Loading...
HomeMy WebLinkAboutNR092019DPWF� OF THE COUNTY OF KAUA'I DEREK S. K. KAWAKAMI, MAYOR qa 4 MICHAEL A. DAHILIG, MANAGING DIRECTOR OF News Release For Immediate Release: September 20, 2019 DEPARTMENT OF PUBLIC WORKS LYLE TABATA, DEPUTY COUNTY ENGINEER Tel (808) 241-4992 Fax (808) 241-6604 Roadwork to continue in `Ele`ele and Hanapepe from Sept. 26 to Oct. 19 HANAPEPE and `ELE`ELE — The Department of Public Works is announcing that GP Maintenance Solutions will continue roadwork in `Ele`ele and Hanapepe on weekdays, from Sept. 26 through October 19, 2019. The scope of the work includes grass cutting, weed control of street and grassy shoulders, and seal coating of the roadway. The following areas will be affected: • Puolo Road and Hanapepe Access Road Near Hanapepe Stadium and portions of `Ele`ele Nani Subdivision on Sept. 30 through Oct. 4, 2019, from 7:30 a.m. to 4 p.m. (Installation of permanent striping). There will be roving and periodic lane closures. • Portions of the `Ele`ele Nani Subdivision on Sept. 26 through Oct. 9, from 7:30 a.m. to 5 p.m. (Grass Cutting and Weed Killing). No vehicle parking on the road or grassy shoulders. • Portions of the `Ele`ele Nani Subdivision on Sept. 30 through Oct., 19, from 7:30 a.m. to 6 p.m. (Seal Coating) No vehicle access on the roadway or grassy shoulders. No entering or exiting until the seal coat is dry and road reopened. No walking on wet seal coat. The work zone will be coned off to prevent anyone from driving or stepping on wet materials. Please see maps below for specific locations. Please be on the lookout for "No Parking" barricades and signs. This will be an indication that work is in the area. Please make the appropriate arrangements to accommodate the necessary road work. Vehicle parking on the streets and grassy road shoulders within the work zones during grass cutting, weed killing and seal coating will not be allowed. Any vehicle left on the street or grassy road shoulders within the work zones after 7:30 a.m. will be towed at the owner's expense. Work may be extended pending weather conditions. Vehicles and pedestrians should stay off the wet seal coating until the road is reopened. For questions regarding this project, please call GP Maintenance Solutions at 808-864- 0323. Salt Pond Country Store cc 0 y m U U Q N 0 N a C [9 Mariko d1 ■" MCS Grill 'PI farnI Grinds Hampepe Park p�o10 Beach Rd ph Photo caption: Puolo Road and Hanapepe Access Road Near Hanapepe Stadium and portions of `Ele`ele Nani Subdivision on Sept. 30 through Oct. 4, 2019, from 7:30 a.m. to 4 p.m. (Installation of permanent striping). There will be roving and periodic lane closures. GP Maintenaare Solutions P.O- Box 4319 H-1- Hawaii W81 Ph— (803)62-b081 Fax (WH)833�925i 10/4119 1017119 e4 9 y Y . row 10/1119 10/9119 , �1 d Y 10/2119 Kish. '�ervpir . 8 --� 10/3119 Cam � �- 9127119 9126119 9130119 Photo caption: Portions of the `Ele`ele Nani Subdivision on Sept. 26 through Oct. 9, from 7:30 a.m. to 5 p.m. (Grass Cutting and Weed Killing). No vehicle parking on the road or grassy shoulders. GpM0infenaUr0 P.O.B-4319 H—kh.H 9e812 Solutions A.— (806)682-a081 Fu' (808)833-9255 -1000�.. 10/14/19 - 10/15/19 10/1119 " 10l2/19 10/16/19 101319 1014/19 1117, 10/17/19 1h9119 l 10/19/10 Pam loll 1/19 9/30119 Photo caption: Portions of the `Ele`ele Nani Subdivision on Sept. 30 through Oct., 19, from 7:30 a.m. to 6 p.m. (Seal Coating) No vehicle access on the roadway or grassy shoulders. No entering or exiting until the seal coat is dry and road reopened. No walking on wet seal coat. The work zone will be coned off to prevent anyone from driving or stepping on wet materials.