Loading...
HomeMy WebLinkAbout2024-5-3_Shoreline-Determinations_2024.6.4-PC.pdfDEREK S.K. KAWAKAMI, MAYOR REIKO MATSUYAMA, MANAGING DIRECTOR 4444 Rice Street, Suite A473 • Līhu‘e, Hawai‘i 96766 • (808) 241-4050 (b) An Equal Opportunity Employer DEPARTMENT OF PLANNING KA‘ĀINA HULL, DIRECTOR JODI A. HIGUCHI SAYEGUSA, Pursuant to Section 8-27.8 (5) of the Kaua‘i County Code (1987), as amended, A list of applications for a shoreline setback determination or determination of exemption deemed complete by the Director shall be posted within ten (10) working days to a publicized website maintained by the Department. SHORELINE SETBACK DETERMINATIONS Application No. Name of Applicant(s) Property I.D. (Tax Map Key) Location Development/Reasons Addition. Shoreline is accreting 1.7 tenths of a ft per year required setback 60 feet, proposal 340 feet from shoreline. Hotel Corp. dba Royal Sonesta Kauai resort Līhu‘e Required setback 100 feet from shore, tent is placed an additional 100 feet away from setback. Kōloa Repair of window, water heater, kitchen cabinets, and bathroom vanities. Unit A3. Property on 50-foot-high cliff bluff with a required setback of 65 feet. Work is an additional 27 feet (92 feet) outside of shoreline setback area. renovations of existing single- family residence. Accreting shoreline. Required setback 60 feet from shoreline. The development is approximately 416 feet away from the shoreline. County of Kaua’i, Department of Planning Shoreline Setback Determinations 2 | P a g e IV-A Mori Family Limited Partnership Bldg. 33 Unit 6, Unit 7, Unit8 and Unit 9 Po‘ipū foundations of building 33 and deck repairs. The required setback is 100 feet from the shoreline. Development is an additional 200 feet from required setback. entertainment area addition to existing residence. Required setback 151 feet. Development approximately an additional 150 feet away from required setback. Work deemed unsubstantial per DPW letter. landings along with plumbing repairs. Structures located on a 150-foot-high cliff bluff. The required setback is 100 feet from shoreline. All work is located an addition 120 to 140 feet away from required setback.