultants to adjust $ - Improvements/Renovation process improvements at the plant approach to execute the project based on the comments. in order to reliably produce R-2 recycled water consistently. Meeting with IT who related that they have a team and a game plan on approach to the project. February 9th was the last Wastewater Billing System Upgrade the billing system. W20035 Waste Water General L7hu`e $ 200,000 $ 1,920 $ 198,080 Jason update from IT. Project has not made any substantial $ 198,080 Upgrades progress in 3 weeks. Moving forward we will be receiving weekly reports from the IT team involved in the project. This project will use the existing Navaline system for billings. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST 1 1 1 1 1) Construct sidewalk on the mauka side and bike lanes on Ho`olako Street along the existing soccer fields; (2) Extend Ho`olako Street from the soccer fields to Ahukini Hoolako/Kaana Parcel Road, with two lanes in each New Engineering General Lihu`e $ 1,400,000 $ 1,400,000 $ - MM The funding for this project was reallocated to other priorities $ Improvements direction, lanes, on -street parking, via a money bill. The project is on -hold. and sidewalks; (3) connect the two ends of existing Kaana Street with two lanes in each direction, lanes, on -street parking, and sidewalks. I nis project seeKs to determine the feasibility of converting the Green Selection committee including one non -government employee Waste to Energy Project Energy Plant located near Mt. Kahili W21025 Solid Waste General Koloa $ 300,000 $ 300,000 Keith P. is seeking professional service solicitations for the work. The $ 300,000 to incinerate trash. committee will review the respondents. Project to perform bridge Biennial Bridge Inspections inspections at all County bridges W96388 Engineering Highway Islandwide $ 502,197 $ 19,900 $ 482,297 Donald F. The County has done a contract amendment to add this work $ 482,297 over 20 ft. in length every two as an additional phase to the current contract. years. Comprehensive Road Consultant to evaluate road W13011 Roads Highway Islandwide 067 $ 36,,. $ 36067 Scott S. Funds will be used for next update in 2020. Roads Division is $ 36,067 Maintenance Plan conditions of County roads considering the LITAR technology. Hanapepe Bridge Working on design via amendment to bridge inspection Reconstruction (County Pedestrian Walkway Replacement W12069 Engineering Highway Waimea $ 24,448 $ 24,448 Donald F. contract. Amendment executed on 11/16/2019. Design work $ 24,448 Match) has commenced. Hanapepe Moi Road Design and construct new sidewalk W17000 Engineering Highway Waimea $ 375,000 $ 375,000 Joel B. Design was being performed in-house. Ready for Engineer $ 375,000 Sidewalk along Moi road review. Seeking 343 exemption. Hanapepe Road Resurfacing Project involves incorporating W12067 Engineering Highway Waimea $ 15,902 $ 79 $ 15,823 Joel B. Design contract in place. County match will be approximately $ 15,823 (County Match) complete street concepts along with $65k. the road resurfacing. Kapahi Bridge Replacement Replace dilapidated bridge. W05368 Engineering Highway Kawaihau $ 21,207 Donald F. Project Complete. Balance of funds will be transferred for use $ (21,207) $ - (County Match) on the Maluhia/Koloa Road CIP project. - Maluhia Road - final striping and guardrail work to be Koloa/Maluhia Road Project addressing portions of completed in March 2021 Improvements Koloa, Maluhia Roads. W19021 Engineering Highway Koloa $ 406,346 $ 261,795 $ 144,551 MM - Koloa Road work ongoing $ 144,551 - Roundabout work ongoing - Change order for weather delays — pending review - Schedule community meetings about preliminary plans (Olohena Bridge 2) - Utility Agreements, Draft ROES need to be compiled with exhibits and sent to owners Olohena Road Project Olohena Road (RTE 581) W19002 Engineering Highway Kawaihau $ 332,492 $ 332,492 MM - 100% plans in progress $ 332,492 Improvements - Amendment for Bridge Widening pending - will add contract time till completion - Working with KIUC on utility pole relocations - Driveway field visit - need to follow up with Regulatory Section Bridge inspection reports identified Puuopae Bridge this bridge to be in poor condition. W10003 Engineering Highway Kawaihau $ 77,003 $ 52,106 $ 24,897 Joel B. Project Complete. Balance of funding to be reallocated to $ (24,897) $ - Replacement (County Match) Project involves design and another project. construction of new bridge. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 CIP-MASTER LIST Pua Nani Road Drain Repair Project involves work to repair W18004 Engineering Highway LThu`e $ 20,309 $ 20,309 Troy T. Project complete. Balance of funding to be reallocated to $ (20,309) $ - existing drain along Pua Nani Road another project. This project will reconstruct Puhi Puhi Road Construction Road from Kaumuali`i Hwy to W12010 Engineering Highway Lihu`e $ 18,938 $ 18,938 Donald F. Project held open for future phases as STIP funding becomes $ 18,938 (County Match) Kaneka Street. Complete streets available. concepts will also be included. Resurfacing Various Project addressing portions of Collector Roads (County Hauaala, Mailihuna and Olohena W07008 Engineering Highway Islandwide $ 35,265 $ 8,838 $ 26,427 Joel B. Work on various collector roads Islandwide. $ 26,427 Match) Roads. Speed Hump/Traffic Calming Project to respond to resident concerns of localized W98364 Engineering Highway Islandwide $ 68,080 $ 68,080 MM Traffic Calming Program $ 68,080 Program speeding/dangerous driving. Project to perform bridge County Bridge Inspections inspections at all County bridges W20020 Engineering Highway Islandwide $ 400,000 $ 298,718 $ 101,282 Donald F. This phase is in progress. $ 101,282 and effect repairs for bridges under Kalaheo Neighborhood Gym Repairs to gym floors, roof, doors, R15015 Building/Parks Special Trust Kalaheo $ 567 $ 2 $ 565 Doug H. Work is complete. Project is in close-out phase. Any $ 565 Improvements etc. remaining funds will be reallocated to other projects. Park Imp. & Equip.: Koloa Grant funds for local community W93086 Parks Special Trust Koloa $ 9,268 $ 9,268 William T. Funds for parks improvements and equipment. $ 9,268 Dist. organizations. Park Imp. Grant, Koloa Dist. Grant funds for local community W96087 Parks Special Trust Koloa $ 11,000 $ 11,000 William T. Funds to support recreational organizations through grants. $ 11,000 organizations. Parking Lot/Play Court Project for Koloa N/C parking and Resurfacing Koloa Park Basketball/Tennis Court R15108 Parks Special Trust Koloa $ 164,289 $ 164,289 William T. $ 164,289 Resurfacing Kamalani Playground Project to resurface the playground R18003 Parks Special Trust LThu`e $ 81,371 $ 81,371 Klayford N. $ 81,371 Resurfacing area. Includes repairs to floor tiles, roof, Backstage area refurbishment is 90% complete. New KWMCH Improvements R18004 Parks Special Trust LThu`e $ 178,330 $ 19,949 $ 158,381 Wally R. counters, light fixtures, costume racks, painting, etc. has been $ 158,381 air conditioner system and repaint completed. Park Imp.: LThu'e Dist. Grant Grant funds for local community W96102 Parks Special Trust LThu`e $ 42,600 $ 42,600 Wally R. Funds to support recreational organizations through grants. $ 42,600 organizations. Park Imp. &Equip. Kawaihau W93116 Parks Special Trust Kawaihau $ 8,049 $ (30,852) $ 38,901 William T. Funds for parks improvements and equipment. $ 38,901 Dist. Park Imp. Kawaihau Dist. Funds to support recreational W96118 Parks Special Trust Kawaihau $ 30,000 $ 4,899 $ 25,101 William T. $ 25,101 Grant organizations through grants. Playground Improvements Replace/refurbish playground (Wailua Houselots and R16003 Parks Special Trust Kawaihau $ 19,245 $ 19,245 William T. $ 19,245 Homestead) equipment. This project is to develop locations Skateboard Park so skateboarders can have a safe R20025 Parks Special Trust Kawaihau $ 36,823 $ 36,823 William T. $ 36,823 environment. Anini Beach Park Next Super Parks Project includes Improvements renovation/upgrades to all comfort R16004 Parks Special Trust Hanalei $ 144,000 $ 144,000 William T. $ 144,000 stations, pavilions, etc. Park Imp. & Equip. Hanalei W93383 Parks Special Trust Hanalei $ 36,960 $ 36,960 William T. $ 36,960 Dist. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 AUTO PROJECTS .• . -. • 1 M M, � Project involves installation of a Auto Shop Improvements mezzanine floor for storage of tools W13005 Building/Auto Bond-BAB UThu`e $ 345,668 $ 330,672 $ 14,996 Doug H. Project is complete. Close out is in progress. $ 14,996 and equipment. Fuel Management System Furnish and install of AIM modules W13007 Auto Bond-BAB Uihu`e $ 33,965 $ 21,895 $ 12,070 Mike T. $ 12,070 in County Vehicles. Removal of existing tank (4000 gal) This project is on hold pending a county -wide analysis of and fuel dispenser pumps and compliance with SPCC regulations and determination Fuel Tanks Hanapepe replacing with new tank (15,000 gal) W17004 Auto Bond-1 R Waimea $ 50,000 $ 50,000 Dwayne A. regarding physical location of the tanks on the site. As a $ (50,000) $ and pumps at Hanapepe Baseyard result, the funds are being transferred to new FY2021 CIP project, BMPs at RTS Islandwide. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 BUILDING DEPARTMENT PROJECTS Adolescent Treatment & Development of a treatment and healing land donated by M18001 Building Bond-BAB LThu`e $ $ 26,599 Doug H. Project is complete. Balance of funds is being transferred to $ $ Healing Center center on - new FY2021 CIP project, BMPs at RTS Islandwide. (26,599) - Grove Farm in Kapahi. Project involves installation of a Auto Shop Improvements mezzanine floor for storage of tools W13005 Building/Auto Bond-BAB Lihu`e $ 345,668 $ 330,672 $ 14,996 Doug H. Project is complete. Close out is in progress. $ 14,996 and equipment. The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project is the design and and angles are adequate. The team is working on cost Helicopter Hangar construction of a helicopter hangar W 18018 Building, Fire Bond-BAB Lihu`e $ 1,485,000 $ 1,485,000 Doug H. estimates to enhance security measures to protect the $ (685,732) $ 799,268 to house the KFD helicopter. helicopter, and develop infrastructure (concrete pad, utilities, approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $73,000 for BMPS at RTS Islandwide, $330,960 Wailua Manhole Improvements, $235,200 Vertical Landfill Expansion, and $46,572 KWMCH improvements. Kalaheo Neighborhood Gym Construction funds to repair gym to harden facility R18009 Parks Building Bond-BAB Koloa $ 95,719 $ 41,211 $ 54,508 Doug H. Project completed. In close-out phase. Any remaining funds $ $ (Roof Reconstruction) roof and partially - will be reallocated to other projects. (54,508) - as a hurricane shelter Project develops a substation on The design consultant is preparing concept drawings for Kapa`a Police Substation grounds of Mahelona hospital. W18013 Building, Police Bond-2018 Kawaihau $ 265,000 $ 265,000 Doug H. presentation purposes for Administration, Council, Legislators, $ 265,000 HHSC Board, HHSC consultant, and community stakeholders. The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project involves design and and angles are adequate. The team is working on cost KFD Helicopter Hanger Pad construction of a hangar pad to F14001 Building, Fire Bond-BAB Lihu`e $ 234,267 $ 234,267 Doug estimates to enhance security measures to protect the $ (234,267) $ - house the KFD Helicopter. KFD is helicopter, and develop infrastructure (concrete pad, utilities, supplying the hanger structure. approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $184,585 a new project for KFD Clean Emissions, $35,000 for a new project KPD Vehicle Lift, and $14,682 for a new project BMPs at RTS Islandwide. Construct multi -purpose facility The preliminary needs assessment study was reviewed by KPD Training Building adjacent to KEMA to facilitate PM, KPD leadership, and Consultant. The consultant is (KPAL) training, lab work, temporary W19005 Building, Police Bond LThu`e $ 104,000 $ 104,000 Doug H. developing a phasing plan and budget based on likely funding $ (104,000) $ - housing, etc. parameters. Balance of funds being reallocated to new project, KPD Vehicle Lift. Adolescent Treatment & Development of a treatment and Building is complete. Remaining funds the funds are being Healing Center healing center on land donated by W10017 Building General Lihu`e $ 27,278 $ 7,283 $ 19,995 Doug H. transferred to new FY2021 CIP project, BMPs at RTS $ (19,995) $ - Grove Farm in Kapahi. Islandwide. The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The Project is the design and helicopter pilot confirmed that the landing approach distances Helicopter Hangar construction of a helicopter hangar W18018 Building, Fire General LThu`e $ 120,000 $ 120,000 Doug H. and angles are adequate. The team is working on cost $ 120,000 to house the KFD helicopter. estimates to enhance security measures to protect the helicopter, and develop infrastructure (concrete pad, utilities, approach, etc.) and preparing an RFP for professional services. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 BUILDING DEPARTMENT PROJECTS 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 ENGINEERING-ROADS-PW PROJECTS Construct new seawall and The design contract was amended to include the new erosion Aliomanu Road associated roadway improvements. W18012 Engineering Bond-BAB $ 101,431 $ 66,425 $ 35,006 Donald F. area due to additional storm activity. Additional revetment $ 35,006 work will be done to protect the single traffic lane remaining. Anini Bridge Replacement Project to replace dilapidated one- Temporary bridge is in place. STIP funds are limited and (County Match) lane bridge on Anini Road near the W14001 Engineering Bond-BAB Hanalei $ 1,354 $ 1,354 Troy T. prioritized to other projects. This project will be undertaken $ 1,354 park. STIP project once STIP funding becomes available. Project to perform bridge The County is required to inspect all FHWA bridges. This fund Biennial Bridge Inspections inspections at all County bridges W96388 Engineering Bond Islandwide $ 27,912 $ 20,000 $ 7,912 Donald F. request is for the consultant services to perform the bridge $ 7,912 (County Match) over 20 ft. in length every two inspections and perform certain repairs. Contract amendment years. was executed and inspections in process. Project is to develop an RFP for the acquisition and implementation of a project management program to be used by project managers in several departments in order to Purchase and implementation of a develop consistent management and reporting practices in the program for project management to management of CIP projects. The committee met in CIP Management System be used by PMs in several W10051 Public Works Bond-BAB LThu`e $ 7,623 $ 7,623 Wade L. September and expressed a preference for a product called $ (7,623) $ - departments Procore. They discussed the priority needs and instructed the PM to develop the RFP. This project has been incorporated into the County -wide IT review evaluation project. The funds will be transferred to the new SW CIP project BMPs at RTS Islandwide Due to timing issues related to design, environmental, funding priorities, etc., the project was repackaged into two projects, Collector Roads Collector Roads Improvements W18002 Engineering Bond Islandwide $ 192,432 $ 192,432 MM/Troy Olohena Phase 1 and Olohena, Kukui, Ulu Streets. Funding $ 192,432 Improvements will be used in FY21-22 on Olohena Phase 1 and Kawaihau Roads. GET funds will be an additional funding source for these projects, which are primarily repair and resurfacing. This project is the 2nd phase of the Olohena Road project, named Kukui Street and Olohena Road (RTE 581) Collector Roads Improvements. The construction costs are estimated at a Improvements Collector Roads Improvements W18006 Engineering Bond Islandwide $ 5,618 $ 5,618 MM/Troy $3.5M. This project will require time to be permitted and $ 5,618 funded. The project is scheduled for federal FY2023 and federal FY2024 using ADVCON funds from GET. The County will seek STIP funding as a reimbursement. Complete Streets Safety Implement complete street Improvements concepts on County roads where W14009 Engineering Bond-BAB Islandwide $ 19,134 $ 19,134 Michael M Funding used as opportunities arise. $ 19,134 applicable. Federal aid project. $1,290,000 is obligated in the STIP for Hanapepe Bridge Address bridge repair work and Hanapepe Bridge Repairs. This funding is for design work. Reconstruction (County installation of new pedestrian W09007 Engineering Bond-05 Waimea $ 98,905 $ 921 $ 97,984 Donald F. The scoping of the design work is in process. Future funding $ 97,984 Match) walkway. for construction phase will be made through GE Tax transportation fund. The procurement will go out in June 2021. Project involves incorporating On STIP for FY 20-21. Contract amendment for PE2 with Hanapepe Road Resurfacing complete street concepts along with W12067 Engineering BOND Waimea $ 47,000 $ 47,000 Troy T. AECOM was executed. Funding for construction phase will be $ 47,000 (County Match) the road resurfacing. made through GE Tax transportation fund. Design deadline is February 2022. Islandwide Road Safety Project focusing on Islandwide Program roadway safety improvements W18003 Engineering BOND Islandwide $ 32,481 $ 32,481 Various Used for various road safety projects around the island. $ 32,481 including guardrail and striping 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 ENGINEERING-ROADS-PW PROJECTS Due to erosion from storms the The preliminary plans currently under internal staff review. Kanaele Road Slope slope along Kanaele Road needs to W09005 Engineering Bond-05 Kawaihau $ 50,300 $ 50,300 Joel B. Project Manager is working on Right Of Way acquisitions. $ 50,300 Stabilization be stabilized. Once review is completed, development of the final design will proceed. Kawaihau, Hauaala, Improvements include complete Funding County Match with GET funds. Concurrence of Mailihuna Complete Street & street and safe routes to school W10045 Engineering Bond-BAB Kawaihau $ 66,672 $ 4,676 $ 61,996 Joel B. Award from HDOT in process. ROA to contractor and NTP $ 61,996 Safety Improvements concepts. letter pending Resurfacing and safety Engineering is working on limits of project related to Kilauea Road/Kolo Road improvements on Kolo Road and relationship to adjacent properties. The Planner is working with resurfacing and safety Kilauea Road -to be combined with W19001 Engineering Bond Hanalei $ 200,000 $ 200,000 Lee the FHWA Central Federal Lands manager and STIP to $ 200,000 improvements Federal Lands Access Project resolve a funding issue related to the FLAP funds and their (FLAP) use as County match monies. Koloa Road Safety This project involves assessing Project is complete except for Easement for KIUC with DOW. Improvements Count p y Koloa Road and installing safety W12065 Engineering g g Bond-BAB Koloa $ 5,840 $ 5,412 $ 428 Donald F. Anticipate four ears in Land Court process. Balance of funds $ 428 ( ) $ 0 Match)( improvements such as guardrails at will be transferred to new project for KWMCH improvements. various locations. - Maluhia Road - final striping and guardrail work to be Collector Roads Project addressing portions of completed in March 2021 Improvements - Koloa, Maluhia Roads. $13M W19021 Engineering Bond Koloa $ 1,950,000 $ 1,885,583 $ 64,417 MM/Joel - Koloa Road work ongoing $ 64,417 Maluhia/Koloa(County Match) project - $2.6M county match - Roundabout work ongoing - Change order for weather delays - pending review Bridge inspection report indicated Niumalu Bridge Replacement bridge in poor condition. Weight W15104 Engineering Bond-BAB Uhu`e $ 50,000 $ 50,000 Christy B. Finalize negotiations and draft contract documents. $ 50,000 limit down graded and steel plate placed over bridge. Niumalu One way culvert bridge Niumalu Bridge Replacement temp repairs - design and replace - W18014 Engineering Bond-2018 LThu`e $ 275,709 $ 275,709 Christy B. Finalize negotiations and draft contract documents. $ 275,709 100% COK Olohena Road Project addressing Olohena Improvements (County Road(RTE 581) W19002 Engineering Bond Kawaihau $ 400,000 $ 400,000 $ - MM Proceeding in FY 2020-2021 using GE Tax funds $ - Match) Bridge inspection reports identified Project is in progress. The temporary utilities are being Opaekaa Bridge (County this bridge to be in poor condition. W18015 Engineering Bond-2018 Kawaihau $ 652,449 $ 652,449 $ - MM installed. Construction of the new structure will begin once the $ - Match) Project involves design and temporary utility lines are installed. This is a FHWA project. construction of new bridge. Bridge inspection reports identified Project is in progress. The temporary utilities are being Opaekaa Bridge this bridge to be in poor condition. W10002 Engineering Bond-05 Kawaihau $ 40,011 $ 2 $ 40,009 MM installed. Construction of the new structure will begin once the $ 40,009 Replacement (County Match) Project involves design and temporary utility lines are installed. This is a FHWA project. construction of new bridge. STIP funded project. Total project costs currently estimated Puhi Road Ph II (County Planning, design and construction W16A04 Engineering Bond-1 R Lihu`e $ 20,000 $ 996 $ 19,004 Donald F. at $5.6M. Working on DCAB submittal, and utility $ 19,004 Match) from Kaneka to Haleukana agreements. Engineering reviewing plans prior to finalizing 90% PS&E STIP funded project. Total project costs currently estimated Puhi Road PH II (County Federal Aid Project. STIP funding. W18016 Engineering Bond-BAB Puhi $ 27,693 $ 27,693 Donald F. at $5.6M. Working on DCAB submittal, and utility $ 27,693 match) agreements. Engineering reviewing plans prior to finalizing 90% PS&E 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 ENGINEERING-ROADS-PW PROJECTS -• .. • • Rice Street Crossing Street being assessed to Improvements incorporate complete street W10032 Engineering Bond-BAB Uhu`e $ 146,094 $ 146,094 $ - Michael M Project complete. $ - elements. Salt Pond Wastewater Project will identify and construct improvements W14005 Engineering, Bond-BAB Waimea 120,005 120,005 Donald F. Project completed. The Remaining funds ($97,589) were to the waste water $ $ $ - $ _ Improvements system as Salt Pond. Parks reallocated to the HMRS project via a money bill. TIGER Grant Project TIGER Grant project components (County Match) include: Conversion of Eiwa Street W17TGR Engineering Bond 1 R Uhu`e $ 149,515 $ 149,515 $ - Doug H. Project completed. In close-out. $ to a transit hub; streetscape The County's involvement are due to two roadways on top of a levee Work on confirming decommission through Leonard Kaui and earthen dam of which are the Property Twin Reservoirs foundations of these roadways. W10046 Engineering Bond-BAB Kawaihau $ 2,264 $ 2,264 $ - Donald F. $ _ Decommissioning being discussed Work on Mail out information for affected land owners after with private land owners, state and FEMA finalizes CLOMR final map USACE Project is to address drainage Project has been on hold pending Grove Farm's completion of Wa`a Road Drainage Study issues along Waa Road during rain W14006 Engineering Bond-BAB Lihu`e $ 100,000 $ 100,000 Stanford its design plans. The funds will be reallocated to a new CIP $ (100,000) $ - events. project of the Vertical Landfill Expansion. 1) Construct sidewalk on the mauka side and bike lanes on Ho`olako Street along the existing soccer fields; (2) Extend Ho`olako Street from the soccer fields to Ahukini Hoolako/Kaana Parcel Road, with two lanes in each W21010 Engineering Bond Lihu`e $ 3,100,000 $ 3,100,000 $ - MM Funds were reallocated to other priority projects. $ Improvements direction, lanes, on -street parking, and sidewalks; (3) connect the two ends of existing Kaana Street with two lanes in each direction, lanes, on -street parking, and sidewalks. KoloaIntersection Development Fund monies to be towards intersection W16009 Engineering Development Koloa $ 40,250 $ 40,250 Michael M Intersection improvements for a roundabout at Koloa Road $ 40,250 ements Improvements used and Kalanikaumauka Drive. improvements Koloa/Po'ipu Intersection Development Fund monies to be Z15105 Engineering Development Koloa $ 6,500 $ 6,500 Michael M Intersection improvements for a roundabout at Koloa Road $ 6,500 Improvements used towards intersection and Kalanikaumauka Drive. Project Contingency Contingency fund for Development W08002 Engineering Development Islandwide $ 35,568 $ 35,568 Michael M Contingency funds available for various Development projects. $ 35,568 projects CFD-Po'ipu Road Multimodal This project involves Po'ipu Road Stakeholder meetings were held. Public meetings being held. Improvements Improvements and implementation W13014 Engineering General Koloa $ 217,313 $ 472 $ 216,841 MM Funds transferred from CFD Funds $ 216,841 of complete streets. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 ENGINEERING-ROADS-PW PROJECTS The scope of this project includes (1) a sidewalk on Ho'onani Road from Lawai Road to a the Waikomo Stream Bridge, (2) a marked pedestrian lane on the makai side of Ho'onani Road between the CFD-Ho'onani Road / Waikomo Stream Bridge and Kapili W21011 Engineering General Koloa $ 350,000 $ 350,000 MM $ 350,000 $ 700,000 Sidewalk Pedestrian Lane Road, and (3) a sidewalk on the mauka side of Ho'onani Road between the Kiahuna Plantation Resort beach parking lot and the Ho'onani Road cul-de-sac. Filling sidewalk gaps and crossing improvements on Lawai Road between the Poi'pu Roundabout and CFD-Lawai Road / Complete Kukuiula Harbor; the gaps to be Sidewalk filled are as follows: (1) from Ho'ona W21012 Engineering General Koloa $ 300,000 $ 300,000 MM $ 300,000 $ 600,000 Road to Prince Kuhio Condominiums, and (2) from Amio Road to past Alania Road. Pedestrian and bicycle facilities on roads that access to Poi'pu Beach park, (1) a shared use path or wide sidewalk on the west side of Hdowili Road between Poi'pu Road Gi Beach and Ho`one Road, (2) a marked W21014 Engineering General Koloa $ 1,693,707 $ 1,693,707 MM $ 1,693,707 $ 3,387,414 Pedestruianinn / Bicycle Access pedestrian lane on Ho'one Road between Waiohai Beach and Nalo Road, and (3) filling sidewalk gaps at several locations on Pe'e Road. -Resolve possible right-of-way inconsistency Resurfacing and safety - Reach out to property owners for donation of land, if Kilauea Road/Kolo Road improvements on Kolo Road and necessary resurfacing and safety Kilauea Road -to be combined with W19001 Engineering General Hanalei $ 50,000 $ 50,000 Lee S. - FHWA-CFL negotiating a final design contract with their $ 50,000 improvements Federal Lands Access Project consultant (FLAP) - Receive final draft agreement from FHWA-CFL - Finalize agreement with FHWA-CFL 1) Construct sidewalk on the mauka side and bike lanes on Ho'olako Street along the existing soccer fields; (2) Extend Ho'olako Street from the soccer fields to Ahukini Hoolako/Kaana Parcel Road, with two lanes in each New Engineering General Lihu`e $ 1,400,000 $ 1,400,000 $ - MM The funding for this project was reallocated to other priorities $ Improvements direction, lanes, on -street parking, via a money bill. The project is on -hold. and sidewalks; (3) connect the two ends of existing Kaana Street with two lanes in each direction, lanes, on -street parking, and sidewalks. Project to perform bridge Biennial Bridge Inspections inspections at all County bridges W96388 Engineering Highway Islandwide $ 502,197 $ 19,900 $ 482,297 Donald F. The County has done a contract amendment to add this work $ 482,297 over 20 ft. in length every two as an additional phase to the current contract. years. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 ENGINEERING-ROADS-PW PROJECTS M .• • -• M, � V11;1WPI N Comprehensive Road Consultant to evaluate road W13011 Roads Highway Islandwide 067 $ 36,,. $ 36067 Scott S. Funds will be used for next update in 2020. Roads Division is $ 36,067 Maintenance Plan conditions of County roads considering the LITAR technology. Hanapepe Bridge Working on design via amendment to bridge inspection Reconstruction (County Pedestrian Walkway Replacement W12069 Engineering Highway Waimea $ 24,448 $ 24,448 Donald F. contract. Amendment executed on 11/16/2019. Design work $ 24,448 Match) has commenced. Hanapepe Moi Road Design and construct new sidewalk W17000 Engineering Highway Waimea $ 375,000 $ 375,000 Joel B. Design was being performed in-house. Ready for Engineer $ 375,000 Sidewalk along Moi road review. Seeking 343 exemption. Hanapepe Road Resurfacing Project involves incorporating W12067 Engineering Highway Waimea $ 15,902 $ 79 $ 15,823 Joel B. Design contract in place. County match will be approximately $ 15,823 (County Match) complete street concepts along with $65k. the road resurfacing. Kapahi Bridge Replacement Replace dilapidated bridge. W05368 Engineering Highway Kawaihau $ 21,207 Donald F. Project Complete. Balance of funds will be transferred for use $ (21,207) $ - (County Match) on the Maluhia/Koloa Road CIP project. - Maluhia Road - final striping and guardrail work to be Koloa/Maluhia Road Project addressing portions of W19021 Engineering Highway Koloa 406,346 261,795 144,551 MM completed in March 2021 Koloa Road 144,551 Improvements Koloa, Maluhia Roads. $ $ $ - work ongoing $ - Roundabout work ongoing - Change order for weather delays - pending review - Schedule community meetings about preliminary plans (Olohena Bridge 2) - Utility Agreements, Draft ROEs need to be compiled with exhibits and sent to owners Olohena Road Project Olohena Road (RTE 581) W19002 Engineering Highway Kawaihau $ 332,492 $ 332,492 MM - 100% plans in progress $ 332,492 Improvements - Amendment for Bridge Widening pending - will add contract time till completion - Working with KIUC on utility pole relocations - Driveway field visit - need to follow up with Regulatory Section Bridge inspection reports identified Puuopae Bridge this bridge to be in poor condition. W10003 Engineering Highway Kawaihau $ 77,003 $ 52,106 $ 24,897 Joel B. Project Complete. Balance of funding to be reallocated to $ (24,897) $ Replacement (County Match) Project involves design and another project. construction of new bridge. Pua Nani Road Drain Repair Project involves work to repair W18004 Engineering Highway Lihu`e $ 20,309 $ 20,309 Troy T. Project complete. Balance of funding to be reallocated to $ (20,309) $ - existing drain along Pua Nani Road another project. This project will reconstruct Puhi Puhi Road Construction Road from Kaumuali`i Hwy to W12010 Engineering Highway LThu`e $ 18,938 $ 18,938 Donald F. Project held open for future phases as STIP funding becomes $ 18,938 (County Match) Kaneka Street. Complete streets available. concepts will also be included. Resurfacing Various Project addressing portions of Collector Roads (County Hauaala, Mailihuna and Olohena W07008 Engineering Highway Islandwide $ 35,265 $ 8,838 $ 26,427 Joel B. Work on various collector roads Islandwide. $ 26,427 Match) Roads. Speed Hump/Traffic Calming Project to respond to resident Program concerns of localized W98364 Engineering Highway Islandwide $ 68,080 $ 68,080 MM Traffic Calming Program $ 68,080 speeding/dangerous driving. Project to perform bridge County Bridge Inspections inspections at all County bridges W20020 Engineering Highway Islandwide $ 400,000 $ 298,718 $ 101,282 Donald F. This phase is in progress. $ 101,282 and effect repairs for bridges under 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 FIRE DEPARTMENT PROJECTS Roads Division staff completed rock installation in the parking lot. The chairs ordered arrived. An alternate plan for Fire Station(s) Improvements CIP projects to correct deficient W12012 Fire Bond LThu`e & Kalalea $ 200,000 $ 65,926 $ 134,074 Mike C. completing the driveway that may save funds. Will be working $ 134,074 pavement areas. on implementation of the plan which includes a concrete apron for the approach to Fire's bay and changing the scope of work for the driveway. The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project is the design and and angles are adequate. The team is working on cost Helicopter Hangar construction of a helicopter hangar W 18018 Building, Fire Bond-BAB Lihu`e $ 1,485,000 $ 1,485,000 Doug H. estimates to enhance security measures to protect the $ (685,732) $ 799,268 to house the KFD helicopter. helicopter, and develop infrastructure (concrete pad, utilities, approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $73,000 for BMPS at RTS Islandwide, $330,960 Wailua Manhole Improvements, $235,200 Vertical Landfill Expansion, and $46,572 KWMCH improvements. The CIP team is working on the potential off -site location at the Honsador property. This location will minimize response time by approximately 9 minutes and save money. The helicopter pilot confirmed that the landing approach distances Project involves design and and angles are adequate. The team is working on cost KFD Helicopter Hanger Pad construction of a hangar pad to F14001 Building, Fire Bond-BAB Lihu`e $ 234,267 $ 234,267 Doug estimates to enhance security measures to protect the $ (234,267) $ - house the KFD Helicopter. KFD is helicopter, and develop infrastructure (concrete pad, utilities, supplying the hanger structure. approach, etc.) and preparing an RFP for professional services. The reallocated funds will be used as follows: $184,585 a new project for KFD Clean Emissions, $35,000 for a new project KPD Vehicle Lift, and $14,682 for a new project BMPs at RTS Islandwide. Data collection is almost complete and they will be moving into Project to determine future resource phase II of the project, which is an evaluation of the current KFD Utilization and needs to align service facilities with F20000 Fire Bond North Shore $ 130,834 $ 121,519 $ 9,315 Derek T. condition of the department. There are 5 phases to the $ (g 315) $ - Operational Study population areas and future project. Phase III is System Demand Projections, Phase IV is demographic shifts. Proposed Strategies / Recommendations and Phase V is Delivery and Presentation. Project is the design and Construction bids came in much higher than anticipated. A Helicopter Hangar construction of a helicopter hangar W 18018 Building, Fire General Li $ 120,000 $ 120,000 Doug H. design/bid contract is being utilized with the low bidder. Thehu`e $ 120,000 to house the KFD helicopter. contractor, PM, and KFD are working together to value engineer the project to meet budgetary constraints. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 HOUSING DEPARTMENT PROJECTS Phase I infrastructure commenced in November of 2020. Lima Ola Onsite Phase I Project to develop affordable Work is ongoing and more or less on schedule save for rain Infrastructure housing in Kalaheo. H18001 Housing Bond-BAB Kalaheo $ 5,819,203 $ 3,118,853 $ 2,700,350 Del delays connected to island wide flooding in April of 2021. The $ 2,700,350 site -work completion is estimated to be January 2022 due to rain delays. Long -Range Planner is working with consultant for community engagement phase of the project. Surveys of Waimea and Acquire 419 acre parcel located Kekaha residents were completed. Virtual engagement Waimea Land Acquisition between Waimea baseball park and W20015 Housing Bond Waimea $ 100,000 $ 100,000 $ - Ka'aina meetings were held on March 18, 2021 and March 20, 2021 to $ - Kekaha Road connect with community and solicit feedback of potential uses of the property. This process will continue for the next few months. Energy sustainability project to heat the hot water system via a CFD-Pa'anau Phase I Solar hot water heating system for solar panel system. IFB was published resulting in the cost Energy Sustainability development. W21013 Housing General Koloa $ 636,000 $ 636,000 TBD estimate. Housing will work with OED Energy Sustainability $ 636,000 $ 1,272,000 Upgrades staff person to refine the project to create maximum efficiencies. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 IT-FINANCE-HR-PLANNING DEPARTMENT PROJECTS 1 1 1 1 Infrastructure improvements completed for Sungard IT Infrastructure ERP/Financial system, fiber Improvements (Multi -phase) network connectivity, disaster X10006 IT Bond Islandwide $ 359,799 $ 359,799 $ - Del S. Project complete. $ - recovery capability, and virtual server environment with expanded storage. Project involves multiple automation initiatives to enhance Payroll/Personnel existing systems/operations X10001 IT, Finance Bond-05 Islandwide $ 202,089 $ 196,079 $ 6,010 Del S. Several phases of project completed. Balance of funding $ 6,010 including: Employee Self Service, being absorbed into new HMRS project described below. On Boarding, Performance Evaluation, and Time/Attendance. Emergency Generator This project involves replacing the Design/Installation emergency generator that services W20001 IT Bond Uhu`e $ 150,000 $ 150,000 $ - Wade L. Project is complete. $ the IT department. Project to replace HVAC system Project to put IT servers on separate HVAC system to protect servicing the IT center to protect it servers against over heating, unplanned shutdowns and IT HVAC Replacement from potential damages as a result W20002 IT Bond LThu`e $ 300,751 $ 300,751 $ - Del S. accidental reprogramming. Secondly, the system will be $ of power failures and overheating. moved out of the IT space where employees are working. The project is in progress. Installation is underway. Project to put IT servers on separate HVAC system to protect IT Infrastructure servers against over heating, unplanned shutdowns and Improvements (Multi -phase) X10006 IT General Islandwide $ 286,315 $ 286,315 $ - Doug H. accidental reprogramming. Secondly, the system will be $ - moved out of the IT space where employees are working. The project is in progress. Installation is underway. Software program for managing Funds added via a money bill to increase the budget for this HRMS, Payroll & Personnel HR, payroll, scheduling, OT, J20000 IT-HR General LThu`e $ 1,684,927 $ 1,341,011 $ 3,025,938 Del S. project. $ 3,025,938 benefits, etc. Project to evaluate all of the IT Systems County -wide County IT needs (current & future) The selected consultant is evaluating the current practices and evaluation, design and to ensure that County systems X20001 IT -Planning -etc. General LThu`e $ 1,000,000 $ 1,000,000 $ - Del S. systems in order to prepare its recommendations. The $ - implementation develop with the organizational preliminary recommendations are expected in 2Q 2021. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 KEMA PROJECTS 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 OED PROJECTS 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 PARKS DEPARTMENT PROJECTS .• • -•103 Mot Project is to incorporate the newly acquired parcels (Hodges, Black Pot Improvements To further design and obtain and Canoe Hale Areas) into existing Master Plan for Park. (design & permitting) permits for Master Plan. R18007 Parks Bond-BAB Hanalei $ - $ - $ - William T. Master Plan in public input phase until 3/18/2021. Final $ - revisions incorporated by end of June 2021, followed by delivery to Council. Hanapepe Stadium Includes new comfort station, food Design contractor is working on permitting. R17001 Parks Bond-05 Waimea $ 18,422 $ 11,700 $ 6,722 William T. Received State grant. Requires County match. Due to funding $ 6,722 Improvements booth and ticket booth. constraints, no additional funding available in FY21-FY22 Kalaheo Neighborhood Gym Construction funds to repair gym Project completed. In close-out phase. Any remaining funds (Roof Reconstruction) roof and to partially harden facility R18009 Parks - Building Bond-BAB K61oa $ 95,719 $ 41,211 $ 54,508 Doug H. will be reallocated to other projects. $ (54,508) $ - as a hurricane shelter Kapa'a Pool Restroom Kapaa Pool Filter &Pump System R14002 Parks Bond-BAB Kawaihau $ 80,000 $ 200 $ 79,800 William T. Applying to Planning for a permit exemption. Plans and specs $ 79,800 Reconstruction ready to publish by June 2021. Kapaa Stadium Consultant to assist in planning and designing R18002 Parks BOND Kawaihau 67,135 Nancy M. Project completed. In close-out phase. Any remaining funds next phase of $ 67,135 $ $ 67,135 Improvements improvements. will be reallocated to other projects. Salt Pond Beach Park Super Parks project which includes The funding for this project will be reallocated to the new Facility Improvements comfort stations and pavilions R12002 Parks Bond-05 Waimea $ 73,000 $ 73,000 William T. KWMCH improvements project. $ (73,000) $ - repairs and upgrades. Salt Pond Beach Park Super Parks project which includes Part of the super -parks program. Poi'pu park completed. Facility Improvements comfort stations and pavilions R16001 Parks Bond-BAB Waimea $ 50,000 $ 50,000 William T. Development of scope to begin and align with timing of waste $ 50,000 repairs and upgrades. water improvements to the park. Salt Pond Wastewater Project will identify and construct improvements W14005 Engineering, Bond-BAB Waimea 120,005 120,005 Donald F. Project completed. The Remaining funds ($97,589) were Improvements to the waste water Parks $ $ $ - reallocated to the HMRS project via a money bill. $ _ system as Salt Pond. Veterans Cemetery Project improvements include R10013 Parks Bond-BAB Waimea 87,492 87,492 Wally R. Construction of the six -acre expansion of the cemetery is set 87,492 repairs and upgrades for the $ $ $ Improvements Communal Hall Facility to commence April 2021. Wailua Golf Course Replace Project replacing existing main R13009 Parks Bond-05 LThu`e $ 20,000 $ 20,000 $ - Wally R. Project complete. $ - Existing Water Lines potable lines on the golf course. Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R13A09 Parks Bond 05 Uhu`e $ 14,455 $ 4,493 $ 9,962 Wally R. for R2 discharge increase relating to WW project to abandon $ 9,962 ocean outflow at Wailua WWTP. Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R131309 Parks Bond 1 R Lihu`e $ 9,072 $ 9,072 Wally R. for R2 discharge increase relating to WW project to abandon $ 9,072 ocean outflow at Wailua WWTP. Wailua Golf Course Replace Project replacing existing main Project moving forward. Parks and WW are working together Existing Water Lines potable lines on the golf course. R13C09 Parks Bond IT LThu'e $ 36,473 $ 36,473 Wally R. for R2 discharge increase relating to WW project to abandon $ 36,473 ocean outflow at Wailua WWTP. Habitat Conservation Plan Endangered Species habitat W08012 County Attorney- General Islandwide $ 40,474 $ 40,474 Pat P. Annual funding. $ 40,474 conservation Plan Parks Kapule Counters Renovation Project is in progress. Counters and floor covering has been (RPA/Planning) Renovate RPA area. W19105 Parks General Uhu'e $ 150,000 $ 135,163 $ 14,837 Kathleen S. replaced. Door and hardware is on order and will be installed $ 14,837 upon delivery. Project completion is targeted for April. Park Improvement: Waimea W96073 Parks General Waimea $ 6,466 $ 6,466 William T. Park improvements for this district. $ 6,466 District 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 PARKS DEPARTMENT PROJECTS Waimea/Kekaha ADA ADA Improvements of two parks in Received draft plan from design consultant. Staff is R18015 Parks General Waimea $ 561,932 $ 250,000 $ 311,932 William T. reviewing. $250,000 of this budget was transferred via a $ 311,932 Improvements West Kauai. money bill for repairs to the Kapaa Neighborhood Center Pool. Historic County Building Improvements to the Historic Project Complete. Balance of funding to be reallocated as Security & Grounds R20000 Parks General Lihu'e $ 295,265 $ 1,498 $ 293,767 Brian E. follows; $41,324 to BMPs at RTS Islandwide, and $252,443 to $ (293,767) $ - Improvements County Building facility and grounds Wailua Emergency Manhole Upgrades (W20030). Inclusive Playground Development of a playground R20020 Parks General Islandwide $ 400,000 $ 400,000 William T. RFP In Purchasing for approval and publication. Estimated $ 400,000 Development designed for special needs youth. completion date 6/30/2021. The project is to formulate a re- Design on going. Parks plans on getting design work Islandwide Playcourt surfacing program for the play R20010 Parks General Islandwide $ 250,000 $ 153,000 $ 97,000 William T. completed and project shovel ready in the event funding $ 97,000 Resurfacing courts (tennis, basketball) at County became available. Funding may be made available in CIP parks. budget. Estimated completion of design work is 3/2021. Phase I will replace ADA approved Islandwide Playground equipment at Waimea, Kekaha, R20005 Parks General Islandwide $ 91,679 $ 6,331 $ 85,348 William T. All FY20 repairs completed. No additional funding available at $ 85,348 Equipment Kapahi, Wailua Houselots, Eleele this time. Nani & Peter Rayno parks. This project is to develop locations Brian J. Baptiste park project complete (adding lighting). Skateboard Parks (Design & so skateboarders can have a safe R20015 Parks General Islandwide $ 400,000 $ 400,000 William T. Cares Act funding was utilized for a grant to an NGO to make $ 400,000 Development) environment. improvements which were completed before the end of 2020. Hanapepe: Quick build items on order Kalaheo Neighborhood Gym Repairs to gym floors, roof, doors, R15015 Building/Parks Special Trust Kalaheo $ 567 $ 2 $ 565 Doug H. Work is complete. Project is in close-out phase. Any $ 565 Improvements etc. remaining funds will be reallocated to other projects. Park Imp. & Equip.: Koloa Grant funds for local community W93086 Parks Special Trust Koloa $ 9,268 $ 9,268 William T. Funds for parks improvements and equipment. $ 9,268 Dist. organizations. Park Imp. Grant, Koloa Dist. Grant funds for local community W96087 Parks Special Trust Koloa $ 11,000 $ 11,000 William T. Funds to support recreational organizations through grants. $ 11,000 organizations. Parking Lot/Play Court Project for Koloa N/C parking and Koloa Park Basketball/Tennis Court R15108 Parks Special Trust K61oa $ 164,289 $ 164,289 William T. $ 164,289 Resurfacing Resurfacing Kamalani Playground Project to resurface the playground R18003 Parks Special Trust LThu'e $ 81,371 $ 81,371 Klayford N. $ 81,371 Resurfacing area. Includes repairs to floor tiles, roof, Backstage area refurbishment is 90% complete. New KWMCH Improvements air conditioner system and repaint R18004 Parks Special Trust LThu'e $ 178,330 $ 19,949 $ 158,381 Wally R. counters, light fixtures, costume racks, painting, etc. has been $ 158,381 completed. Park Imp.: Lihu'e Dist. Grant Grant funds for local community W96102 Parks Special Trust LThu`e $ 42,600 $ 42,600 Wally R. Funds to support recreational organizations through grants. $ 42,600 organizations. Park Imp. & Equip. Kawaihau W93116 Parks Special Trust Kawaihau $ 8,049 $ (30,852) $ 38,901 William T. Funds for parks improvements and equipment. $ 38,901 Dist. Park Imp. Kawaihau Dist. Funds to support recreational W96118 Parks Special Trust Kawaihau $ 30,000 $ 4,899 $ 25,101 William T. $ 25,101 Grant organizations through grants. Playground Improvements Replace/refurbish playground (Wailua Houselots and R16003 Parks Special Trust Kawaihau $ 19,245 $ 19,245 William T. $ 19,245 Homestead) equipment. This project is to develop locations Skateboard Park so skateboarders can have a safe R20025 Parks Special Trust Kawaihau $ 36,823 $ 36,823 William T. $ 36,823 environment. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 PARKS DEPARTMENT PROJECTS 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 PLANNING DEPARTMENT PROJECTS 1 1 1 1 Planning Dept. is working with the IT Division and the LIMS consultant to fully digitize the Planning Department's various Land Information Land Information Management application processes, including but not limited to zoning Management System System (LIMS) X18001 Planning Bond-BAB $ 1,876,806 $ 1,382,988 $ 493,818 Ka'aina H permits, use permits, special permits, special management $ 493,818 area (SMA) permits, as well as the shoreline setback determination and the additional dwelling unit (ADU) and additional rental unit (ARU) clearance form processes. Continuation of community West Kaua'i Development development plans in accordance Z18002 Planning Bond West Kauai $ 38,946 722 $ 6,, $ 32224 Ka'aina H Project complete. Balance of funds will be reallocated to other $ (32,224) $ Plan with the General Plan Update for projects. each district Islandwide. West Kaua'i Development Z18004 Planning General Waimea $ 2,217 $ 2,184 $ 33 Ka'aina H Project Complete. Balance of funding will be reallocated to $ (33) $ - Plan other projects. Project to evaluate all of the IT Systems County -wide County IT needs (current & future) The selected consultant is evaluating the current practices and evaluation, design and to ensure that County systems X20001 IT -Planning -etc. General L7hu'e $ 1,000,000 $ 1,000,000 $ - Del S. systems in order to prepare its recommendations. The $ - implementation develop with the organizational preliminary recommendations are expected in 2Q 2021. needs in mind. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 SOLID WASTE PROJECTS Material Recovery Facility Development of a material recovery W13001 Solid Waste Bond Lihu`e $ 5,995 $ 5,995 Allison F. Project is complete. Balance of funds is being transferred to $ (5,995) $ - facility. new FY2021 CIP project, BMPs at RTS Islandwide. New Landfill & Resource Recovery Park Development of a new landfill and W10037 Solid Waste Bond-BAB Lihu`e $ 1,916 $ 1,916 Allison F. Project is complete. Balance of funds is being transferred to $ (1,916) $ - Dev./Acquisition recovery park. new FY2021 CIP project, BMPs at RTS Islandwide. (Plans/Design) Project involves design and This project is being transferred to a new CIP project, BMPs NPDES Compliance construction of NPDES compliance W13010 Solid Waste Bond-BAB Islandwide $ 208,392 $ 208,392 Allison F. at RTS Islandwide. This funding will move over to that project. $ (209,392) $ (1,000) items at various transfer stations. SW will seek a CWSRF loan for most of the cost. Budget is to develop the design to 60% complete. Current Project involves design and status is at 10%. Project will require additional funding to NPDES Compliance construction of NPDES compliance W13A10 Solid Waste Bond-BAB Islandwide $ 72,029 $ 72,029 Allison F. complete design work, plans, and construction. This project $ 72,029 items at various transfer stations. will address all four transfer stations. The target is commence 1 nis project seeks to determine the with the 1st construction project in the 2Q 2020. feasibility of converting the Green Selection committee including one non -government employee Waste to Energy Project Energy Plant located near Mt. Kahili W21025 Solid Waste General Koloa $ 300,000 $ 300,000 Keith P. is seeking professional service solicitations for the work. The $ 300,000 to incinerate trash. committee will review the respondents. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 TRANSPORTATION PROJECTS This project account is used for the design and installation of Development Fund monies to be bus stops Islandwide. Phase IV was completed and future Islandwide Bus Stops used towards the design and T19000 Transportation Development Islandwide $ 27,600 $ 27,600 Leonard P. funding requests will be made in accordance with growth in $ 27,600 installation of bus stop various districts resulting in increased ridership, and increases improvements. due to reconfiguration of traffic patterns and road improvements. Development Fund monies from Wailua Bus Stop PDU-2015-7. Development Fund T16100 Transportation Development Kawaihau $ 6,579 $ 6,579 Leonard P. Funds from this development will be utilized for bus stop $ 6,579 monies to be used towards Wailua improvements in the area. area bus stop improvements. Project is to expand the administrative office and capabilities Expansion of Bus Facility Expansion of administrative offices W20040 Transportation GET LThu`e $ 225,000 $ 113,754 $ 111,246 Leonard P. at the transit facility. The building has arrived and a permit $ 111,246 at bus transit facility Transportation application with the building department has been submitted. Anticipate to in placed in service in 3Q 2021. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 WASTE WATER PROJECTS 1 1 1 1 This project is in the planning stage. Once the Section 7 is The `E subdivision collection completed, the project can move into the design phase. The has system has had numerous sewer funding for the design and construction is estimated at $3.35M line breaks. The Department of and will be secured via a CWSRF loan. The funds from this Health, Wastewater Branch (DOH project are being combined with funds from other projects. Ele'ele WWTP WWB) directed the County to W21A05 Waste Water General Ele'ele $ 27,281 $ 2,059 $ 25,222 Jason The new project is noted below and listed at the end of the $ 25,222 Improvements address the sewer line issues. A Bond Section. The consultant estimates work to be complete section 7 clearance with FWL is between 3-6 months (April -July 2021). The final letter report needed to amend the consultant's should be submitted to USFWS by March 30. Once consultant contract to include this specification completes work, WW will be able to go out to bid on the into the SOW. project. Wailua NPDES Effluent Project is to develop a replacement system to handle outflow so the W18011 Waste Water Bond-2018 LThu`e $ 1,339 $ 1,339 $ - Jason Amended contract completed. $ - Modifications (Design) ocean outflow can be abandoned. Rehabilitate Wailua SPS 1 and Seeking SRF funds in order to commence construction in Wailua SPS 1 Rehabilitation change to a submersible pump W19006 Waste Water Bond Kawaihau $ 1,104 $ 1,104 $ - Jason FY2021. $ _ station. Rehabilitate Wailua SPS 3 and Seeking SRF funds in order to commence construction in Wailua SPS 3 Rehabilitation change to a submersible pump W19007 Waste Water Bond Kawaihau $ 2,676 $ 2,676 $ - Jason FY2021. $ _ station. Wailua WWTP Project involves improvements and Amendment completed. The project is on hold pending Improvements/Renovation renovation work at the Wailua W10014 Waste Water Bond-1R Kawaihau $ 165,104 $ 165,104 $ - Jason securing additional funding for next phase. $ _ WWTP. Wailua WWTP Project involves improvements and W10A14 Waste Water Bond Kawaihau 130,000 130,000 Jason Amendment completed. The project is on hold pending renovation work at the Wailua $ $ $ - $ Improvements/Renovation WWTP. securing additional funding for next phase. Project is out to bid on 2/24/2021, closes 3/24/2021.Working Waimea R-1 Water Project involves developing a R-1 with County Attorney to get the CM and Construction contracts Distribution System water distribution system. W14078 Waste Water Bond-05 Waimea $ 30,993 $ - $ 30,993 Jason reviewed in order to meet deadlines with DOH. NTP projected $ 30,993 Improvements in Mid -April. The contract period is 9 months. Completion by FY 22 1 Q. Project is for irrigation upgrades, rehabilitation of the force main line, Project is out to bid on 2/24/2021, closes 3/24/2021.Working Waimea WWTP R-1 and design and construction of a with County Attorney to get the CM and Construction contracts Distribution (design) storage tank for the R-1 grade W18017 Waste Water Bond-2018 Waimea $ 55,003 $ - $ 55,003 Jason reviewed in order to meet deadlines with DOH. NTP projected $ 55,003 water. Construction funding of the in Mid -April. The contract period is 9 months. Completion by tank will be secured through an FY 22 1Q. SRF loan. Project is to upgrade obsolete facilities along the sewer line in Upgrades to the collection system Kapaa, Waipouli, etc. Replace aging lift pumps with new Sewer Collection System in east Kauai. Includes lift stations, W20010 Waste Water Bond Kawaihau $ 125,199 $ 125,199 Donn K. technology that is based on submersible pumps, rather than $ (125,199) $ - Upgrades pumps, sewer lines, electronics, pumps and separate elevators. Funds from this project will be etc. reallocated to the Waimea R-1 Environmental Requirements project below. Construct R-1 recycled water storage and distribution system to This is a priority project to address DOH violation of poor wet - Waimea R-1 Environmental address DOH violation of wet well W21000 Waste Water Bond Waimea $ 125,199 $ 113,902 $ 11,297 Jason K. well performance. This is designated as a life/safety priority $ (11,297) $ - Requirements functionality and offset the need to project. Balance of funds from this project will be reallocated use potable water for irrigation to Wailua Emergency Manhole Upgrades project (W20030). purposes. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 WASTE WATER PROJECTS Upgrades to the collection system Project is to upgrade obsolete facilities along the sewer line in Sewer Collection System in east Kauai. Includes lift stations, W20A10 Waste Water Bond Kawaihau $ 32,681 $ 32,681 Donn K. Kapaa, Waipouli, etc. Replace aging lift pumps with new $ 32,681 Upgrades pumps, sewer lines, electronics, technology that is based on submersible pumps, rather than etc. pumps and separate elevators. Waimea Wastewater Determine the feasibility and W20015 Waste Water Bond Waimea $ 151,602 $ 151,602 Donn K. The funds were reallocated via a money bill to a new priority $ (151,602) $ - Environmental Requirements condition of the two reservoirs. project (Waimea R2 Reuse). Waimea Wastewater Determine the feasibility and W20A15 Waste Water Bond Waimea $ 48,398 $ 48,398 Donn K. The funds were reallocated via a money bill to a new priority $ (48,398) $ - Environmental Requirements condition of the two reservoirs. project (Waimea R2 Reuse). Development of a R-2 recycled This project will resolve the DOH violations of the high Waimea R2 Reuse water reuse project to resolve UIC W20015 Waste Water Bond Waimea Donn K. pressures in the UIC wells and return the UIC wells to its $ 151,602 $ 151,602 performance violations and return intended purpose as a back up system. Funds from the the UIC wells to backup disposal. above noted project are being reallocated to fund this project. Development of a R-2 recycled This project will resolve the DOH violations of the high Waimea R2 Reuse water reuse project to resolve UIC W20A15 Waste Water Bond Waimea Donn K. pressures in the UIC wells and return the UIC wells to its $ 48,398 $ 48,398 performance violations and return intended purpose as a back up system. Funds from the the UIC wells to backup disposal. above noted project are being reallocated to fund this project. Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. Wastewater Facility Plan Assess County wastewater system W20005 Waste Water Bond Islandwide $ 233,095 $ 233,095 $ - Jason PO was issued in February. Sampling to commence in March- $ - April. Eleele-the consultant will be submitting a draft report on 5/31/2021. Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. PO was issued in February. Sampling to commence in March - Wastewater Facility Plan Assess County wastewater system W20A05 Waste Water Bond Islandwide $ 189,922 $ 184,622 $ 5,300 Jason April. Eleele-the $ (5,300) $ - consultant will be submitting a draft report on 5/31/2021. Remaining balance of funds will be reallocated to the Wailua Emergency Manhole Upgrades project (W20030). Lihue update is on hold. WW will be doing sampling once purchased sampling equipment that was purchased arrives. Wastewater Facility Plan Assess County wastewater system W201305 Waste Water Bond Islandwide $ 193,921 $ 193,921 $ - Jason PO was issued in February. Sampling to commence in March- $ - April. Eleele-the consultant will be submitting a draft report on 5/31/2021. Rehabilitate the existing sewer lines in the 'Ele'ele Subdivision, where we The amendment to the contract was executed and the have experienced failures and required U.S. Fish and Wildlife Survey will begin. The Ele'ele WWTP spills. We will also construct new R21005/ consultant hired will take between 3-6 months to complete the Improvements sewer lines in order to provide relief R21A05 Waste Water Bond Ele'ele $ - Jason K. work and when done, they will be able to go out to bid on the $ 27,281 $ 27,281 to the capacity of sewer lines which W21005 project. become overwhelmed in storm The consultant coordinated with their sub consultant and the events and result in raw wastewater final letter report should be submitted to USFWS (March 30). spills. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1 County of Kauai CIP Budget FY2021-202 WASTE WATER PROJECTS 1 1 1 1 Rehabilitate the existing sewer lines The amendment to the contract was executed and the in the'Ele'ele Subdivision, where we required U.S. Fish and Wildlife Survey will begin. The have experienced failures and consultant hired will take between 3-6 months to complete the Ele'ele WWTP spills. We will also construct new work and when done, they will be able to go out to bid on the sewer lines in order to provide relief W21005 Waste Water General Ele'ele $ 13,747 $ 13,747 Jason K. project. $ Improvements to the capacity of sewer lines which The consultant coordinated with their sub consultant and the become overwhelmed in storm final letter report should be submitted to USFWS (March 30). events and result in raw wastewater The funding for the design and construction is estimated at spills. $3.35M and will be secured via a CWSRF loan. Upgrade the two transition To pay for the repairs, the Administration proposes to manholes to provide an upgrade to reallocate $252,443 from the Historic County Building Security Wailua Emergency Manhole the Division's sewer collection project which is complete, $330,960 from the Helicopter Upgrades system. This will allow for public W20030 Waste Water General LThu`e $ 84,750 $ 84,750 Jason Hangar project which will be done at a lesser expense, $5,300 $ 600,000 $ 684,750 safety and proper conveyance of in savings from the Waste Water Fac Plan update, and raw wastewater to the Wailua $11,297 from the Waimea Environmental R1 project. WWTP. This project will design the expanded reuse infrastructure at the Working on EA. DOH had comments on scope of work on Wailua WWTP Wailua Golf Course and the W20025 Waste Water General Kawaihau $ 110,963 $ 110,963 $ - Jason 2/25/2021. Comments passed along to consultants to adjust $ - Improvements/Renovation process improvements at the plant approach to execute the project based on the comments. in order to reliably produce R-2 recycled water consistently. Meeting with IT who related that they have a team and a game plan on approach to the project. February 9th was the last Wastewater Billing System Upgrade the billing system. W20035 Waste Water General LThu`e $ 200,000 $ 1,920 $ 198,080 Jason update from IT. Project has not made any substantial $ 198,080 Upgrades progress in 3 weeks. Moving forward we will be receiving weekly reports from the IT team involved in the project. This project will use the existing Navaline system for billings. 3/24/2021 \\cok-fs-01\home\wlord\CIP\Budget\FY 2021-2022\Analysis\03_2021_CIP Project Status Update-CC-V1