HomeMy WebLinkAboutNR100920DPW
THE COUNTY OF KAUA‘I
DEREK S. K. KAWAKAMI, MAYOR
MICHAEL A. DAHILIG, MANAGING DIRECTOR
News Release
For Immediate Release: October 9 2020
DEPARTMENT OF PUBLIC WORKS
TROY TANIGAWA, ACTING COUNTY ENGINEER
Tel (808) 241-4993
Fax (808) 241-6604
Lane closures scheduled for portion of Wainiha Powerhouse Road
beginning Oct. 12
WAINIHA – The Department of Public Works is announcing that construction work will
begin on W ainiha Powerhouse Road on Oct. 12 from 7 a.m. to 6 p.m. on weekdays and from 9
a.m. to 6 p.m. on Saturday, as needed.
Dates and times are subject to change depending on weather and other conditions.
Contracted with Earthworks Pacific, Inc., the scope of work includes several culvert
replacements, existing box culvert repair, slope stabilization, paving, and guardrail
replacement/installation.
Road closures will be brief and announced on the message board at the intersection of
Powerhouse Road and Kūhiō Highway. If needed, transportation will be provided through the
work zone with pickup and drop-off at your residence and intersection with Kūhiō Highway.
Please provide a minimum of 1-hour notice for all transportation requests. For requests, call
Devin Quinn at 808-720-0407.
Motorists and residents are requested to use caution when traveling through the area,
observe all traffic controls and posted signs, and stay alert for construction personnel and
equipment.
Please allow extra time when traveling through this area.
Anyone with questions may contact EPI project manager, Devin Quinn at 808-720-0407
or the EPI office at 808-246-8808.
###