HomeMy WebLinkAboutNR021821DPW2DEREK S.K. KAWAKAMI, MAYOR
MICHAEL A. DAHILIG, MANAGING DIRECTOR
News Release
For Immediate Release: February 18, 2021
COUNTY OF KAUA‘I
DEPARTMENT OF PUBLIC WORKS
TROY TANIGAWA, ACTING COUNTY ENGINEER
(808) 241-4993
Road, lane closures for multiple sections of Kōloa Road and Maluhia Road scheduled
from Feb. 22 to Feb. 26
KŌLOA – The Department of Public Works and Goodfellow Bros. LLC. are announcing that
multiple sections of Kōloa Road and Maluhia Road are scheduled for lane closures from Feb. 22 to Feb.
26.
Multiple sections of Kōloa Road will be under a single-lane closure for shoulder construction
and pavement work from 7 a.m. to 6 p.m.
Eastbound motorists from the West Side, Kalāheo, or Lāwa‘i are recommended to take
Kaumuali‘i Highway to Maluhia Road to access Kōloa and Po‘ipū.
In addition, striping work is scheduled on Maluhia Road under a single-lane closure from 7 a.m.
to 5 p.m. Flaggers will be positioned to assist motorists. Traffic delays may occur during these closures,
so please plan ahead. Motorists are advised to follow all traffic control signs and personnel.
Dates and times are subject to change depending on weather and other factors.
As a reminder, Ōma‘o Road is a narrow residential road that is not intended to be used as a
detour route and not designed for high volumes of traffic or truck traffic. The speed limit is 25 mph for
the entire length of Ōma‘o Road. Through trucks are prohibited on Ōma‘o Road for the duration of this
project. If you have any questions or concerns, please contact Tristan Gonzales at 808-462-8057 or Ryan
Moura at 808-298-2431.
###